Field Office Compliance - Assistance


Assistance ID - 126126
Ottumwa City Of Stp - 310638325
2222 S. EMMA ST. Ottumwa, IA 52501
Wapello County

FO 6

Report
File Name File Type File Date Note
Comments
11/30/2022 Contractor was having issues land applying sludge (wet conditions/getting stuck). Incorporation was being utilized for vector control and the 6 hour timeframe elapsed. I instructed them to incorporate as soon as feasible. I asked Troy to summarize the incident and what he submtited is outlined below: Ottumwa Biosolids Incident, Narrative Summary 11/30/2022-12/5/2022 Troy Fadiga, Pretreatment Coordinator at Ottumwa Water Pollution Control Facility What Happened: Ottumwa Water Pollution Control Facility had 76.0 DMT of pressed anaerobic sludge that did not meet vector reduction requirements through our preferred method of demonstrating a 38% reduction in volatile solids. The sludge met Class B pathogen reduction requirements through sludge fecal analysis and met metals land application limits. We then decided to rely on incorporation to meet vector reduction requirements. We placed the sludge that needed incorporated into our middle sludge storage bay to keep it separate from pressed sludge that was suitable for surface application. Midwest Injection Inc. is our contractor for hauling and applying biosolids. On Monday 11/28/2022 Midwest Injection Inc. began hauling aerobic sludge from our western sludge storage bay. My understanding was that they would return Tuesday 11/29/2022 to haul and incorporate the anaerobic sludge. On Tuesday I did not see Midwest Injection staff at our facility, but I did go down to see the sludge storage bays, I saw the anaerobic sludge had been moved towards the front of the sludge storage bay. I sent an e-mail to our Midwest Injection Inc. contact, Chad Snapp to see if any of the anaerobic sludge had been hauled. At the end of the day on 11/29/2022 Tom Rea, who was working second shift (evening) on 11/28/2022, told me he saw them load anaerobic onto a truck when he came into work on 11/28/2022. I had him write down what he saw to include it in our biosolids files. I have attached a scanned copy of the hand-written note. The next morning on 11/30/2022 I went out to the fields where the biosolids were to be applied to see if the solids had in-fact been incorporated when they were hauled out on the afternoon/evening of 11/28/2022. There were several large piles of biosolids on the field and Chad Snapp was onsite. He told me he would respond to my e-mail, but that the six hour time limit for incorporation had been exceeded. I went back out after lunch to see if the sludge was incorporated. One pile was left to be spread and incorporated. By the time I got back to my office, I received the e-mail response from Chad saying that 5 loads of anaerobic had been hauled on 11/28/2022, but not incorporated within the six hours. By that time, the 5 loads of anaerobic sludge were on the field 40 to 48 hours before incorporation. After getting the e-mail as written documentation I called Iowa DNR field office 6 and spoke with Brian Lee. Remedy: The hauled anaerobic sludge was all incorporated by the afternoon of 11/30/2022. Chad Snapp was told the anaerobic sludge remaining in the middle sludge storage bay must be incorporated within the required 6 hours if it is hauled out. As of this writing, it is still sitting in the storage bay, but an e-mail was sent to Chad Snapp directing him to comply with the 6 hour limit. At a 12/5/2022 meeting of WPCF Supervisors, Pretreatment Coordinator, Superintendent, and the City Engineer it was decided by the City Engineer and WPCF Superintendent that the violation wasn’t significant enough to sever our contract with Midwest Injection Inc. The WPCF Superintendent is drafting a message to Midwest Injection Inc. management about our concerns with their service and the severity with which we consider the non-compliant incorporation of biosolids. At the 12/5/2022 meeting it was decided to have the remaining anaerobic sludge taken to the landfill instead of depending on Midwest Injection Inc. to incorporate it in the field. We declined to start doing 40 day sludge tests on anaerobic sludge that did not meet >38% volatile solids reductions. We decided to change our back-up method of vector attraction reduction from incorporation to landfill for pressed sludge, that change in plans will be incorporated into our 2023 5 year Biosolids Plan. 12/5/2022 Troy Fadiga BRIAN LEE