Field Office Compliance - Assistance


Assistance ID - 125217
Muscatine City Of Stp - 312508177
1202 MUSSER STREET Muscatine, IA 52761
Muscatine County

FO 6

Report
File Name File Type File Date Note
Comments
8/25/2022 Patti inquired about E. coli sampling and data reporting. I discussed with Terry Jones, ww senior. Her initial email and My response is pasted below : Thu, Aug 18, 3:14 PM to me, Contact, Scott I have a question or need further clarification on a question that Jon & Scott asked about E. coli testing of the final effluent for operational purposes/tuning. I know the procedure for drinking water is that you can test as many informational samples a month, but those samples are all required to be reported as Specials to the Iowa DNR. At the SHL laboratory meetings, we have been told that any result from our NPDES Permit that is tested is required to be placed on the DMR. How many informational E. coli samples are allowed monthly? Are the operation information samples to be reported and qualified? If an operational information E. coli sample exceeds the 126 MPN limit - then what is required? The one sample that put us into noncompliance was from 6/17. That result was greater than 2,000 MPN/100-sample. If we find a result at that level during informational testing, what is the protocol? We can calculate the Geo Mean and put the information in the comments section of the report if that is what is desired. Patti Fuller-Bloechl Chemist - Lab Supervisor Muscatine Water & Resource Recover Lee, Brian <[email protected]> 9:47 AM (5 minutes ago) to Patti, Contact, Scott, Terry Patti, We discussed this and technically every sample collected at the required location to determine compliance with an effluent limit should be reported. However, with determining the operation of the UV unit, if the facility collects a grab or two to ensure the system is operating, that can be reported in the comments section and specifically stated that it was for operational purposes. It is still being reported, but wont necessarily be entered into the database. If one of those grabs is above the limit, it is an indication that the unit may not be in compliance or meet limits and needs to be addressed, repaired, modified, etc. However the required sampling and reporting must still be achieved per the permit otherwise. What we dont want is a bunch of samples collected every month and only the hand-picked ones reported. If you are having issues with the UV unit, or any operation, outline it in the comments section. I hope that helps. This is a topic we can put on an agenda and discuss with the wastewater enforcement coordinator. Thanks, Brian BRIAN LEE