Field Office Compliance - Assistance


Assistance ID - 120822
Des Moines Water Works - 310338211
9966 Maffitt Lake Dr Cumming, IA 50061
Dallas County

FO 5

Report
File Name File Type File Date Note
Comments
10/6/2021 Gastineau, Janet <[email protected]> 10:00 AM (1 minute ago) to Bob If you haven't already heard from Kyle, I referred him to you to talk about the vertical well construction process. They have money available to add source capacity at Saylorville and want to start looking for land other than COE ground because it takes so long to get their approval. I was able to send him information on separation distances. JANET GASTINEAU
10/6/2021 RE: well separation distances External Inbox Danley, Kyle 9:42 AM (18 minutes ago) to me Thank you! KYLE A. DANLEY, P.E. | Chief Operating Officer Des Moines Water Works | WATER YOU CAN TRUST FOR LIFE 2201 George Flagg Parkway | Des Moines, Iowa 50321 | www.dmww.com Phone: (515) 283-8795 | fax: (515) 283-8757 | e-mail: [email protected] www.dmww.com | Follow us on Facebook and Twitter P Please consider the environment before printing this e-mail. From: Gastineau, Janet <[email protected]> Sent: Wednesday, October 6, 2021 9:32 AM To: Danley, Kyle <[email protected]> Subject: well separation distances CAUTION: This email originated from outside of DMWW. Do not click links or open attachments unless you recognize the sender and know the content is safe. The straight up 200 feet is for demonstrating legal control. The other separation distances can be found within the attached chapter of the IAC. Search for Table A. These distances must be maintained for a well not to be considered vulnerable to SOC and VOC contaminants; wells that are vulnerable, remain on 1/3 year monitoring for SOC/VOC. JANET GASTINEAU
"
"