Field Office Compliance - Assistance


Assistance ID - 117547
Clarinda City Of Stp - 310958759
1422 E. LAPEARLA ST. Clarinda, IA 51632
Page County

FO 4

Report
File Name File Type File Date Note
Comments
2/5/2021 Clarinda’s January 2020 DMR cover page included a comment that the CTC [Clarinda Treatment Complex] flow was offline. I called the Clarinda WWTF and spoke to operator Harry Ridnour at 13:16 on 2/5/2021 to get further info. Harry explained that the CTC flowmeter (v-notch weir w/ a depth reader) has not been operational for a couple of months and CTC is not willing to spend any money to repair or replace it. CTC uses their own wells and is not on city water but Clarinda City Manager Gary McClarnon agreed to use 100,000 gallons per day for wastewater billing. The number was based on a percentage of water used based on a year’s data provided to the city by CTC. The Clarinda WWTF has been using the same figure as the flow on their DMR. Per Harry, flows from the CTC ranged 60,000 to 120,000 when the flow meter was working. Harry also mentioned that, as of yesterday (2/4/2021), the academy will be closing in 60 to 90 days. At that point, flows will be considerably reduced as the prison will be the only part of the facility still in use. Harry did not have an estimate for flow from the prison alone. Chris Falk (402/510-8626) is in charge of maintenance at CTC. We also discussed the construction project at the Clarinda WWTF. Harry reported that construction is going well with the SBR tanks approximately ¾ complete and the building shell up. They have also started on plumbing and wiring. DAN OLSON