Field Office Compliance - Assistance


Assistance ID - 116560
Osceola City Of Stp - 310650083
1986 COUNTY CLUB RD. Osceola, IA 50213
Clarke County

FO 5

Report
File Name File Type File Date Note
Comments
12/2/2020 Atkinson, Tom <[email protected]> 1:32 PM (0 minutes ago) to Donnie, [email protected] Donnie, Thanks for reaching out to me to discuss the sequencing of this portion of the treatment plant upgrade. I agree that bringing the cold water back through the treatment process now may be more detrimental to treatment, so pumping the water from EQ cells 1 and 2 into the polishing pond is acceptable. You may begin transferring the water as soon as your schedule allows. Understanding that once the manhole is set and the 24" bypass line is connected, excess influent flow will be directed to the polishing pond while EQ cells 1 & 2 are offline. It is likely that if wet weather occurs, the storage capacity of the polishing pond will be exceeded and an overflow through the old chlorine contact basin will be necessary. If such an incident does occur, it will be handled as a wastewater bypass requiring a verbal report, sample collection, and a written report. Projects should be completed as expeditiously as possible to allow water from the polishing pond to be pumped back to EQ cells 1 or 2 and increase the storage capacity of the system. With the changes in piping and structures associated with the EQ basins, it is understood that flow metering will not be available. During such times when metering is not available, a reasonable estimate should be provided. If you have any questions, please don't hesitate to ask. Regards, TOM ATKINSON