Field Office Compliance - Assistance


Assistance ID - 115261
Nevada City Of Stp - 310641311
457 S 6th Street Nevada, IA 502010530
Story County

FO 5

Report
File Name File Type File Date Note
Comments
10/1/2020 All, The proposal to discharge the 80,000 gallons of water treatment residual wastewater over 4 days (roughly 20,000 gallons/day) with the pollutants identified will not require a Treatment Agreement through the Iowa DNR. You are free to coordinate this discharge at the local level. I would recommend that during at least one of the days of discharge, a composite sample should be collected and analyzed for the pollutants previously sampled and iron, manganese, and chloride. That composite sample could be a series of grab samples collected every 2 hours and composited to create a sample for the day. This would provide documentation of what is ultimately discharged to the sewer. If you have any additional questions, please don't hesitate to contact me. Tom Atkinson | Environmental Specialist Sr. Iowa Department of Natural Resources Field Office #5 502 E. 9th St., Des Moines, IA 50319 P 515-725-0371| C 515-577-9296 On Thu, Oct 1, 2020 at 10:02 AM Roth, Michael <[email protected]> wrote: Tom, As discussed earlier this week, Verbio has requested a one-time discharge of wastewater from their facility to the City of Nevada, IA sanitary sewer system. Waste stream consists of Greensand filter backwash used for removal of iron and manganese from raw water as supplied by the City of Nevada to the Verbio facility. Bleach is used as a pre-oxidant at 65 mg/L concentration ahead of Greensand filter. Raw water characteristics for Nevada are generally as follows: Iron = 3-4 mg/L Manganese ~0.5 mg/L Chloride ~ 46 mg/L Wastewater characteristics are: 80,000 gallons total See attached UHL analytical report for Ammonia-N, TKN, BOD5, cBOD5, and TSS. Iron, manganese, and chloride concentrations are unknown. There are no effluent limits for Iron, manganese, and chloride in the City’s NPDES permit. Wastewater loadings from this proposed discharge appear to be within the capacity of the existing wastewater treatment facility. Discharge to the City sanitary sewer system would be via Verbio’s on-site wastewater lift station. The lift station design capacity is 100 gpm at 150 ft TDH. Current lift station discharge rate is 42 gpm. The Verbio lift station discharges into a receiving manhole east of Airport Road along West K Ave. into an 12-inch diameter sewer. Discharge rate of the 80,000 gallons of filter backwash is planned to occur over a 4-day period with a duration of 8 hours/day. This discharge rate appears to be within the capacity of the sanitary sewer collection system. Please let the City know if IDNR will require a Treatment Agreement to accept this waste stream on a one-time basis or if additional requirements are necessary. Sincerely, Michael Roth, PE TOM ATKINSON