File Name File Type File Date Note
Comments
11/8/2019 On 11/8/2019, I spoke with Jim Bristow by telephone. Mr. Bristow reported that ZFS (aka the bean plant), which has had difficulty meeting pH limits in their ITA, was objecting to Creston WWTF taking their sample back to the Creston WWTF lab to check the pH. They wanted pH to be analyzed on-site. Mr. Bristow explained that the samples are driven directly back to the lab and analyzed within 10 minutes of being collected, that he would not expect the pH to change in 10 minutes, that he would have to purchase second certified pH meter at a cost of several thousand dollars to analyze pH at the ZFS site, that the current plant upgrade was approximately $1 million over budget, and that, in light of the preceding conditions, it would be difficult to justify the cost of the second meter. I suggested that he consider purchasing a less expensive pH meter, similar to the ones used by DNR staff. The less expensive meter could be used to check pH at the time the sample is collected and at the time that the sample is analyzed at the lab. If they find that a significant change occurs between collection and analysis, they may need to purchase a second certified meter and/or determine why pH is shifting so quickly. If they find that no significant change occurs, the current procedure may be adequate. I also asked about the status of the gummy bear plant (aka Ferarra fka Farley Sathers). Mr. Bristow indicated that there was an auction in March but the plant did not sell. It has been gutted and is currently being used by Ferrara as a warehouse. They are still feeding the lagoon and discharging ~ 4,000 gpd but, since they are at or below the strength of domestic waste, they are no longer considered an SIU. The facility may be closed rather than sold. I also asked about the status of the Creston WWTF upgrade. Mr. Bristow indicated that they still need to upgrade 1 clarifier and finish a lot of electrical work. He indicated that the UV has been installed but there are issues with the equipment that still need to be addressed. They have finished their regular sludge removal and Nutri-ject will be coming to remove sludge from the digester so that work can start on it. DAN OLSON