Comments
9/16/2019 Gary called with a compost update. The west drain was cleaned out and storm water is now able to flow through the pipes to the west lagoon. The west 1/2 of compost has been partially dewatered as well. A berm has been created on the SE corner (near silos). East drain is planned to be opened by approximately 9/20. Windrows should be able to be formed in about 2 weeks. A path continues to be maintained around a majority of the pad. He added that about 320 loads of finished compost has been hauled off site since July. BRIAN LEE
"
"