Field Office Compliance - Assistance


Assistance ID - 108303
Creston City Of Stp - 312555218
710 S. LAKESHORE DR. Creston, IA 50801-0449
Union County

FO 4

Report
File Name File Type File Date Note
Comments
8/15/2019 On Thu, Aug 15, 2019 at 3:08 PM <[email protected]> wrote: Thank you for the information. Given the work that is being done, your proposal seems reasonable. Please: 1. Make every possible effort to minimize the potential impact of the bypass. 2. Notify FO4 at the time that the bypass starts. 3. Sample the bypassed effluent for ammonia nitrogen, CBOD, and TSS. 4. Submit a written report of the bypass, using the form at http://www.iowadnr.gov/Portals/idnr/uploads/forms/5420681.pdf, within 5 days of starting the bypass. Daniel P Olson | Environmental Specialist Senior Field Office 4 | 1401 Sunnyside Lane, Atlantic, IA 50022 Iowa Department of Natural Resources Office 712-243-1934| Cell 712-250-0093 | Fax 712-243-6251 www.iowadnr.gov On Thu, Aug 15, 2019 at 10:41 AM Vince Driscoll <[email protected]> wrote: Dan & Ryan, The City of Creston is currently constructing improvements to their existing wastewater treatment facility (WWTF). Part of the project includes improvements to Control Panel 1 in the Recirculation Pump Station between the Intermediate Clarifiers. Currently, all wastewater flows through these existing process items. These improvements cannot be done with the full wastewater stream flowing through the pipe lines they are connected to. Accordingly, a plan to temporarily bypass the this area has been developed. For the bypass, the wastewater flow will be sent through the following processes: Headworks Grit & Screening Removal, Primary Clarification, Trickling Filtration, Intermediate Clarification. The bypass will being after the wastewater exits the Intermediate Clarifiers. This means that the wastewater flow will bypass the following processes: Nitrification Filtration, Final Clarification. The bypass will discharge to the Unnamed Creek to the Platte River. The improvements could be completed in four (4) days. Based on an average daily flow of 2 mgd and an estimated work time of 4 days, the planned bypass could be up to 8 million gallons. The contractor plans to begin this work with Monday August 26, 2019, as an estimated start date. There will be one bypass for this work. The bypass is planned to last four (4) days for all the work described to be completed. After the above listed existing control panel improvements are complete, we will report the actual duration and corresponding approximate flow volume of any bypass that occurred. If you have any questions or could use additional information, please let me know. Thank you, Vincent Driscoll VEENSTRA & KIMM, INC. DAN OLSON