Assistance ID - 107539
Magellan Pipeline Co, Llc - Des Moines - 311467744
2503 SE 43RD ST. Des Moines, IA 50327
Polk County

FO 5

Report
File Name File Type File Date Note
Comments
7/11/2019 On July 11, 2018 I consulted with Tom Atkinson and sent Dave Hruby the following response (also see attached laboratory results from follow up sampling of the coffer dam): Thanks Dave, Glad to see the second sampling results were no-detect. Your email with the attached laboratory results is sufficient. Sincerely, Bill Gibbons BILL GIBBONS
7/11/2019 On Wednesday, July 10, 2019 Tom Atkinson and I received the following email from Dave Hruby: Bill and Tom, We received the results from the West Coffer Dam sample collected on June 28, 2019. The Oil and Grease result was below laboratory detection. As discussed and anticipated, the detection in the initial sample appears to be an anomaly. Also attached is the initial analytical report for your reference. Based on the results from the recollected sampled, further action does not appear to be necessary. Please let us know if you disagree. Also, please let us know if this email correspondence is sufficient or if you need a formal written report. The West Coffer Dam is not the point of compliance for the NPDES permit. Samples are collected from the West Coffer Dam to verify the results of the monthly TROWS sample. The results of the June 2019 TROWS sample did not exceed permit action levels. Per the permit, the West Coffer Dam results were not reportable; however, we wanted IDNR to be aware. If you need additional documentation, please let us know. We appreciate your help on this. Please reach out to Tristan or me with any questions you may have. Thanks! BILL GIBBONS
6/28/2019 On June 28, 2018 Dave Hruby followed up our phone conversation with an email and a copy of the laboratory results (see attached). The email read as follows: Bill, Thank you for speaking with me earlier. As we discussed, we just received the June analytical data from the monthly sampling conducted at the Magellan Des Moines Terminal. As discussed, the Point of Compliance according to the permit (TROWS sample) did not have any detections in June. In addition to the monthly TROWS sample, we collect a water sample from the West Coffer Dam which is what the TROWS eventually discharges into (the last point the water can be sampled before leaving the terminal). We’ve collected from this location for several years for a second set of data in case there is an exceedance in the TROWS sample. In June, there was a 21.2 mg/L Oil and Grease concentration in the West Coffer Dam sample. The detection was surprising considering the TROWS sample did not have any detections. According to the permit, the Coffer Dam is not the point of compliance but we wanted to let IDNR know about the situation. There hasn’t been any activity or incidents that are known to have caused the detection. We plan to collect an additional sample today and have it analyzed by the lab on an expedited TAT. We likely will not receive results until the middle of next week. Once we have results, we can provide a verbal report to you. We discussed sending a written report into IDNR after we receive the second set of data. Depending on when the results are received, the report will likely not be sent until the week of July 8th. Bill, please let us know if you and Tom decide anything differently once you’ve had an opportunity to discuss this early next week. Attached is the analytical report for your reference. Thanks, BILL GIBBONS
6/28/2019 On Friday June 28, 2019 I talked to Dave Hruby with Apex Environmental who was calling on behalf of Magellan Des Moines Terminal in Pleasant Hill, Iowa. Dave called to tell me the most recent sampling of the Train Rack Oil Water Separator in which they also sample the coffer dam which is where effluent from the Oil Water Separator goes into before it leaves the site, came back as 21 ug/L for oil and grease in the Coffer Dam while it was non-detect in the Oil Water Separator. The point of compliance is the oil water separator and the coffer dam has been sampled by Magellan as a back-up sample in case they exceeded the permit limits in the oil water separator. Dave said they plan to re-sample today (June 28th) but would not get results back until late next week or early the following week. He asked if they need to submit a written report within 5 days. I told him since it wasn't the point of compliance they would not have to meet the 5 day limit however we would like to have a written report of the occurrence after they get the results from the second round of sampling. It was agreed the report could be submitted sometime the week of July 8th. Dave said he thought the first sample might be an anomaly since the oil/water separator has not had anything coming into it but storm water (rain water) for quite some time since the train loading rack was not being utilized. I asked him to make mention of this in his report and to also give us some information as to the future of the train loading rack at the facility since water from the rack going into the oil water separator was a point of compliance in their NPDES Permit. BILL GIBBONS