Document Name Type File Date Note
106569_042919_01.pdf
Letter (public)
04/29/2019 Multiple bypass reports
106569_042919_02.pdf
Letter (public)
04/30/2019 multiple bypass reports
File Name File Type File Date Note
Comments
5/2/2019 Dan Miers with Davenport WW reported Davenport is experiencing Major Flood condition. The Davenport WCP treatment plant running at maximum flow and river level is expected to crest at 7:00pm, 5/1/2019 at 22.2 ft. This would be 78 MGD maximum lift station pump capacity, 55 MGD through secondary treatment and about 21 MGD blending flow that has been primary treated. The main gate that lowers (est. 6” open) in front of the lift station at the treatment plant was lowered at 5:35am on 4-29-19. They're are a bunch of on-going bypasses occurring. They are operating the WW plant in ”Flooded Condition” with a 2ea. 12 hr. shift of 4 operators, one chemist 12 hrs. , One maintenance person 12 hrs. And an electrician 12 hrs. The WPC staff will not have road access to leave the treatment plant due to flooded roads in or out of the facility. The roads became impassable on 4-29-19 at 7:30pm. The remaining staff has been re-assigned to the Public Works Department. They are experiencing a sewer collection system that is at capacity due to the lowering of the main gate at the wastewater treatment plant. There have been numerous reports of manhole lids blowing off, some which are under the flooded river areas. The Sewer Department at Public Works will be identifying and prioritizing the Sanitary Sewer Report information. They requested if they listed all SSO”S as they are discovered and report the list in one Sanitary Sewer Overflow Report by sometime on Friday and could then update the IDNR on the overflow conditions and treatment plant operations as it relates to flood river levels and rainfall. Given the number bypasses being discovered/ongoing as a result of flooding and continued rain events, we agreed to temporarily forgo 24 hour bypass reporting requirement until current rain/flood events subside with the understanding the city provides periodic updates (Friday 5-3-19) being the first update. If the situation normalized by Friday (although forecast doesn't look favorable), we could discuss reporting issues moving forward. If the situation remains dire, we'll continue with updates until a later date. We did ask that if anything significant happens that poses an elevated risk to human health and/or the environment, the city notify us within the normal reporting time frame. TERRY JONES