Field Office Compliance - Assistance


Assistance ID - 103543
Eagle Grove, City Of Stp - 310641839
1342 SW 9TH STREET Eagle Grove, IA 50533-0165
Wright County

FO 2

Report
File Name File Type File Date Note
Comments
10/24/2018 Email pasted below sent to Curt after he called that afternoon to discuss discharging the new aeration basin contents (final clarifier wastewater) to the drainage ditch. "Curt- This email will summarize our conversation from this afternoon about discharging the final clarifier wastewater from the new aeration basin after the "wet" test to ensure it does not leak. This morning we discussed pumping final clarifier wastewater to the newly constructed aeration basin to conduct the "wet" test. It is my understanding that the contractor is pumping from the final clarifier to the aeration basin now. You stated that the contractor will not transfer any sludge from the clarifier to the aeration basin. Due to the truck traffic they would like to discharge directly to the drainage ditch once they complete this test. We discussed other alternatives but they did not seem to be practical based on your assessment. Therefore you may discharge the aeration basin contents (final clarifier wastewater) to the drainage ditch. Follow your prescribed effluent monitoring in the NPDES permit for this discharge. However you may collect grabs rather than 24 hour composite samples. Do your best to keep track of flow based on your trash pump. The data collected can be entered in the MOR comment box or in the body of the email with a note about this activity. Let me know if you have any questions or would like to discuss further. " CARL BERG
10/24/2018 Curt called to inform FO that the new aeration basin is ready for its "wet" test. Previously they have used final effluent but with the truck traffic back and forth it will not work to pump due to the trucks running over the hoses. Therefore he would like to pump from the final clarifiers and bleed it back into the system when they are finished. I asked if they would have enough volume and Curt did not think so but he stated he would let the engineers figure that out. I agreed and requested that Curt make a note on his MOR what they are doing. CARL BERG