The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual. Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms, Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.
Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis.
To subscribe to this list, click here.
The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.
To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website.
You may obtain a free download from
Click on the project names below to view the one(s) which interest you.
This project consists of the demolition of the existing shower building, removal of trees, installation of a new shower building, sidewalks, two paved parking stalls at the east end of the Springbrook State Park campground near the bridge leading to the youth area.
Project consists of the construction of Phase 1 of the project including clearing and grubbing, berm construction, seeding & mulching, and incidental items on the west 3,900 feet of the project site as required by the project documents and the IDNR construction inspector.
ESTIMATED QUANTITIES:
Mobilization
1 L.S.
Clearing & Grubbing
14 Acres
Class 10 Excavation, Waste (2 ft Topsoil Core Trench
37,128 C.Y.
Berm Construction, Class 10 Excavation (Borrow Area)
Lake of Three Fires State Park office is located near the main entrance to the park in Bedford, IA. This project will consist of 3 heated garage/storage bays, one open office (2 staff), one conference room, one restroom, and a mechanical and storage room. It will also have an equipment yard in the rear of the building.
ESTIMATED QUANTITIES:
CLEARING AND GRUBBING
1 L.S.
ON-SITE TOPSOIL (STRIP, SALVAGE & RESPREAD)
550 C.Y.
EXCAVATION CLASS 10
1,010 C.Y.
MODIFIED SUBBASE
102 Tons
SANITARY SERVICE
1 Each
12" RCP STORM SEWER
148 L.F.
12" RCP APRON
1 Each
3" WATER MAIN
275 L.F.
3" 11.25 MF BEND
1 Each
3" 22.5 MJ BEND
3 Each
3" 45 MJ BEND
4 Each
3" MJ TEE
1 Each
WATER SERVICE (CORP VALVE, SERVICE PIPE, STOP, STOP BOX)
1 Each
WATER STOP AND BOX
1 Each
CIRCULAR STORM SEWER MANHOLE SW-401
1 Each
CIRCULAR AREA INTAKE SW-512
1 Each
6" PCC PAVEMENT
485.6 S.Y.
4" PCC SIDEWALK
27.8 S.Y.
DETECTABLE WARNINGS
10 S.Y.
GRANULAR SURFACING (CLASS "A" CRUSHED STONE)
210 Tons
CONVENTIONAL SEEDING (URBAN SEEDING)
0.3 Acres
12" FILTER SOCK
130 L.F.
SILT FENCE
40 L.F.
CHAIN LINK FENCE
326 L.F.
CHAIN LINK FENCE GATE
1 Each
ELECTRIC SERVICE
1 Each
CONSTRUCTION STAKING
1 Each
45'-0" X 80'-0" SIPS BUILDING WITH ALL COMPONENTS (ARCHITECTURAL, MECHANICAL, ELECTRICAL)
THIS PROJECT CONSISTS OF THE DEMOLITION OF THE EXISTING SHOWER BUILDING ALONG WITH THE REMOVAL OF 3 ADJACENT TREES, THE INSTALLATION OF A NEW CXT CHEYENNE SHOWER BUILDING, RECONNECTING ALL SERVICES TO THE NEW PROPOSED BUILDING, CONSTRUCTING 2 NEW PAVED PCC PARKING SPACES FOR THE BUILDING WITH PCC PAVING CONNECTION TO THE EXISTING LOOP ROAD, CONSTRUCTING A NEW CAMP HOST SITE LOCATION IN THE CAMPGROUND WHICH WILL INCLUDE A NEW SANITARY SEWER SERVICE AND NEW WATER SERVICE, AND THE PCC PAVING OF THE CAMP PAD.
Removal and replacement of existing rock rip rap with grouted class 'E' rip rap and the construction of a new CMP outlet structure and incidental items as required by the contract douments and the DNR Inspector.
This project includes the directional boring of a 6" HDPE water pipe for approximately 300 feet under the spillway channel at Big Creek State Park. The existing water pipe lays on the lake/spillway floor. The new pipe will be connected to 6" PVC water mains on each end with appropriate fittings.
This project consists of site preperation and placing approximatlely 100 TN of class D rip rap, along with flowable grout armoring, along an existing boat ramp.