PROJECTS LETTING -  December , 2017

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

ADAMS 18-04-02-01 Lake Icaria Park - Shoreline Armoring-2017-12-21   Bid Completion detail
APPANOOSE 18-05-04-01 Honey Creek State Park - Restroom Building Replacement-2017-12-21   Bid Completion detail
STORY 16-02-85-04 Hickory Grove Lake - Phase 1 Shoreline Armoring Rebid-2017-12-21   Bid Completion detail
BLACK HAWK 17-03-07-04 George Wyth State Park - Revetment Repair-2017-12-28   Bid Completion detail
EMMET 18-01-32-03 4 Mile Lake - Wetland Channel Excavation-2017-12-28   Bid Completion detail
APPANOOSE 18-05-04-06 Rathbun Fisheries Management Unit - Boiler Room Roof Replacement-2018-01-18   Bid Completion detail
BREMER 18-03-09-02 Sweet Marsh WMA - Railroad Dike Repair-2018-01-18   Bid Completion detail
BREMER 18-03-09-03 Sweet Marsh WMA - Meyer Pond Dike Repair-2018-01-18   Bid Completion detail
DICKINSON 18-01-30-03 Gull Point Law Enforcement - Storage Building Renovation-2018-01-18   Bid Completion detail




ADAMS -- PROJECT # 18-04-02-01                12/21/2017                Large Project Letting
LAKE ICARIA PARK
SHORELINE ARMORING
Proposal Guarantee: $7,500
Completion Date: 5/20/2018

   This project consist of 1,200 Linear Feet of New Class 'E' Shoreline Armoring and 1,300 Linear Feet repairing of existing Shoreline Armoring and any incidental work as required by the D.N.R Field Engineer in Adams, Co. IA

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Class E Revetment     2,500 Tons
    Seeding,Fertilizing and Much     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 18-05-04-01                12/21/2017                Large Project Letting
HONEY CREEK STATE PARK
RESTROOM BUILDING REPLACEMENT
Proposal Guarantee: $16,000
Completion Date: 6/29/2018

   This project consists of the demolition of four (4) existing restroom buildings in the park and installing one (1) new restroom building in a similar location. The restroom building is a pre-cast concrete building, six (6) hole flush restroom. This includes installing ADA sidewalks and parking for access to the new buildings, all earthwork, supplying and installing the new structures and incidental work as required by the project documents and the DNR Inspector.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    GRADING     1 L.S.
    SEEDING, FERTILIZING AND MULCHING     1 L.S.
    4" SCHEDULE 40 PVC SANITARY SEWER AND CLEANOUTS     1 L.S.
    6" REINFORCEMENT PCC SIDEWALK & GRANULAR BASE     2,500 S.F.
    WATER SERVICE     1 L.S.
    ELECTRICAL SERVICE     1 L.S.
    NEENAH CAST IRON DETECTION PANELS     1 L.S.
    IOWA STANDARD PRECAST 6-HOLE CONCRETE RESTROOM     1 Each
    6" REINFORCED PCC PARKING AREA     650 S.F.
    ADA SIGNAGE & PAINT STRIPPING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




STORY -- PROJECT # 16-02-85-04                12/21/2017                Large Project Letting
HICKORY GROVE LAKE
PHASE 1 SHORELINE ARMORING REBID
Proposal Guarantee: $7,000
Completion Date: 9/30/2018

   The project consist of constructing a series of Revetment Rock silt dikes ,746 linear feet of bank stabilization (armoring) 720 linear feet of Trail and Drainage Tile repairs at Hickory Grove Park, Story Co. IA

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Class E Revetment     1,300 Tons
    Macadam Stone     160 Tons
    Engineering Fabric     2,311 S.Y.
    Class A Crushed Stone     163 Tons
    3/8" Minus Granular Surfacing     127 Tons
    Dike Repair     1 L.S.
    Intake Structure Complete      2 Each
    12" Dual Wall PE Tubing     80 L.F.
    6" Corr. Non Perf Tubing     200 L.F.
    36" Dia CMP Ga     12 L.F.
    Seeding, Fertilizing & Mulch     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 18-05-04-06                1/18/2018                Large Project Letting
RATHBUN FISHERIES MANAGEMENT UNIT
BOILER ROOM ROOF REPLACEMENT
Proposal Guarantee: $2,500
Completion Date: 6/29/2018

   Rathbun Fish Hatchery's boiler room has a ballasted EPDM roof which needs to be replaced. The membrane is stretched and has many different leaks. The contractor shall remove all ballast on the roof, then remove the entire EPDM membrane and all associated items. Existing rigid insulation to remain. Clean entire roof, add new 1/4" dens deck prime and, if needed, new wood substrate. Contractor to install new PVC membrane roof following all manufacturer's instructions for install and create new drainage flow as shown on plans. Contractor to install new pipe, vent and curb flashing, boots and drainage items. Contractor to install new curb and scupper flashing and two new head box downspouts. Contractor must demonstrate a minimum of ten (10) previous projects installing fully-adhered PVC, TPO or EPDM membrane projects similar to the scope of this project.

ESTIMATED QUANTITIES:
    DEMOLITION - COMPLETE DEMO OF ROOF     1 L.S.
    NEW FULLY ADHERED PVC ROOFING AND ALL ASSOCIATED ITEMS     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BLACK HAWK -- PROJECT # 17-03-07-04                12/28/2017                Small Project Letting
GEORGE WYTH STATE PARK
REVETMENT REPAIR
Proposal Guarantee: $0
Completion Date: 3/31/2018

   The project consists of furnishing and placing revetment, Class D riprap, (300Ton) along river shoreline at G Wyth State Park, Blackhawk County Iowa. Completion date March 31,2018. Proposal may be obtained by emailing name, address, and pho ne number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




EMMET -- PROJECT # 18-01-32-03                12/28/2017                Small Project Letting
4 MILE LAKE
WETLAND CHANNEL EXCAVATION
Proposal Guarantee: $0
Completion Date: 3/23/2018

   This project is designed to widen and deepen an existing boat channel through the wetland marsh on the west side of 4 Mile Lake in Emmet County, Iowa. Work under this project includes excavation of a 10’ bottom channel with 2:1 side slopes for a distance of 700’. The material will be removed from the marsh and spoiled in an adjacent crop field.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




BREMER -- PROJECT # 18-03-09-02                1/18/2018                Small Project Letting
SWEET MARSH WMA
RAILROAD DIKE REPAIR
Proposal Guarantee: $0
Completion Date: 5/31/2018

   The project consists of removal & disposal of trees and brush from the dike mainly on the eat end, scarification and reshaping existing dike (approx. 2900 LF) by placing material from along side of the dike or from an off site borrow resulting with a 10' top and 3:1 side slope dike, and seeding a stabilizing crop on the disturbed areas near Tripoli, Iowa, Sweet Marsh WMA, Bremer County. Proposal may be obtained by emailing name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




BREMER -- PROJECT # 18-03-09-03                1/18/2018                Small Project Letting
SWEET MARSH WMA
MEYER POND DIKE REPAIR
Proposal Guarantee: $0
Completion Date:

   Project consists of scarification and reshaping of existing dike (approx. 500 LF) by placing material from borrow resulting with a dike with 10 foot top and 6:1 side slopes on Sweet Marsh WMA, Bremer county near Tripoli, Iowa. Proposal may be obtained by e-mailing name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




DICKINSON -- PROJECT # 18-01-30-03                1/18/2018                Small Project Letting
GULL POINT LAW ENFORCEMENT
STORAGE BUILDING RENOVATION
Proposal Guarantee: $0
Completion Date: 6/1/2018

   The intent of this project is to renovate the exterior of an existing storage facility located at the Gull Point State Park Law Enforcement Complex in Dickinson County, IA. Work will involve the demolition and removal of all the existing roofing siding, sheeting, windows and doors followed by the installation of new materials per specification. Also included is some miscellaneous electrical/lighting work and the construction of a wood loading dock.

Contact:
Jeff Felts
515-250-3712