PROJECTS LETTING -  December , 2012

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

APPANOOSE 12-05-04-06 Honey Creek Resort - Activity Building Repairs-2012-12-20   Bid Completion detail
GUTHRIE 13-04-39-04 Springbrook/Beeds Lake - Shower Building-2012-12-24   Bid Completion detail
JOHNSON 12-06-52-06 Hawkeye Wildlife Management Area Phase 1 - Water Quality & Wetland Project-2012-12-24   Bid Completion detail
TAYLOR 13-04-87-01 Lake of Three Fires State Park - Shop/Office building -2012-12-24   Bid Completion detail
TAYLOR 13-04-87-03 Lake of Three Fires State Park - Shower building replacement-2012-12-24   Bid Completion detail
POLK 13-02-77-06 Big Creek State Park - Waterline Replacement at Spillway Channel-2012-12-27   Bid Completion detail
ADAMS 12-04-02-01 Zimmerman Pool at lake Icaria - Fix dam of wetland-2013-01-17   Bid Completion detail
DES MOINES 09-06-29-01 geode state park - replace culvert under road-2013-01-17   Bid Completion detail
JOHNSON 09-06-52-9 Sutliff Boat Ramp - Repair undermining-2013-01-17   Bid Completion detail
JONES 12-06-53-04 Muskrat Slough - Dike Design and Construction-2013-01-17   Bid Completion detail




GUTHRIE -- PROJECT # 13-04-39-04                12/24/2012                Large Project Letting
SPRINGBROOK/BEEDS LAKE
SHOWER BUILDING
Proposal Guarantee: $10,000
Completion Date: 5/1/2013

   This project consists of the demolition of the existing shower building, removal of trees, installation of a new shower building, sidewalks, two paved parking stalls at the east end of the Springbrook State Park campground near the bridge leading to the youth area.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    CLEARING AND GRUBBING     1 L.S.
    SITE WORK AND UTILITY CONNECTIONS     1 L.S.
    CXT CHEYENNE PRECAST CONCRETE SHOWER BUILDING     1 Each
    CLASS "A" CRUSHED STONE     153 Tons
    SIDEWALK, PCC, 6"     147.4 S.Y.
    PARKING LOT, PCC, 6"     62.2 S.Y.
    SIGNING     1 Each
    DRAIN-DOWN PIT     1 L.S.
    PRECAST CONCRETE PARKING WHEEL STOPS     2 Each
    EROSION CONTROL     245 L.F.
    CONSTRUCTION STAKING     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JOHNSON -- PROJECT # 12-06-52-06                12/24/2012                Large Project Letting
HAWKEYE WILDLIFE MANAGEMENT AREA PHASE 1
WATER QUALITY & WETLAND PROJECT
Proposal Guarantee: $15,000
Completion Date: 10/15/2013

   Project consists of the construction of Phase 1 of the project including clearing and grubbing, berm construction, seeding & mulching, and incidental items on the west 3,900 feet of the project site as required by the project documents and the IDNR construction inspector.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clearing & Grubbing     14 Acres
    Class 10 Excavation, Waste (2 ft Topsoil Core Trench     37,128 C.Y.
    Berm Construction, Class 10 Excavation (Borrow Area)     76,991 C.Y.
    Seeding & Mulching Berm     10 Acres
    Silt Fencing     4,620 L.F.
    Storm Water Pollution Prevention Plan (SWPPP)     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




TAYLOR -- PROJECT # 13-04-87-01                12/24/2012                Large Project Letting
LAKE OF THREE FIRES STATE PARK
SHOP/OFFICE BUILDING
Proposal Guarantee: $20,000
Completion Date: 10/31/2013

   Lake of Three Fires State Park office is located near the main entrance to the park in Bedford, IA. This project will consist of 3 heated garage/storage bays, one open office (2 staff), one conference room, one restroom, and a mechanical and storage room. It will also have an equipment yard in the rear of the building.

ESTIMATED QUANTITIES:
    CLEARING AND GRUBBING     1 L.S.
    ON-SITE TOPSOIL (STRIP, SALVAGE & RESPREAD)     550 C.Y.
    EXCAVATION CLASS 10     1,010 C.Y.
    MODIFIED SUBBASE     102 Tons
    SANITARY SERVICE     1 Each
    12" RCP STORM SEWER     148 L.F.
    12" RCP APRON     1 Each
    3" WATER MAIN     275 L.F.
    3" 11.25 MF BEND     1 Each
    3" 22.5 MJ BEND     3 Each
    3" 45 MJ BEND     4 Each
    3" MJ TEE     1 Each
    WATER SERVICE (CORP VALVE, SERVICE PIPE, STOP, STOP BOX)     1 Each
    WATER STOP AND BOX     1 Each
    CIRCULAR STORM SEWER MANHOLE SW-401     1 Each
    CIRCULAR AREA INTAKE SW-512     1 Each
    6" PCC PAVEMENT     485.6 S.Y.
    4" PCC SIDEWALK     27.8 S.Y.
    DETECTABLE WARNINGS     10 S.Y.
    GRANULAR SURFACING (CLASS "A" CRUSHED STONE)     210 Tons
    CONVENTIONAL SEEDING (URBAN SEEDING)     0.3 Acres
    12" FILTER SOCK     130 L.F.
    SILT FENCE     40 L.F.
    CHAIN LINK FENCE     326 L.F.
    CHAIN LINK FENCE GATE     1 Each
    ELECTRIC SERVICE     1 Each
    CONSTRUCTION STAKING     1 Each
    45'-0" X 80'-0" SIPS BUILDING WITH ALL COMPONENTS (ARCHITECTURAL, MECHANICAL, ELECTRICAL)     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




TAYLOR -- PROJECT # 13-04-87-03                12/24/2012                Large Project Letting
LAKE OF THREE FIRES STATE PARK
SHOWER BUILDING REPLACEMENT
Proposal Guarantee: $10,000
Completion Date: 5/1/2013

   THIS PROJECT CONSISTS OF THE DEMOLITION OF THE EXISTING SHOWER BUILDING ALONG WITH THE REMOVAL OF 3 ADJACENT TREES, THE INSTALLATION OF A NEW CXT CHEYENNE SHOWER BUILDING, RECONNECTING ALL SERVICES TO THE NEW PROPOSED BUILDING, CONSTRUCTING 2 NEW PAVED PCC PARKING SPACES FOR THE BUILDING WITH PCC PAVING CONNECTION TO THE EXISTING LOOP ROAD, CONSTRUCTING A NEW CAMP HOST SITE LOCATION IN THE CAMPGROUND WHICH WILL INCLUDE A NEW SANITARY SEWER SERVICE AND NEW WATER SERVICE, AND THE PCC PAVING OF THE CAMP PAD.

ESTIMATED QUANTITIES:
    Demolition     1 L.S.
    Grading and seeding/mulching     1 L.S.
    Silt Fence or filter sock     70 L.F.
    6" PCC Pavement     226 S.Y.
    CXT Cheyenne shower building     1 Each
    Service connections to new building     1 L.S.
    5-foot wide 5-inch depth PCC sidewalk     51.1 S.Y.
    Existing water valve height adjustment     1 Each
    Precast concrete parking wheel stops     2 Each
    Parking lot striping and handicap signage     1 L.S.
    Drain Down Pit     1 Each
    Sanitary sewer service with manhole connection     209 L.F.
    Sanitary sewer service clean-out     2 Each
    RV service riser     1 Each
    1-inch PE water service pipe with tap     126 L.F.
    Yard hydrant     1 Each
    Class ‘A’ crushed stone     136.5 Tons
    Construction staking for entire project     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




ADAMS -- PROJECT # 12-04-02-01                1/17/2013                Large Project Letting
ZIMMERMAN POOL AT LAKE ICARIA
FIX DAM OF WETLAND
Proposal Guarantee: $15,000
Completion Date: 6/1/2013

   Removal and replacement of existing rock rip rap with grouted class 'E' rip rap and the construction of a new CMP outlet structure and incidental items as required by the contract douments and the DNR Inspector.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Earthfill     411 C.Y.
    Excavation     411 C.Y.
    Rip Rap, Grizzled Class E     3,441 Tons
    Rip Rap Concrete Grout     695 C.Y.
    Geotextile Fabric     3,410 S.Y.
    42" Stoplog Riser     1 L.S.
    30" Diameter CMP Pipe     80 L.F.
    Seeding     1 L.S.
    Site Dewatering     1 L.S.
    Rip Rap Removal     1 L.S.
    Regrade Rip Rap Base     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 12-05-04-06                12/20/2012                Small Project Letting
HONEY CREEK RESORT
ACTIVITY BUILDING REPAIRS
Proposal Guarantee:
Completion Date: 1/31/2013

   Iowa DNR needs to modify the existing Activities Center. One of the two solar panel inverters is currently inoperable and needs replacement (DNR shall provide replacement inverter). Contractor shall install new inverter and hook all sensoring equipment into inverter and send old inverter back to Schneider Electric. The contractor shall also provide and install two check valves and two mixing valves as indicated on contract documents.

Contact:
Jason Kruse

[email protected]




POLK -- PROJECT # 13-02-77-06                12/27/2012                Small Project Letting
BIG CREEK STATE PARK
WATERLINE REPLACEMENT AT SPILLWAY CHANNEL
Proposal Guarantee: $0
Completion Date: 1/18/2013

   This project includes the directional boring of a 6" HDPE water pipe for approximately 300 feet under the spillway channel at Big Creek State Park. The existing water pipe lays on the lake/spillway floor. The new pipe will be connected to 6" PVC water mains on each end with appropriate fittings.

Contact:
Don Labate
515-250-3714
[email protected]




DES MOINES -- PROJECT # 09-06-29-01                1/17/2013                Small Project Letting
GEODE STATE PARK
REPLACE CULVERT UNDER ROAD
Proposal Guarantee: $0
Completion Date: 3/15/2013

   This project consists of removing and replacing 160 LF of 24" CMP underneath an existing roadway; roadway to be removed.

Contact:
Heath Delzell

[email protected]




JOHNSON -- PROJECT # 09-06-52-9                1/17/2013                Small Project Letting
SUTLIFF BOAT RAMP
REPAIR UNDERMINING
Proposal Guarantee: $0
Completion Date: 5/15/2013

   This project consists of site preperation and placing approximatlely 100 TN of class D rip rap, along with flowable grout armoring, along an existing boat ramp.

Contact:
Bruce Flippin

[email protected]




JONES -- PROJECT # 12-06-53-04                1/17/2013                Small Project Letting
MUSKRAT SLOUGH
DIKE DESIGN AND CONSTRUCTION
Proposal Guarantee: $0
Completion Date: 5/31/2013

   Construction of an approximately 550 CY impoundment, including the installation of a water control structure.

Contact:
Bruce Flippin

[email protected]