PROJECTS LETTING -  December , 2020

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

JONES 20-06-53-01 Wapsipinicon State Park - 2019 FEMA Flood Repairs - Phase 1-2020-12-17   Bid Completion detail
MUSCATINE 21-06-70-01 Fairport State Recreation Area - 2019 FEMA Revetment Repairs-2020-12-17   Bid Completion detail




JONES -- PROJECT # 20-06-53-01                12/17/2020                Small Project Letting
WAPSIPINICON STATE PARK
2019 FEMA FLOOD REPAIRS - PHASE 1
Proposal Guarantee:
Completion Date: 3/26/2021

   Project includes a 300 LF repair of Wapsipinicon River bank damaged by 2019 floods. Contractor shall provide and place 640 CY of embankment fill and 756 tons of Class E revetment on 800 SY of engineering fabric to repair washout of bank.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




MUSCATINE -- PROJECT # 21-06-70-01                12/17/2020                Small Project Letting
FAIRPORT STATE RECREATION AREA
2019 FEMA REVETMENT REPAIRS
Proposal Guarantee:
Completion Date: 3/26/2021

   Project includes placing 347 Tons of Class E Revetment and 17 Tons of Erosion Stone to repair Mississippi River bank damaged by the 2019 floods.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov