PROJECTS LETTING -  December , 2011

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

CERRO GORDO 10-03-17-09 Clear Lake State Park - Campground Improvements & Sanitary Sewer Rehabilitation-2011-12-15   Bid Completion detail
FRANKLIN 10-03-35-02 Beeds Lake - Sanitary Sewer Rehabilitation-2011-12-15   Bid Completion detail
JACKSON 09-03-49-02 Maquoketa Caves State Park - water well for visitor's center-2011-12-15   Bid Completion detail
PALO ALTO 11-01-74-03 Virgin Lake - new outlet structure+channels (rebid)-2011-12-15   Bid Completion detail
JONES 12-06-53-01 Wapsipinicon - Ranger's Residence Roof Replacement-2011-12-29   Bid Completion detail
APPANOOSE 11-05-04-16 Honey Creek Resort - Wedge Dock-2012-01-05   Bid Completion detail
APPANOOSE 12-05-04-02 Honey Creek Resort - Kiosk Installation-2012-01-05   Bid Completion detail
APPANOOSE 11-05-04-24 Honey Creek Resort - DesJardins Renewable Energy Project - Millwork Kiosk-2012-01-05   Bid Completion detail
DICKINSON 12-01-30-03 Big Spirit Lake - Hales Slough Fish Trap Rehabilitation-2012-01-05   Bid Completion detail
MAHASKA 10-05-62-04 Lake Keomah State Park - Sewer Rehab-2012-01-05   Bid Completion detail
VAN BUREN 10-06-89-08 Lacey Keosauqua State Park - Sewer Rehab-2012-01-05   Bid Completion detail
WOODBURY 12-01-97-01 Snyder Bend WMA - Water Supply Channel Excavation-2012-01-05   Bid Completion detail
HARRISON 12-04-43-01 Loess Hills State Forest - Completion of Building Moving -2012-01-12   Bid Completion detail




CERRO GORDO -- PROJECT # 10-03-17-09                12/15/2011                Large Project Letting
CLEAR LAKE STATE PARK
CAMPGROUND IMPROVEMENTS & SANITARY SEWER REHABILITATION
Proposal Guarantee: $5,000
Completion Date: 4/30/2012

   This project consists of upgrading 8 of the existing camp sites (No. 95 - 101 + Host site) to full hookup sites, building two new dump stations & rehabilitating the existing wastewater collection system. The sewer line will be rehabilitated by in-situ lining of the pipe, the leaking manholes will be repaired by grouting, readjusting the frames or in some cases replacing the manholes.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Remove Existing Dump Station     1 Each
    Remove Existing Electric Posts     5 Each
    Remove Existing Yard Hydrants     1 Each
    Remove Tree     1 Each
    Clear & Grub     1 L.S.
    Sanitary Sewer Point Repairs     2 Each
    6" Sanitary Sewer Lining     906 L.F.
    Seal Lined Pipe Ends     6 Each
    Lined Service Lateral Reconnections     1 Each
    Air Test Service Lateral Connection     1 Each
    Chemical Grout Service Laterals     1 Each
    Replace Manhole Cover & Frame     1 Each
    Reconstruct Manhole Chimney     3 Each
    Construct Sanitary Dump Station     2 Each
    Sanitary Service Lines (4")     230 L.F.
    RV Sanitary Sewer Connection     8 Each
    Water Main (2")     415 L.F.
    Water Service Connections     11 Each
    Water Service Line     150 L.F.
    Service Hydrants (Yard Hydrants)     9 Each
    Campsite Electrical Modifications     1 L.S.
    Granular Surfacing & Base     50 C.Y.
    HMA Pavement     165 S.Y.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




FRANKLIN -- PROJECT # 10-03-35-02                12/15/2011                Large Project Letting
BEEDS LAKE
SANITARY SEWER REHABILITATION
Proposal Guarantee: $5,000
Completion Date: 4/30/2012

   This project consists of rehabilitating the existing wastewater collection system at Beeds Lake State Park. The scope of the project includes in-situ lining of the sewer collection pipe, digging and point repairing the pipe at several places where pipe has collapsed and cannot be lined and rehabilitation of the manholes by either grouting, readjusting the frames or in some cases replacing the manholes.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    6" Sanitary Sewer Lining     332 L.F.
    8" Sanitary Sewer Lining     3,127 L.F.
    Seal Lined Pipe Ends     24 Each
    Lined Service Lateral Reconnections     1 Each
    Air Test Service Lateral Connection     1 Each
    Chemical Grout Service Laterals     1 Each
    Replace Manhole Cover/Frame     11 Each
    Reconstruct Manhole Chimney     5 Each
    Pressure Grout Pipes/Dog Houses     2 Each
    Pressure Grout Precast Manhole Joints     1 Each
    Rebuild Manhole Bench     9 Each
    Manhole Lining     3 Each
    Remove/Reconstruct Manhole     1 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JONES -- PROJECT # 12-06-53-01                12/29/2011                Large Project Letting
WAPSIPINICON
RANGER'S RESIDENCE ROOF REPLACEMENT
Proposal Guarantee:
Completion Date: 1/13/2012

   Remove & dispose of existing roofing system, repair damaged sheathing, and place new asphalt shingles

ESTIMATED QUANTITIES:
    Repair Roof     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MAHASKA -- PROJECT # 10-05-62-04                1/5/2012                Large Project Letting
LAKE KEOMAH STATE PARK
SEWER REHAB
Proposal Guarantee: $5,000
Completion Date: 4/30/2012

   This project consists of rehabiliation of 6" and 8" gravity sewer mains, existing lift station improvements, a new sanitary sewer lift station, 840 LF of new forcemain, and other appurtenances. The sewer line will be rehabilitated by cast in place lining of the pipe (CIPP) and chemical grouting of pipe joints. The manholes will be repaired by grouting, installation of new castings, centrigually cast cementitious mortar lining (CCCM), or total replacement.

ESTIMATED QUANTITIES:
    CIPP Line Sewer Pipe, 6" Dia.     1,925 L.F.
    CIPP Line Sewer Pipe, 8" Dia.     330 L.F.
    Chemical Grout Sewer, VCP Pipe Joints, 8" Dia.     1,200 L.F.
    Post-Improvement Televising     3,455 L.F.
    Interior Manhole Chimney Seals     1 Each
    Manhole CCCM Interior Lining with Epoxy Seal     73 L.F.
    New Casting for CCCM Lined Manholes     12 Each
    Manhole Grout/Repair of Inlet/Outlet Piping     4 Each
    New Precast 4' Dia. Manhole     1 Each
    New Lift Station Rehabilitation - South System     1 L.S.
    New Packaged Lift Station - North System     1 L.S.
    Reconnect Existing Sewer/Abandon Existing Manhole     1 L.S.
    2" HDPE Force Main     820 L.F.

notice to bidders

Drawings and Specs are not available in electronic format for this project

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




VAN BUREN -- PROJECT # 10-06-89-08                1/5/2012                Large Project Letting
LACEY KEOSAUQUA STATE PARK
SEWER REHAB
Proposal Guarantee: $5,000
Completion Date: 4/30/2012

   This project consists of rehabilitating the existing wastewater collection system at Lacey-Keosauqua State Park. The scope of the project includes in-site lining of the sewer collection pipe, digging and point repairing the pipe at several places where pipe has collapsed and cannot be lined and rehabilitation of the manholes by either grouting, readjusting the frames or in some cases replacing the manholes.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clean Manhole     6 Each
    Line Manhole     5 Each
    Install/Modify/Flume/Channel     5 Each
    Remove/Replace Steps     1 Each
    Remove & Replace Manhole     3 Each
    Relocate Electric Lines     1 Each
    Point Repair     5 Each
    Sanitary Sewer Pipe Lining     1,049 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JACKSON -- PROJECT # 09-03-49-02                12/15/2011                Small Project Letting
MAQUOKETA CAVES STATE PARK
WATER WELL FOR VISITOR'S CENTER
Proposal Guarantee: $0
Completion Date: 4/30/2012

   This project consists of placing 4900 LF of 3" type 160 pvc, 3 flushing hydrants, 3 yard hydrants, and all other things detailed in the drawings and specifications, or as specified by the DNR construction inspector.

Contact:





APPANOOSE -- PROJECT # 11-05-04-16                1/5/2012                Small Project Letting
HONEY CREEK RESORT
WEDGE DOCK
Proposal Guarantee: $0
Completion Date: 4/15/2012

   This project consists of the construction and installation of a wedge dock for the boat ramp at Honey Creek Resort State Park.

Contact:
Jason Kruse
(515) 250-3707
[email protected]




APPANOOSE -- PROJECT # 12-05-04-02                1/5/2012                Small Project Letting
HONEY CREEK RESORT
KIOSK INSTALLATION
Proposal Guarantee:
Completion Date: 4/30/2012

   This project consists of construction of a kiosk, concrete sidewalks, and stone veneer on the Activity Center at Honey Creek Resort State Park.

Contact:
Jason Kruse
(515) 250-3707
[email protected]




APPANOOSE -- PROJECT # 11-05-04-24                1/5/2012                Small Project Letting
HONEY CREEK RESORT - DESJARDINS RENEWABLE ENERGY PROJECT
MILLWORK KIOSK
Proposal Guarantee:
Completion Date: 3/31/2012

   This new wood kiosk will house the touch-screen system from Siemens building controls. This will be the face of the Desjardins Renewable Project. Millwork kiosk to match the mill and wood work of the lodge. To be placed in the hallway/corridor along the conference rooms.

Contact:
Jason Kruse
(515) 250-3707
[email protected]




DICKINSON -- PROJECT # 12-01-30-03                1/5/2012                Small Project Letting
BIG SPIRIT LAKE
HALES SLOUGH FISH TRAP REHABILITATION
Proposal Guarantee: $0
Completion Date: 3/16/2012

   This project is designed to recondition and improve the existing fish trap structure where Hales Slough meets Big Spirit Lake. Work under this contract involves repair of existing deteriorated concrete structural components, fabrication of new aluminum fish grates, and removal and replacement of a chain-link perimeter fence.

Contact:
Jeff Felts
515-250-3712
[email protected]




WOODBURY -- PROJECT # 12-01-97-01                1/5/2012                Small Project Letting
SNYDER BEND WMA
WATER SUPPLY CHANNEL EXCAVATION
Proposal Guarantee: $0
Completion Date: 3/2/2012

   This project is designed to re-create a water supply channel through the Snyder Bend WMA. The existing wetland area and associated channel were completely filled with sand and sediment from the Missouri River Flooding in 2011. The proposed channel is 3,600 feet long with a 10' wide bottom and 4:1 side slopes.

Contact:
Jeff Felts
515-250-3712
[email protected]




HARRISON -- PROJECT # 12-04-43-01                1/12/2012                Small Project Letting
LOESS HILLS STATE FOREST
COMPLETION OF BUILDING MOVING
Proposal Guarantee:
Completion Date: 4/20/2012

   Reassemble a 30 X 56 wood frame metal shed and a 30x55 wood frame metal shed. Place a compacted 6" rock base in the buildings after reassembling.

Contact:
Mark Johnson
515-250-3713
[email protected]