PROJECTS LETTING -  December , 2019

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DELAWARE 20-03-28-04 Backbone State Park - Entry Portals-2019-12-12   Bid Completion detail
LUCAS 20-05-59-04 Rathbun WMA - North Colyn - Bridge Deck-2019-12-19   Bid Completion detail
LUCAS 20-05-59-06 Stephens State Forest - Roof on office Headquarters-2019-12-19   Bid Completion detail
FRANKLIN 19-02-35-02 Beed's Lake - Flood Repairs-2020-01-09   Bid Completion detail
HARDIN 20-02-42-01 Pine Lake - Tunnel Drainage Repair-2020-01-09   Bid Completion detail
POLK 17-02-77-09 Big Creek WMA - Road Maintenance-2020-01-09   Bid Completion detail
POLK 17-02-77-09 Big Creek WMA - Road Maintenance - Contract-2020-01-09   Bid Completion detail
TAYLOR 19-04-87-01 Lake of Three Fires - Effluent Chlorination System-2020-01-09   Bid Completion detail




DELAWARE -- PROJECT # 20-03-28-04                12/12/2019                Large Project Letting
BACKBONE STATE PARK
ENTRY PORTALS
Proposal Guarantee: $6,250
Completion Date: 5/1/2020

   Backbone State Park will be receiving an Iowa DNR design guide entrance portal and two new sign guide portals (A1 & A3). The design guide portals will have real stone bricking, steel bracketing, and glulam timber supports as well as limestone capstones. The new portals will be placed near the entrances of the state parks, as shown.

ESTIMATED QUANTITIES:
    CLEARING AND GRUBBING     1 L.S.
    SEEDING, FERTILIZING, AND MULCHING     1 L.S.
    DESIGN GUIDE PORTAL     1 L.S.
    A1 PORTAL     1 L.S.
    A3 PORTAL     1 L.S.
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LUCAS -- PROJECT # 20-05-59-04                12/19/2019                Small Project Letting
RATHBUN WMA
NORTH COLYN - BRIDGE DECK
Proposal Guarantee: $0
Completion Date: 5/31/2020

   This project involves replacing a wooden bridge deck with a steel bar grating deck. The bridge is 12'x16'. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




LUCAS -- PROJECT # 20-05-59-06                12/19/2019                Small Project Letting
STEPHENS STATE FOREST
ROOF ON OFFICE HEADQUARTERS
Proposal Guarantee: $0
Completion Date: 6/30/2020

   This project consists of re-shingling the roof of the Stephens Forest Office Headquarters located at 1111 N. 8th Street, Chariton, Iowa. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




FRANKLIN -- PROJECT # 19-02-35-02                1/9/2020                Small Project Letting
BEED'S LAKE
FLOOD REPAIRS
Proposal Guarantee: $0
Completion Date: 5/1/2020

   This project is to repair flood damage to the spillway trail at Beeds Lake State Park including riprap placement, bank repair, gabion baskets and erosion stone and 1" road stone and other work as directed by the DNR Engineer.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




HARDIN -- PROJECT # 20-02-42-01                1/9/2020                Small Project Letting
PINE LAKE
TUNNEL DRAINAGE REPAIR
Proposal Guarantee: $0
Completion Date: 5/15/2020

   This project involves the repair of the drainage at a pedestrian tunnel at Pine Lake State Park under a county highway as shown in the plans and as required by the DNR construction inspector.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




POLK -- PROJECT # 17-02-77-09                1/9/2020                Small Project Letting
BIG CREEK WMA
ROAD MAINTENANCE
Proposal Guarantee: $0
Completion Date: 6/30/2020

   The proposed project includes a bituminous fog seal, painted symbols, patching, transverse joint repair and crack and joint cleaning and sealing (HMA surfaces) at Big Creek Wildlife Management Area as shown in the plans and as required by the DNR construction inspector.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




TAYLOR -- PROJECT # 19-04-87-01                1/9/2020                Small Project Letting
LAKE OF THREE FIRES
EFFLUENT CHLORINATION SYSTEM
Proposal Guarantee: $0
Completion Date: 4/30/2020

   This project consists of installing tablet feeders for chlorination and de-chlorination,a chlorine contact tank and a sampling manhole for the treated wastewater after an existing lagoon system.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov