PROJECTS LETTING -  December , 2016

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

APPANOOSE 16-05-04-06 Honey Creek Resort - PCC Curb & Gutter-2016-12-01   Bid Completion detail
APPANOOSE 17-05-04-05 Honey Creek State Park - House Siding, Windows, Doors-2016-12-01   Bid Completion detail
APPANOOSE 16-05-04-04 Honey Creek State Park - Shower Building Renovation-2016-12-22   Bid Completion detail
APPANOOSE 17-05-04-01 Honey Creek State Park - Pavement Repair-2016-12-22   Bid Completion detail
DALLAS 17-04-25-01 Beaver Lake Wildlife Management Area - Road Repairs-2016-12-22   Bid Completion detail
DICKINSON 15-01-30-04 Orleans - Beach Restroom & Boat Ramp Improvements-2016-12-22   Bid Completion detail
HENRY 16-06-44-03 Geode State Park - Sediment Ponds-2016-12-22   Bid Completion detail
POLK 16-02-77-05 Big Creek State Park - Fish Cleaning Station-2016-12-22   Bid Completion detail
POTTAWATTAMIE 17-04-78-02 Lake Manawa State Park - Pavement Repairs-2016-12-22   Bid Completion detail
TAMA 17-05-86-02 Union Grove State Park - Design Guide Shelter-2016-12-22   Bid Completion detail




APPANOOSE -- PROJECT # 16-05-04-04                12/22/2016                Large Project Letting
HONEY CREEK STATE PARK
SHOWER BUILDING RENOVATION
Proposal Guarantee: $5,000
Completion Date: 5/26/2017

   Honey Creek State Park has two shower buildings in the campground area. This project will remodel the south shower building built in 1988, which is in need of an update. This project will remove all plumbing and electrical fixtures and replace them with modern, efficient products, repaint the interior, install new partitions, replace the roof and the ventilation system. There will be some added site work, concrete sidewalks and lighting, to ease maintenance and decrease damage done by storm water.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    SITE WORK (CONCRETE & BENCH INSTALL)     1 L.S.
    ELECTRICAL AND LIGHTING     1 L.S.
    PLUMBING AND VENTILATION     1 L.S.
    ROOFING AND SHEATHING     1 L.S.
    PAINTING & FINISHING (INCLUDE PARTITIONS)     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 17-05-04-01                12/22/2016                Large Project Letting
HONEY CREEK STATE PARK
PAVEMENT REPAIR
Proposal Guarantee: $10,000
Completion Date: 6/30/2017

   This project consists of approximately 13.2 miles of PCC crack and joint cleaning and sealing, 7 PCC patches totaling approximately 653 SY, and approximately 153 tons of granular surfacing.

ESTIMATED QUANTITIES:
    2312 - GRANULAR SURFACING (ROADWAY)     152.5 Tons
    2528 - TRAFFIC CONTROL     1 L.S.
    2528 - FLAGGERS     20 Each
    2529 - PATCHES, FULL-DEPTH FINISH - 6-in., BY AREA     173.4 S.Y.
    2529 - PATCHES, FULL-DEPTH FINISH - 6-in., BY AREA (50 FEET OR GREATER IN LENGTH)     480.3 S.Y.
    2529 - PATCHES, FULL-DEPTH FINISH, BY COUNT     7 Each
    2533 - MOBILIZATION     1 L.S.
    2542 - CRACK AND JOINT CLEANING AND FILLING (PCC PAVEMENT)     13.2 MI.
    2542 - SEALER MATERIAL (PCC PAVEMENT)     19,710 LB.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DALLAS -- PROJECT # 17-04-25-01                12/22/2016                Large Project Letting
BEAVER LAKE WILDLIFE MANAGEMENT AREA
ROAD REPAIRS
Proposal Guarantee: $1,500
Completion Date: 6/30/2017

   This project consists of crack and joint cleaning and sealing (HMA surfaces), a bituminous fog seal (~7073 SY), a 7.3 SY PCC recreational trail patch and approximately 803 LF of PCC recreational trail crack and joint sealing and filling.

ESTIMATED QUANTITIES:
    2306 - BITUMINOUS FOG SEAL     259 GAL.
    2518 - SAFETY CLOSURE     3 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2528 - PORTABLE DYNAMIC MESSAGE SIGN (PDMS)     14 Day
    2533 - MOBILIZATION     1 L.S.
    2541 - CRACK AND JOINT CLEANING AND SEALING (HMA SURFACES)     0.8 MI.
    2541 - SEALER MATERIAL (HMA SURFACES)      250 LB.
    2543 - TRANSVERSE JOINT REPAIR     20 Tons
    2511 - REMOVAL OF RECREATIONAL TRAIL (PCC)     7.3 S.Y.
    2511 - RECREATIONAL TRAIL, PCC, 5-INCH     7.3 S.Y.
    2542 - CRACK AND JOINT SEALING AND FILLING (PCC TRAIL)     803 L.F.
    2542 - SEALER MATERIAL (PCC TRAIL)     40 LB.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 15-01-30-04                12/22/2016                Large Project Letting
ORLEANS
BEACH RESTROOM & BOAT RAMP IMPROVEMENTS
Proposal Guarantee: $10,000
Completion Date: 9/1/2016

   This project involves the removal of the existing restroom, installation of a new restroom, light poles, construction of sidewalks, utilities and parking lot at Orleans, Dickinson County, Iowa.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    CLEARING AND GRUBBING     1 L.S.
    SITE WORK AND UTILITY CONNECTIONS     1 L.S.
    GROUP MODULAR PRECAST CONCRETE RESTROOM, COMPLETE     1 Each
    DRAIN-DOWN PIT     1 L.S.
    EROSION CONTROL     340 L.F.
    CLASS "A" CRUSHED STONE     178 Tons
    MACADAM STONE     77 Tons
    3/8" MINUS CRUSHED STONE     28 Tons
    ENGINEERING FABRIC     272 S.Y.
    PAVING, P.C. CONCRETE, 7"     161 S.Y.
    WATER MAIN, 2" HDPE     197 L.F.
    ELECTRICAL SERVICE     1 L.S.
    SIDEWALK, PCC, 6"     195 S.Y.
    FURNISH AND INSTALL LIGHT FIXTURE     2 Each
    LIGHT POLE AND BASE, COMPLETE     2 Each
    FURNISH AND INSTALL ELECTRIC METER     1 Each
    RETAINING WALL CURB, 6"     1 L.S.
    DETECTABLE WARNING PANEL     12 L.F.
    REMOVAL OF POWER POLE AND ELECTRICAL BOX     1 Each
    REMOVAL OF LIGHT POLE     1 Each
    REMOVAL OF ELECTRICAL OUTLET     1 L.S.
    REMOVAL OF PAVEMENT     1 L.S.
    REMOVAL OF RAIL     1 L.S.
    RAIL, STEEL TUBE, GALVANIZED     56 L.F.
    EXTERIOR SHOWER, COMPLETE     1 L.S.
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HENRY -- PROJECT # 16-06-44-03                12/22/2016                Large Project Letting
GEODE STATE PARK
SEDIMENT PONDS
Proposal Guarantee: $10,000
Completion Date: 8/15/2017

   CONSTRUCTION OF 4 SEDIMENTATION BASINS, AND OTHER INCIDENTAL WORK AS REQUIRED BY THE IDNR CONSTRUCTION INSPECTOR.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    12" Dia. Smooth Steel Pipe     465 L.F.
    18" Dia. Smooth Steel Pipe     340 L.F.
    36" Dia. Smooth Steel Pipe Riser     20 L.F.
    Trash Rack for Canopy Inlet (12")     2 Each
    Trash Rack for Vertical Riser (36")     2 Each
    Fine Drainfill      400 Tons
    Earthwork / Fill / Grade     36,000 C.Y.
    Core Trench      2,870 C.Y.
    Seed & Mulch     11.6 Acres
    Clearing & Grubbing     16.2 Acres
    6" Stripping and Respread     9,400 C.Y.
    Class D Rip Rap      1,200 Tons
    Field Fence      1,220 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POLK -- PROJECT # 16-02-77-05                12/22/2016                Large Project Letting
BIG CREEK STATE PARK
FISH CLEANING STATION
Proposal Guarantee: $5,000
Completion Date: 5/15/2017

   THIS PROJECT CONSISTS OF REPLACING THE EXISTING FISH CLEANING TABLE, SEPTIC TANK, FLUSHING HYDRANT, AND FLOOR SLAB.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Fish Cleaning Station     1 Each
    2,500 Gallon Precast Concrete Septic Tank     1 Each
    Water Draindown Pit     1 Each
    Flushing Hydrant     1 Each
    Reinforced Concrete Pad     1 L.S.
    Special Backfill     11 Tons
    Drop Manhole Connection     1 L.S.
    Water Connection     1 L.S.
    Electrical Connection     1 L.S.
    Structure Removal and Reinstallation     1 L.S.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POTTAWATTAMIE -- PROJECT # 17-04-78-02                12/22/2016                Large Project Letting
LAKE MANAWA STATE PARK
PAVEMENT REPAIRS
Proposal Guarantee: $10,000
Completion Date: 6/30/2017

   This project consists of an approximate 7800', 3-inch, HMA overlay with granular shoulders. Approximately 600 SY of PCC patching, consisting of 9 different patch areas, and approximately 200 SY of HMA patching, consisting of 4 different patch areas.

ESTIMATED QUANTITIES:
    2102 - Excavation, Class 10, Waste     483.4 C.Y.
    2102 - Special Backfill     815.7 Tons
    2113 - Subgrade Stabilization Material, Polymer Grid     800 S.Y.
    2121 - Granular Shoulders, Type A     410 Tons
    2212 - Patches, Full-Depth Repair, 5-in., HMA     200 S.Y.
    2212 - Patches, By Count (Repair) HMA     4 Each
    2303 - HMA, HT, surface course, 1 /2 mix,      3,164 Tons
    2303 - PG 58-28H, asphalt binder     187.12 Tons
    2502 - Subdrain, Perforated Plastic Pipe, 4 In. Dia.     120 L.F.
    2527 - Painted Pavement Markings, High Build Waterborne     77.21 STA.
    2528 - Traffic Control     1 L.S.
    2528 - Flaggers     14 Each
    2528 - Pilot Cars     7 Each
    2529 - Patches, Full-Depth Finish - 6-in., PCC, By Area. Class M     511 S.Y.
    2529 - Patches, Full-Depth Finish - 6-in., PCC, By Area (50 Feet or greater in length). Class M     89 S.Y.
    2529 - Patches, Full-Depth Finish - 6-in., PCC, By Count     9 Each
    2533 - Mobilization     1 L.S.
    2543 - Transverse Joint Repair     11.17 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




TAMA -- PROJECT # 17-05-86-02                12/22/2016                Large Project Letting
UNION GROVE STATE PARK
DESIGN GUIDE SHELTER
Proposal Guarantee: $5,000
Completion Date: 6/16/2017

   Union Grove will receive a new design guide shelter for the beach area. This new design guide shelter will accommodate 8 picnic tables and serve the beach and lake-front of the park. A new hydrant will also be added as well as an accessible pathway to the shelter.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    TREE CLEARNING AND GRUBBING     1 L.S.
    GRADING     1 L.S.
    SEEDING, FERTILIZING AND MULCHING     1 L.S.
    PILOT ROCK GRILL     1 Each
    6" REINFORCED PCC SIDEWALK AND SUBBASE     1 L.S.
    ELECTRICAL SERVICE AND METER     1 L.S.
    DESIGN GUIDE SHELTER     1 L.S.
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 16-05-04-06                12/1/2016                Small Project Letting
HONEY CREEK RESORT
PCC CURB & GUTTER
Proposal Guarantee: $0
Completion Date: 4/30/2017

   HONEY CREEK RESORT, 2.5' PCC CURB AND GUTTER. THIS PROJECT CONSISTS OF THE ADDITION OF APPROXIMATELY 604 FEET OF PCC CURB AND GUTTER TO AN EXISTING ROADWAY NEAR THE FACILITY ENTRANCE. 12' OF CURB REMOVAL (GRINDING) IS ALSO INCLUDED IN THIS PROJECT. SEND AN EMAIL TO REQUEST PLANS.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




APPANOOSE -- PROJECT # 17-05-04-05                12/1/2016                Small Project Letting
HONEY CREEK STATE PARK
HOUSE SIDING, WINDOWS, DOORS
Proposal Guarantee: $0
Completion Date: 5/31/2017

   This project consists of replacing siding, windows, and doors on the park residence. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov