PROJECTS LETTING -  November , 2022

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DALLAS 23-02-25-01 Saylorville WMA - Sub-1 Road Maintenance-2022-11-17   Bid Completion detail
DELAWARE 21-03-28-02 Backbone State Park - Cabin and Museum Road Reconstruction-2022-11-17   Bid Completion detail
LINN 22-06-57-04 Troy Mills - Rapids Repair-2022-11-17   Bid Completion detail
VAN BUREN 22-06-89-01 Lake Sugema Wildlife Management Area - Mercer Wetland Water Control Structure Replacement-2022-11-17   Bid Completion detail
POTTAWATTAMIE 22-04-78-03 Lake Manawa Law Enforcement - Boat Storage Addition-2022-12-08   Bid Completion detail
SAC 23-01-81-01 Black Hawk Marsh WPA - Streambank Stabilization-2022-12-08   Bid Completion detail
TAMA 22-05-86-01 Union Grove State Park - Pavement Preservation-2022-12-08   Bid Completion detail
DICKINSON 22-01-30-01 Diamond Lake WMA - Diamond Lake WMA Road Maintenance-2022-12-15   Bid Completion detail




DALLAS -- PROJECT # 23-02-25-01                11/17/2022                Large Project Letting
SAYLORVILLE WMA
SUB-1 ROAD MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 6/30/2023

   This project consists of granular roadway maintenance - blading/shaping, spreading new rock, ditch cleaning, placement of rip rap, the installation of rock/ditch checks a new RCP culvert.

ESTIMATED QUANTITIES:
    2101 - CLEARING     1 L.S.
    2104 - EXCAVATION, CL 10, CHANNEL     280 C.Y.
    2125 - RESHAPING DITCHES     22.8 STA.
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING     88 STA.
    2312 - GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE      2,294 Tons
    2312 - GRANULAR SURFACING ON ROAD, CRUSHED STONE, 1.5-INCH     102 Tons
    2312 - GRANULAR SURFACING ON ROAD, CRUSHED STONE, 3-INCH     268 Tons
    2416 - APRON, CONC, 24"     2 Each
    2416 - CULV, CONC RDWY PIPE, 24"     24 L.F.
    2507 - ENGINEERING FABRIC     40 S.Y.
    2507 - REVETMENT, CLASS E     126 Tons
    2507 - EROSION STONE     20 Tons
    2518 - SAFETY CLOSURE     2 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.
    2601 - SEED+FERTILIZE (RURAL)     1 Acres
    2602 - ROCK CHECK DAM     132 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DELAWARE -- PROJECT # 21-03-28-02                11/17/2022                Large Project Letting
BACKBONE STATE PARK
CABIN AND MUSEUM ROAD RECONSTRUCTION
Proposal Guarantee: $100,000
Completion Date: 8/31/2023

   This project consists of removing the existing asphalt roadways and parking lots and constructing new Portland Cement Concrete roadways and parking lots, replacing 6 sanitary sewer manholes, adjusting the rim on 1 sanitary sewer manhole, replacing 1 intake and 2 culverts, installing 1 new intake and culvert and inspecting the condition on 2 intakes at Backbone State Park in Delaware County, Iowa.

ESTIMATED QUANTITIES:
    Clearing and Grubbing     6.8 Acres
    Removal of Existing Pavement and Base     7,799 S.Y.
    Removal of Existing Sidewalk and Base     31 S.Y.
    Removal of Existing Parking Lot and Base     148 S.Y.
    Removal of Intake     1 Each
    Removal of Sanitary Sewer Manhole     6 Each
    Removal of Existing Reinforced Concrete Pipe < 36"     63 L.F.
    Removal of Existing Corrugated Metal Pipe < 36"     65 L.F.
    Removal of Headwall     1 L.S.
    Removal of Existing Gate     1 L.S.
    Manhole, Sanitary Sewer, SW-303, 48"     6 Each
    Manhole Adjustment, Minor     1 Each
    Intake, SW-513     2 Each
    Intake Investigation     2 Each
    Tile Investigation     50 L.F.
    Intake Grate     1 Each
    Roadway Pavement, 7" PCC     10,725 S.Y.
    Parking Lot Pavement, 7" PCC     606 S.Y.
    Sidewalk, 6" PCC     26 S.Y.
    Special Backfill     4,209 Tons
    Granular Shoulder, Type A     606 Tons
    Reinforced Concrete Pipe, 18"     72 L.F.
    Reinforced Concrete Pipe, 24"     40 L.F.
    Reinforced Concrete Pipe, 30"     90 L.F.
    Apron, Conc, 18"     1 Each
    Apron, Conc, 30"     1 Each
    Footing for Concrete Pipe Apron     2 Each
    Pipe Apron Guard, 18"     1 Each
    Pipe Apron Guard, 24"     1 Each
    Pipe Apron Guard, 30"     1 Each
    Erosion Control Mat, RECP Type 2.C     24 S.Y.
    Excavation, Class 10, Roadway and Borrow     869 C.Y.
    Embankment-In-Place     4,059 C.Y.
    Revetment, Class E     25 Tons
    Painted Pavement Mark, High-Build Waterborne     1 L.S.
    Precast Concrete Parking Wheel Stops     16 Each
    Detectable Warning Panel     40 S.F.
    Seeding, Fertilizing, and Mulching     6.8 Acres
    Filter Sock, 8"     9,310 L.F.
    Signing     10 Each
    NPDES General Permit #2 & SWPPP     1 Each
    Construction Staking     1 L.S.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




VAN BUREN -- PROJECT # 22-06-89-01                11/17/2022                Large Project Letting
LAKE SUGEMA WILDLIFE MANAGEMENT AREA
MERCER WETLAND WATER CONTROL STRUCTURE REPLACEMENT
Proposal Guarantee: $12,500
Completion Date: 8/15/2023

   This project consists of removing the existing CMP water control structure and installing a reinforced concrete box drop inlet and smooth metal pipe spillway.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Site Restoration     1 L.S.
    Intake Structure     1 L.S.
    48" Smooth Metal Pipe     177.5 L.F.
    Reinforced Concrete Footing And Pad     1 L.S.
    6" Smooth Metal Pipe     79.5 L.F.
    Fine Drainfill     130 Tons
    Aluminum Stoplogs     1 L.S.
    Sediment Log     216 L.F.
    Demolition     1 L.S.
    Class E Revetment     65 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POTTAWATTAMIE -- PROJECT # 22-04-78-03                12/8/2022                Large Project Letting
LAKE MANAWA LAW ENFORCEMENT
BOAT STORAGE ADDITION
Proposal Guarantee: $12,500
Completion Date: 8/31/2023

   Lake Manawa has a law enforcement boat storage building that isn't large enough or tall enough for their new, modern boats. This 40x48 addition will add the storage space and overhead door heights needed to get the larger boats under a roof. The project will be a post-frame structure with four (4) overhead doors and storage loft in the rear of the building.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Demolition     1 L.S.
    Construction Staking     1 L.S.
    Class A Crushed Stone     220 Tons
    5" Non-Reinforced PCC     7 S.Y.
    1"x1"x1" HDPE Tee     1 Each
    1" Curb Stop     1 Each
    1" HDPE Pipe     122 L.F.
    Sanitary Yard Hydrant Woodford Model S-3     1 Each
    Seeding and Mulching     1 L.S.
    Electrical and Associated Items     1 L.S.
    Post-Frame Storage Building and Concrete     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SAC -- PROJECT # 23-01-81-01                12/8/2022                Large Project Letting
BLACK HAWK MARSH WPA
STREAMBANK STABILIZATION
Proposal Guarantee: $12,500
Completion Date: 6/30/2023

   This project consists of armoring approximately 2,430 feet of streambank with fieldstone.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    6"-12" Fieldstone     2,384 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




TAMA -- PROJECT # 22-05-86-01                12/8/2022                Large Project Letting
UNION GROVE STATE PARK
PAVEMENT PRESERVATION
Proposal Guarantee: $6,250
Completion Date: 8/31/2023

   This project consists of pavement preservation/roadway maintenance by patching and seal coating asphalt roads and placing crushed rock surfacing as directed by DNR Field Engineer at Union Grove State Park.

ESTIMATED QUANTITIES:
    2307 - BINDER BITUMEN, CRS-2P     5,081 GAL.
    2307 - AGGREGATE, ROADWAY COVER, 1/2"     215 Tons
    2312 - GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE     146 S.Y.
    2528 - TRAFFIC CONTROL     1 L.S.
    2529 - PATCHES, FULL-DEPTH FINISH, 5-IN., BY AREA, HMA     8 S.Y.
    2529 - PATCHES, FULL-DEPTH FINISH, 5-IN., BY COUNT, HMA     2 Each
    2529 - MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LINN -- PROJECT # 22-06-57-04                11/17/2022                Small Project Letting
TROY MILLS
RAPIDS REPAIR
Proposal Guarantee: $0
Completion Date: 9/30/2023

   This project will repair rapids in the Wapsipinicon River at the Troy Mills Bridge by constructing stone weirs consisting of Class E and Class B revetment (provided by Owner) and 75 boulders (to be provided by the Contractor).

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




DICKINSON -- PROJECT # 22-01-30-01                12/15/2022                Small Project Letting
DIAMOND LAKE WMA
DIAMOND LAKE WMA ROAD MAINTENANCE
Proposal Guarantee: $0
Completion Date: 5/15/2023

   This project is designed to repair surface drainage issues and add granular surfacing to an access roadway and parking lot at the Diamond Lake Wildlife Management Area (WMA) in Dickinson, County. Work under this project includes blading and shaping of the existing granular roadway to establish positive drainage, and installation of Class "A" stone surfacing. Contact Jeff Felts for plans and specifications.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov