PROJECTS LETTING -  November , 2016

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

JACKSON 15-06-49-01 Bellevue State Park - Lagoon Valve Replacement-2016-11-17   Bid Completion detail
JASPER 16-05-50-02 Rock Creek - ADA pathway to fishing pier-2016-11-17   Bid Completion detail
POLK 17-02-77-01 Big Creek - Grade Stabilization Structure-2016-11-17   Bid Completion detail
APPANOOSE 16-05-04-06 Honey Creek Resort - PCC Curb & Gutter-2016-12-01   Bid Completion detail
APPANOOSE 17-05-04-05 Honey Creek State Park - House Siding, Windows, Doors-2016-12-01   Bid Completion detail




JACKSON -- PROJECT # 15-06-49-01                11/17/2016                Small Project Letting
BELLEVUE STATE PARK
LAGOON VALVE REPLACEMENT
Proposal Guarantee: $0
Completion Date: 12/23/2016

   Project includes replacing four lagoon outlet knife gate valves with 6” eccentric plug valves.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




JASPER -- PROJECT # 16-05-50-02                11/17/2016                Small Project Letting
ROCK CREEK
ADA PATHWAY TO FISHING PIER
Proposal Guarantee: $0
Completion Date: 4/30/2017

   This project consists of concrete pumping to construct a concrete walkway to the ADA fishing pier at Rock Creek State park. Also placement of riprap and pumping revetment grout. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




POLK -- PROJECT # 17-02-77-01                11/17/2016                Small Project Letting
BIG CREEK
GRADE STABILIZATION STRUCTURE
Proposal Guarantee: $0
Completion Date: 8/15/2017

   This project consists of constructing an earthen embankment with a CMP principal spillway.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




APPANOOSE -- PROJECT # 16-05-04-06                12/1/2016                Small Project Letting
HONEY CREEK RESORT
PCC CURB & GUTTER
Proposal Guarantee: $0
Completion Date: 4/30/2017

   HONEY CREEK RESORT, 2.5' PCC CURB AND GUTTER. THIS PROJECT CONSISTS OF THE ADDITION OF APPROXIMATELY 604 FEET OF PCC CURB AND GUTTER TO AN EXISTING ROADWAY NEAR THE FACILITY ENTRANCE. 12' OF CURB REMOVAL (GRINDING) IS ALSO INCLUDED IN THIS PROJECT. SEND AN EMAIL TO REQUEST PLANS.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




APPANOOSE -- PROJECT # 17-05-04-05                12/1/2016                Small Project Letting
HONEY CREEK STATE PARK
HOUSE SIDING, WINDOWS, DOORS
Proposal Guarantee: $0
Completion Date: 5/31/2017

   This project consists of replacing siding, windows, and doors on the park residence. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov