PROJECTS LETTING -  November , 2013

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

LUCAS 14-05-59-01 Stephens State Forest - Lucas Unit Bridge Stabilization-2013-11-14   Bid Completion detail
APPANOOSE 14-05-04-04 Rathbun Fish Hatchery - Site Preparation and Erection of Clear Span Building-2013-11-21   Bid Completion detail
CASS 14-04-15-02 Lake Anita - Shoreline Stabilization-2013-11-21   Bid Completion detail
DICKINSON 12-01-30-15 Mini-Wakan - Entrance roadway-2013-11-21   Bid Completion detail
GUTHRIE 13-04-39-03 Springbrook - Interpretive kiosk -2013-11-21   Bid Completion detail
JOHNSON 12-06-52-07 Hawkeye Wildlife Management Area Phase 2 - Water Quality & Wetland Project-2013-11-21   Bid Completion detail
LINN 14-06-57-01 Pleasant Creek Recreation Area - entrance portal construction-2013-11-21   Bid Completion detail
MONTGOMERY 14-04-69-01 Viking Lake - Viking Lake Jetty Repair-2013-11-21   Bid Completion detail
POLK 13-05-77-07 Red Rock Management Area - Runnells Impoundment Project-2013-11-21   Bid Completion detail
APPANOOSE 14-05-04-03 Honey Creek Resort - Dock Repairs-2013-12-05   Bid Completion detail
MUSCATINE 10-06-70-03 Wildcat Den State Park - replace water lines-2013-12-12   Bid Completion detail
WARREN 14-05-91-01 Summerset State Park - Shoreline Angler Access-2013-12-12   Bid Completion detail




APPANOOSE -- PROJECT # 14-05-04-04                11/21/2013                Large Project Letting
RATHBUN FISH HATCHERY
SITE PREPARATION AND ERECTION OF CLEAR SPAN BUILDING
Proposal Guarantee: $5,000
Completion Date: 4/30/2014

   This project involves site preparation and erection of a clear span building and other incidental work as required by DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Freestanding Clear Span Building     1 L.S.
    Sanitary Sewer     1 L.S.
    Water Service     1 L.S.
    Concrete     1 L.S.
    3/8" to 1/2" Clean Limestone Chips     100 Tons
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 12-01-30-15                11/21/2013                Large Project Letting
MINI-WAKAN
ENTRANCE ROADWAY
Proposal Guarantee: $20,000
Completion Date: 11/1/2014

   This project consists of removing the existing entrance roadway and gravel parking, and installing a new 20-foot wide portland cement concrete roadway with granular sub-base along with the paving of the adjacent parking areas and will require demolition, clearing, grading, culvert pipes, paving, and seeding/fertilizing/mulching disturbed areas located in Mini Wakan State Park, Dickinson County, Iowa.

ESTIMATED QUANTITIES:
    Clearing and Grubbing     1 L.S.
    HMA/Pavement Removal     2,896 S.Y.
    Removal of Existing Sidewalks     14 S.Y.
    Removal of Existing Gravel Parking Areas     445 S.Y.
    Full Depth Saw Cut     139 L.F.
    Grading     683 C.Y.
    Silt Fence     260 L.F.
    Special Backfill     907 Tons
    Granular Shoulder     191 Tons
    6-inch Non-Reinforced PCC     3,328 S.Y.
    5-inch Non-Reinforced PCC Sidewalk     99 S.Y.
    Sidewalk Detectable Warnings     4 Each
    15-inch Arch CMP     40 L.F.
    15-inch Arch CMP FES     2 Each
    Precast Concrete Parking Wheel Stops     5 Each
    Paint Striping     1 L.S.
    Traffic Control     1 L.S.
    Seeding, Fertilizing and Mulching     1 L.S.
    Construction Survey Staking     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JOHNSON -- PROJECT # 12-06-52-07                11/21/2013                Large Project Letting
HAWKEYE WILDLIFE MANAGEMENT AREA PHASE 2
WATER QUALITY & WETLAND PROJECT
Proposal Guarantee: $25,000
Completion Date: 12/15/2014

   The project consists of construction of Phase 2 of the project including clearing and grubbing, berm construction, water control structures, an emergency spillway, and incidental items on the east 5,500 feet of the project site as shown in the project documents and as directed by the DNR Inspector.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clearing & Grubbing     2 Acres
    Class 10 Excavation, strip and re-use     2,540 C.Y.
    Berm Construction, Class 10 Excavation (Borrow Area)     39,126 C.Y.
    10' x 10' Precast RCB no Top     48 L.F.
    Sheet Piling     2,240 S.F.
    Curtain Walls (Precast Concrete)     6.4 C.Y.
    Aluminum Stoplog Guides     730 LB.
    Aluminum Stoplog & Aluminum Hooks     700 LB.
    Geotextile - WCS & Berm     600 S.Y.
    Rip Rap - WCS & Berm     360 Tons
    P.C.C. Grout for Rip Rap - WCS & Berm     71 C.Y.
    Crushed Rock Surfacing     42 Tons
    Silt Fencing     4,620 L.F.
    Inplement Stormwater Pollution Plan     1 L.S.
    8" PCC Spillway crest with Wire     652 S.Y.
    Geotextile - Spillway     6,125 S.Y.
    Rip Rap - Spillway     3,695 Tons
    P.C.C. Grout - Spillway     342 C.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LINN -- PROJECT # 14-06-57-01                11/21/2013                Large Project Letting
PLEASANT CREEK RECREATION AREA
ENTRANCE PORTAL CONSTRUCTION
Proposal Guarantee: $5,000
Completion Date: 5/30/2014

   PLEASANT CREEK STATE PARK WILL BE RECEIVING A IOWA DEPARTMENT OF NATURAL RESOURCES DESIGN GUIDE ENTRANCE PORTAL. THIS ENTRANCE PORTAL WILL BE ONE OF THE FIRST BUILT TO THE NEW DESIGN GUIDE STANDARD AND WILL BE THE PRECEDENT TO ALL NEW ENTRANCE PORTALS DESIGNED AND BUILT BY THE DNR. IT WILL HAVE REAL STONE BRICKING, STEEL BRACKETING AND GLULAM TIMBER SUPPORTS AS WELL AS CAST CONCRETE CAPSTONES.

ESTIMATED QUANTITIES:
    CLEARING AND GRUBBING     1 L.S.
    GRADING     1 L.S.
    SEEDING     1 L.S.
    8" FILTER SOCK     48 L.F.
    ELECTRIC LINE REROUTING     1 L.S.
    ENTRANCE PORTAL MONUMENT     1 L.S.
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POLK -- PROJECT # 13-05-77-07                11/21/2013                Large Project Letting
RED ROCK MANAGEMENT AREA
RUNNELLS IMPOUNDMENT PROJECT
Proposal Guarantee: $30,000
Completion Date: 9/30/2014

   This project consists of construction of a surface water impoundment improvements project consisting of an intake diversion structure, a diversion channel, new emergency spillways, embankment construction and repair, outlet control structure, outlet channel excavation, storm water controls, seeding and mulching, and other appurtenances, in accordance with the project plans and specifications and as directed by the Iowa DNR inspector.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clearing & Grubbing     1 L.S.
    Site Preparation     1 L.S.
    Diversion Channel     22,000 C.Y.
    Excavation, Spillways 3, 4, & 5     2,953 C.Y.
    Excavation, Creek, Excavator Hourly Rate     30 HR.
    Excavation, Creek, Dozer Hourly Rate     50 HR.
    Excavation, Creek, Truck Hourly Rate     20 HR.
    Embankment, Crossing 1     200 C.Y.
    Embankment, Crossing 2     200 C.Y.
    embankment, South Containment     10,440 C.Y.
    Culvert, 36" Welded Steel Pipe     68 L.F.
    Culvert, 6' x 4' Reinforced Concrete Box     60 L.F.
    Drop End Wall for 6'x4' RCB     4 Each
    Curbs for 6'x4' RCB     4 Each
    6' x 4'RCB Sloped End Section     4 Each
    36" RCP, Class III     32 L.F.
    36" Dual Wall HDPE     195 L.F.
    36" x 45 Degree Bends, HDPE, Dual Wall     8 Each
    Rip Rap - DU Class I     20 Tons
    Rip Rap - DU Class II     390 Tons
    Rip Rap - DU Class III     315 Tons
    Rip Rap - DU Class IV     35 Tons
    3/4" - 1 1/4" Clear Rock Bedding     500 Tons
    Sheet Pile Material-Pile Pro PZ 90 Degree cCorners, 20' Long     4 Each
    Steel Sheet Pile Installation (Material Provided by Owner)     4,141 S.F.
    Driven 8 x 36 H-Piles     112 L.F.
    Driven 12 x 63 H-Piles     180 L.F.
    Non-Driven 12 x 63 H-Piles     12 L.F.
    Intake Diversion Structural Pile Cap     1 L.S.
    Intake Diversion Structure, Galv Stoplog Channels,Lift Hooks, Catwalk      1 L.S.
    Intake Diversion Structure, Galv Stoplog Storage Box     1 L.S.
    Intake Diversion Structure, Galv Steel Grating     187 S.F.
    Intake Diversion Structure, Aluminum Stoplogs     1 L.S.
    Outlet Structure Pile Cap     1 L.S.
    Outlet Structure Stoplog Channels, Lift Hooks, Catwalk     1 L.S.
    Outlet Structure Stoplog Storage Box     1 L.S.
    Outlet Structure Steel Grating     213 S.F.
    Outlet Aluminum Stoplogs     1 L.S.
    Standard Silt Fence     2,500 L.F.
    12" Straw Wattles     650 L.F.
    Seeding & Mulching     11.4 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LUCAS -- PROJECT # 14-05-59-01                11/14/2013                Small Project Letting
STEPHENS STATE FOREST
LUCAS UNIT BRIDGE STABILIZATION
Proposal Guarantee: $0
Completion Date: 3/15/2014

   This project consists of the placement of 584 SY engineering fabric and 473 tons class "D" riprap to protect a pedestrian/equestrian bridge. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




CASS -- PROJECT # 14-04-15-02                11/21/2013                Small Project Letting
LAKE ANITA
SHORELINE STABILIZATION
Proposal Guarantee: $0
Completion Date: 4/10/2014

   Repair 850 feet of the existing west shorline of the lake with screened Class "E" riprap. Repair the shorline on the end on the fishing jetty using 50 ton of screened Class "E" riprap.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




GUTHRIE -- PROJECT # 13-04-39-03                11/21/2013                Small Project Letting
SPRINGBROOK
INTERPRETIVE KIOSK
Proposal Guarantee: $0
Completion Date: 4/30/2014

   NEW DESIGN GUIDE ENTRANCE PORTAL; PYLON WITH BEAM AND SIGN IN UNCOURSED LIMESTONE LEDGE ROCK PATTERN AS SHOWN.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




MONTGOMERY -- PROJECT # 14-04-69-01                11/21/2013                Small Project Letting
VIKING LAKE
VIKING LAKE JETTY REPAIR
Proposal Guarantee: $0
Completion Date: 4/10/2014

   Repair the existing shorline riprap on the 6 fishing jetties using 800 ton of screened Class "E" riprap.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




APPANOOSE -- PROJECT # 14-05-04-03                12/5/2013                Small Project Letting
HONEY CREEK RESORT
DOCK REPAIRS
Proposal Guarantee: $0
Completion Date: 5/23/2014

   This project includes repairs to the dock system at Honey Creek Resort including diving, electrical, concrete, welding, and fabrication work. Bidders must arrange for an on site review with the engineer prior to submitting a bid. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




MUSCATINE -- PROJECT # 10-06-70-03                12/12/2013                Small Project Letting
WILDCAT DEN STATE PARK
REPLACE WATER LINES
Proposal Guarantee: $5,000
Completion Date: 5/30/2014

   This project consists of replacing an existing 2-inch water line to the lower picnic area, 1,860 feet in length, along with 3 yard hydrants located at Wildcat Den State Park in Muscatine County, Iowa.

Contact:
Michael Dufoe

Michael.dufoe@dnr.iowa.gov




WARREN -- PROJECT # 14-05-91-01                12/12/2013                Small Project Letting
SUMMERSET STATE PARK
SHORELINE ANGLER ACCESS
Proposal Guarantee: $0
Completion Date: 4/30/2014

   This project consists of construction of an angler access made of macadam stone, erosion stone, and rock chips. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov