The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual. Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms, Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.
Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis.
To subscribe to this list, click here.
The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.
To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website.
You may obtain a free download from
Click on the project names below to view the one(s) which interest you.
This project consists of replacing the existing concrete water control structure with a polypropylene pipe spillway and an in-line water control structure.
Contact: Don Labate 515-250-3714 Don.Labate@dnr.iowa.gov
Project includes repairing a large washout at a culvert outlet along a road within Bellevue State Park by importing fill material and armoring with 230 tons of revetment.
Contact: Michael Dufoe 515-985-9196 Michael.dufoe@dnr.iowa.gov
This project consists of two pond repairs in the Stephens State Forest, Whitebreast Unit.
Mine Pond: Place 80 tons of class E riprap in the washout on the west end of the concrete spillway.
North Pond: Place 35 tons of 1" clean stone along and under the existing CMP outlet.
Contact: Jason Kruse (515) 250-3707 jason.kruse@dnr.iowa.gov