PROJECTS LETTING -  November , 2019

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

CARROLL 18-02-14-01 Artesian Lake WMA - Water Control Structure Replacement-2019-11-07   Bid Completion detail
HENRY 19-06-44-01 Geode - Boundary Fencing-2019-11-07   Bid Completion detail
JACKSON 20-06-49-03 Bellevue - Washout Repair-2019-11-14   Bid Completion detail
POLK 20-02-77-02 Big Creek State Park - West Road Maintenance-2019-11-14   Bid Completion detail
LUCAS 20-05-59-05 Stephens State Forest - Mine Pond & North Pond Spillway Repairs-2019-11-21   Bid Completion detail
TAMA 20-05-86-01 Iowa River Wildlife Unit - Otter Creek Marsh WMA West Access Road Maintenance-2019-11-21   Bid Completion detail




POLK -- PROJECT # 20-02-77-02                11/14/2019                Large Project Letting
BIG CREEK STATE PARK
WEST ROAD MAINTENANCE
Proposal Guarantee: $37,500
Completion Date: 9/30/2020

   This projects consists of a 3-inch, High Traffic, HMA overlay, with a 1-inch interlayer. Pavement scarification, painted symbols are also included.

ESTIMATED QUANTITIES:
    2214 - PAVEMENT SCARIFICATION     37,752 S.Y.
    2214 - BLADING AND SHAPING SHOULDER MATERIAL     187 STA.
    2303 - HOT MIX ASPHALT MIXTURE INTERLAYER BASE COURSE, 3/8 IN. MIX     1,979 Tons
    2303 - HOT MIX ASPHALT HIGH TRAFFIC, INTERMEDIATE COURSE, 1/2 IN. MIX     2,968 Tons
    2303 - HOT MIX ASPHALT HIGH TRAFFIC, SURFACE COURSE, 1/2 IN. MIX, NO SPECIAL FRICTION REQUIREMENT     2,968 Tons
    2303 - ASPHALT BINDER, PG 58-28H, HIGH TRAFFIC     407 Tons
    2303 - ASPHALT BINDER, PG 58-34E, EXTREMELY HIGH TRAFFIC     115 Tons
    2518 - SAFETY CLOSURE     4 Each
    2527 - PAINTED SYMBOLS AND LEGENDS, HIGH-BUILD WATERBORNE     4 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CARROLL -- PROJECT # 18-02-14-01                11/7/2019                Small Project Letting
ARTESIAN LAKE WMA
WATER CONTROL STRUCTURE REPLACEMENT
Proposal Guarantee: $0
Completion Date: 6/15/2020

   This project consists of replacing the existing concrete water control structure with a polypropylene pipe spillway and an in-line water control structure.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




HENRY -- PROJECT # 19-06-44-01                11/7/2019                Small Project Letting
GEODE
BOUNDARY FENCING
Proposal Guarantee:
Completion Date: 12/17/2019

   Project includes installing 2,185 LF of fence at two locations along the boundary of Geode State Park.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




JACKSON -- PROJECT # 20-06-49-03                11/14/2019                Small Project Letting
BELLEVUE
WASHOUT REPAIR
Proposal Guarantee:
Completion Date: 12/23/2019

   Project includes repairing a large washout at a culvert outlet along a road within Bellevue State Park by importing fill material and armoring with 230 tons of revetment.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




LUCAS -- PROJECT # 20-05-59-05                11/21/2019                Small Project Letting
STEPHENS STATE FOREST
MINE POND & NORTH POND SPILLWAY REPAIRS
Proposal Guarantee: $0
Completion Date: 2/29/2020

   This project consists of two pond repairs in the Stephens State Forest, Whitebreast Unit. Mine Pond: Place 80 tons of class E riprap in the washout on the west end of the concrete spillway. North Pond: Place 35 tons of 1" clean stone along and under the existing CMP outlet.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




TAMA -- PROJECT # 20-05-86-01                11/21/2019                Small Project Letting
IOWA RIVER WILDLIFE UNIT
OTTER CREEK MARSH WMA WEST ACCESS ROAD MAINTENANCE
Proposal Guarantee: $0
Completion Date: 6/30/2020

   This project consists of blading/shaping 1.25 miles of road and placing 1000 tons of roadstone.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov