PROJECTS LETTING -  October , 2018

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DICKINSON 18-01-30-06 Gull Point State Park - Entry Portal Repair (D1FY19-10)-2018-10-25   Bid Completion detail
MONONA 19-01-67-01 Lewis and Clark State Park - Boat Ramp Pit Latrine-2018-11-01   Bid Completion detail
WARREN 18-05-91-05 Lake Ahquabi State Park - Parking for Boat Ramp in Campground-2018-11-01   Bid Completion detail
BOONE 19-02-08-01 Boone Research Station - Attic Insulation-2018-11-08   Bid Completion detail
BUCHANAN 10-03-10-01 Littleton Iowa - Dam Mitigation-2018-11-15   Bid Completion detail
BUTLER 19-03-12-02 Lower West Fork Wildlife Area - Wood Turtle Habitat-2018-11-15   Bid Completion detail
GUTHRIE 17-04-39-02 Springbrook State Park/Beaver Lake WMA - Pavement Repair - Rebid-2018-11-15   Bid Completion detail
HARDIN 17-02-42-01 Pine Lake State Park - Pavement Maintenance-2018-11-15   Bid Completion detail
JASPER 17-05-50-03 Rock Creek State Park - Pavement Maintenance Rebid-2018-11-15   Bid Completion detail
JOHNSON 17-06-52-01 Lake Macbride State Park - Pavement Repair-2018-11-15   Bid Completion detail
KOSSUTH 19-02-55-01 AA Call State Park - D1FY19-1 Lodge Repairs-2018-11-15   Bid Completion detail
MONTGOMERY 17-04-69-02 Viking Lake State Park - Office & Shop Building (REBID)-2018-11-15   Bid Completion detail
MUSCATINE 16-06-70-04 Fairport State Recreation Area - Crack Sealing and Slurry Seal - Rebid-2018-11-15   Bid Completion detail
POTTAWATTAMIE 17-04-78-06 Wilson Island State Recreation Area - Pavement Repair - Rebid-2018-11-15   Bid Completion detail
SAC 18-01-81-07 Grant Park - Enhancement Project Rebid-2018-11-15   Bid Completion detail
SCOTT 17-06-82-01 West Lake Complex - Watershed Improvements-2018-11-15   Bid Completion detail
SHELBY 17-04-83-02 Prairie Rose State Park - Pavement Repair-Rebid-2018-11-15   Bid Completion detail
STORY 16-02-85-05 Hickory Grove Lake - Mechanical Dredging & Shoreline Armoring-2018-11-15   Bid Completion detail
STORY 18-02-85-03 State Forrest Nursery - Irrigation System-2018-11-15   Bid Completion detail
UNION 17-04-88-06 Green Valley State Park - Pavement Repair Rebid-2018-11-15   Bid Completion detail
VAN BUREN 18-06-89-01 Lacey-Keosauqua State Park - Campground Road Seal Coat-2018-11-15   Bid Completion detail
WOODBURY 19-01-97-01 Stone State Park - D1FY19-3 Lodge & Shelter Repairs-2018-11-15   Bid Completion detail




BUCHANAN -- PROJECT # 10-03-10-01                11/15/2018                Large Project Letting
LITTLETON IOWA
DAM MITIGATION
Proposal Guarantee: $25,000
Completion Date: 6/30/2019

   This project consists of removing an existing concrete low head dam and installing rock arch rapids.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clearing and Grubbing     1 L.S.
    Dam Removal     1 L.S.
    Excavation, Export     1,550 C.Y.
    Base Stone, Class "E" Revetment     4,500 Tons
    6" Minus Choke Stone     1,160 Tons
    Weir Stone (3.5'x3.0'x1.5' Min.)     350 Tons
    Stabilized Construction Entrance (Macadam Stone)     30 Tons
    Erosion Control     1 L.S.
    Seeding/Fertilizing/Mulching     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




GUTHRIE -- PROJECT # 17-04-39-02                11/15/2018                Large Project Letting
SPRINGBROOK STATE PARK/BEAVER LAKE WMA
PAVEMENT REPAIR - REBID
Proposal Guarantee: $12,500
Completion Date: 9/30/2019

   This project consists of a bituminous fog seal, slurry leveling, patching, transverse joint repair and cleaning and filling cracks (pavement maintenance). A second location consists of a bituminous fog seal, transverse joint repair and cleaning and filling crack (pavement maintenance).

ESTIMATED QUANTITIES:
Springbrook 
    2102 - SPECIAL BACKFILL     17.5 Tons
    2213 - EXCAVATION, CLASS 13, FOR WIDENING     18.5 C.Y.
    2303 - HOT MIX ASPHALT MIXTURE, COMMERCIAL MIX (INCLUDES ASPHALT BINDER), AS PER PLAN     18 Tons
    2306 - BITUMINOUS FOG SEAL (PAVEMENT) RS-1 EMULSION GRADE     1,044 GAL.
    2319 - SLURRY LEVELING     3.4 MI.
    2319 - ASPHALT EMULSION FOR SLURRY LEVELING, SLURRY WEDGE, AND SLURRY TREATMENT     850 GAL.
    2510 - REMOVAL OF PAVEMENT     22 S.Y.
    2518 - SAFETY CLOSURE     7 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2529 - PATCHES, FULL-DEPTH FINISH, 5-IN., BY AREA. HMA     166 S.Y.
    2529 - PATCHES, FULL-DEPTH FINISH, 5-IN., BY COUNT. HMA     7 Each
    2533 - MOBILIZATION     1 L.S.
    2543 - TRANSVERSE JOINT REPAIR     42 Tons
    2544 - CLEANING AND FILLING CRACKS (PAVEMENT MAINTENANCE)     3.4 MI.
    2544 - HOT MIX ASPHALT FOR CRACK FILLING     2 Tons
    2544 - FILLER MATERIAL (MAINTENANCE)     850 GAL.
Beaver Lake 
    2306 - BITUMINOUS FOG SEAL     279 GAL.
    2518 - SAFETY CLOSURE     3 Each
    2533 - MOBILIZATION     1 L.S.
    2543 - TRANSVERSE JOINT REPAIR     25 Tons
    2544 - CRACK AND JOINT CLEANING AND SEALING (HMA SURFACES)     1 MI.
    2544 - SEALER MATERIAL (HMA SURFACES)      320 GAL.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HARDIN -- PROJECT # 17-02-42-01                11/15/2018                Large Project Letting
PINE LAKE STATE PARK
PAVEMENT MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 9/30/2019

   The proposed project includes a bituminous fog seal, painted symbols, patching, transverse joint repair and crack and joint cleaning and sealing (HMA surfaces).

ESTIMATED QUANTITIES:
 
    2306 - Bituminous Fog Seal (Pavement)     566 GAL.
    2518 - Safety Closure     6 Each
    2527 - Painted Symbols and Legends, Durable     5 Each
    2528 - Traffic Control     1 L.S.
    2529 - Patches, Full-Depth Finish, By Area     199 S.Y.
    2529 - Patches, Full-Depth Finish, By Count     10 Each
    2533 - Mobilization     1 L.S.
    2543 - Transverse Joint Repair     92 Tons
    2544 - Crack and Joint Cleaning and Sealing (HMA Surfaces)     2 MI.
    2544 - Hot Mix Asphalt for Crack Sealing     1 Tons
    2544 - Sealer Material (HMA)     700 GAL.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JASPER -- PROJECT # 17-05-50-03                11/15/2018                Large Project Letting
ROCK CREEK STATE PARK
PAVEMENT MAINTENANCE REBID
Proposal Guarantee: $25,000
Completion Date: 9/30/2019

   The proposed project includes a bituminous forg seal, full-depth patching, transverse joint repair and cleaning and fill cracks (pavement maintenance)

ESTIMATED QUANTITIES:
    2306 - ASPHALT EMULSION FOR FOG SEAL (PAVEMENT)     1,789 GAL.
    2518 - SAFETY CLOSURE     3 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2525 - FLAGGERS     24 Each
    2528 - PILOT CARS     12 Each
    2529 - PATCHES, FULL-DEPTH FINISH, BY AREA     150 S.Y.
    2529 - PATCHES, FULL-DEPTH FINISH, BY COUNT     5 Each
    2533 - MOBILIZATION     1 L.S.
    2543 - TRANSVERSE JOINT REPAIR     223 Tons
    2544 - CLEANING AND FILLING CRACKS (PAVEMENT MAINTENANCE)     5.6 MI.
    2544 - HOT MIX ASPHALT FOR CRACK FILLING     1 Tons
    2544 - FILLER MATERIAL (MAINTENANCE)     1,120 GAL.
    CLEANING AND FILLING CRACKS (PCC)     500 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JOHNSON -- PROJECT # 17-06-52-01                11/15/2018                Large Project Letting
LAKE MACBRIDE STATE PARK
PAVEMENT REPAIR
Proposal Guarantee: $25,000
Completion Date: 9/30/2019

   The proposed project consists of a bituminous fog seal, painted pavement markings, patching, longitudinal and transverse joint repair, cleaning and filling cracks (pavement maintenance) and the installation of inlet covers.

ESTIMATED QUANTITIES:
    2306 - BITUMINOUS FOG SEAL (PAVEMENT)     2,447 GAL.
    2518 - SAFETY CLOSURE     3 Each
    2527 - PAINTED PAVEMENT MARKINGS, HIGH-BUILD WATERBORNE     740 STA.
    2528 - TRAFFIC CONTROL     1 L.S.
    2529 - PATCHES, FULL-DEPTH REPAIR, 5-IN., HMA     191 S.Y.
    2529 - PATCHES, BY COUNT (REPAIR)     17 Each
    2533 - MOBILIZATION     1 L.S.
    2540 - LONGITUDINAL JOINT REPAIR     1,250 L.F.
    2543 - TRANSVERSE JOINT REPAIR     240 Tons
    2544 - CLEANING AND FILLING CRACKS (PAVEMENT MAINTENANCE) HMA     7.1 MI.
    2544 - HOT MIX ASPHALT FOR CRACK FILLING     1 Tons
    2544 - FILLER MATERIAL (MAINTENANCE)     1,420 GAL.
    INLET COVER     4 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




KOSSUTH -- PROJECT # 19-02-55-01                11/15/2018                Large Project Letting
AA CALL STATE PARK
D1FY19-1 LODGE REPAIRS
Proposal Guarantee: $12,500
Completion Date: 5/31/2019

   The Contractor shall demolish the concrete slab on the rear of the lodge building. The contractor shall repoint the existing stone breeze-way walls, pour a new slab on the in the area which was demolished. The contractor shall also chink areas around the lodge, demolish and rebuild the pump house and restore some other miscellaneous areas.

ESTIMATED QUANTITIES:
    DEMOLITION & SALVAGE     1 L.S.
    ROOF REPLACEMENT     5,000 S.F.
    CONCRETE WORK     1,200 S.F.
    MASONRY WORK     1 L.S.
    WOOD WORK & REPAIR     1 L.S.
    PUMP HOUSE REBUILD     1 L.S.
    CLEANING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MONTGOMERY -- PROJECT # 17-04-69-02                11/15/2018                Large Project Letting
VIKING LAKE STATE PARK
OFFICE & SHOP BUILDING (REBID)
Proposal Guarantee: $50,000
Completion Date: 9/27/2019

   This project consists of the construction of a one story, pre-engineered structural insulated panel (SIP) building with standing seam metal roofing and cement board siding, approximately 45' x 80', including two heated bays, a mechanical/electrical room, one restroom, a conference room, open office area and a storage room with a new fuel tank and pad as shown. The work also includes concrete and class "A" crushed stone paving, concrete paving, demolition of existing buildings, septic sewer, water and electrical services. Also, the contractor shall erect a 40' x 80' post-frame storage building with loft shall be on site.

ESTIMATED QUANTITIES:
    REMOVAL OF EXISTING ACC PAVEMENT     291.5 S.Y.
    TREE CLEARING AND GRUBBING     1 L.S.
    FULL DEPTH SAW CUT     138 L.F.
    GRADING     1 L.S.
    SEEDING, FERTILIZING, AND MULCHING     1 L.S.
    8" FILTER SOCK     160 L.F.
    WILKINSON PRECAST 1250 GALLON SEPTIC TANK (OR EQUIVALENT)     1 L.S.
    ORENCO EFFLUENT FILTER MODEL #FTS0444-36V (OR EQUIVALENT)     1 L.S.
    TUF-TITE MODEL #6HD2 DISTRIBUTION BOX (OR EQUIVALENT)     1 L.S.
    4" SANITARY SEWER SERVICE (PVC SDR 35)     134 L.F.
    4" 45 DEGREE BENDS (PVC SDR 35)     8 Each
    QUICK4 STANDARD CHAMBERS (4' LENGTHS)     36 Each
    QUICK4 MULTIPORT END CAPS     8 Each
    4" SCHEDULE 40 (2 LF) W/ COVERS & COUPLING RINGS     5 Each
    SANITARY SEWER SERVICE CLEANOUTS     1 Each
    12" RCP CLASS III     48 L.F.
    12" RCP CLASS III FES     2 Each
    1.5" TYPE "K" COPPER WATER SERVICE     56 L.F.
    2x2x1.5 TAPPING TEE     1 Each
    1.5" CURB STOP     1 Each
    3/4" LP SERVICE LINE     60 L.F.
    CLASS "A" CRUSHED STONE     297 Tons
    ELECTRICAL SERVICE (SERVICE TO BUILDING ONLY)     1 L.S.
    BLACK PVC COATED CHAIN LINK FENCING     244 L.F.
    BLACK PVC COATED CHAIN LINK FENCING 16' SWING GATE     2 Each
    OFFICE/SHOP BUILDING (INCLUDE MECHANICAL & ELECTRICAL ITEMS)     1 L.S.
    LP TANK & PAD     1 L.S.
    FUEL TANK & PAD     1 L.S.
    NPDES GENERAL PERMIT #2     1 L.S.
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.
    STORAGE BUILDING     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MUSCATINE -- PROJECT # 16-06-70-04                11/15/2018                Large Project Letting
FAIRPORT STATE RECREATION AREA
CRACK SEALING AND SLURRY SEAL - REBID
Proposal Guarantee: $2,000
Completion Date: 9/30/2019

   This project includes cleaning out and sealing cracks and providing an asphalt slurry seal on roads within Fairport state recreation area campground in Muscatine county, IA. Also includes minor asphalt pavement removal and replacement. Construction per Iowa Urban Design and Specifications (SUDAS).

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Crack Sealing     3,000 L.F.
    Slurry Seal     10,650 S.Y.
    HMA Remove and Replace. 4" depth on 6" granular     72 S.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POTTAWATTAMIE -- PROJECT # 17-04-78-06                11/15/2018                Large Project Letting
WILSON ISLAND STATE RECREATION AREA
PAVEMENT REPAIR - REBID
Proposal Guarantee: $25,000
Completion Date: 9/30/2019

   This project consists of a bituminous fog seal, patching, painted symbols, longitudinal and transverse joint repair and crack and joint cleaning and filling (pavement maintenance).

ESTIMATED QUANTITIES:
    2102 - SPECIAL BACKFILL     192 Tons
    2102 - EXCAVATION, CLASS 10, ROADWAY AND BORROW     161 C.Y.
    2303 - HOT MIX ASPHALT MIXTURE, COMMERCIAL MIX (INCLUDES ASPHALT BINDER), AS PER PLAN     144 Tons
    2306 - BITUMINOUS FOG SEAL (HMA PAVEMENT)     4,068 GAL.
    2518 - SAFETY CLOSURE     10 Each
    2527 - PAINTED SYMBOLS AND LEGENDS, HIGH-BUILD WATERBORNE. STOP BARS     10 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.
    2540 - LONGITUDINAL JOINT REPAIR     485 L.F.
    2543 - TRANSVERSE JOINT REPAIR     180 Tons
    2544 - CRACK AND JOINT CLEANING AND SEALING (PAVEMENT MAINTENANCE)     3.9 MI.
    2544 - HOT MIX ASPHALT FOR CRACK FILLING     1.5 Tons
    2544 - SEALER MATERIAL (PAVEMENT MAINTENANCE)     1,950 GAL.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SAC -- PROJECT # 18-01-81-07                11/15/2018                Large Project Letting
GRANT PARK
ENHANCEMENT PROJECT REBID
Proposal Guarantee: $12,500
Completion Date: 9/30/2019

   This project consists of installing streambank stabilization and a portland cement concrete boat ramp on the North Raccoon River, located in Sac County, Iowa and includes grading, placing riprap along river banks, installing toe wood for streambank stabilization, installing rock vanes and J-hooks, and installing a reinforced portland cement concrete boat ramp onto the North Raccoon River.

ESTIMATED QUANTITIES:
    TOE WOOD BANK STABILIZATION     3,000 Units
    BANK SHAPING FOR TOE WOOD CONSTRUCTION     1,900 C.Y.
    3'x3'x3' WEIR STONE, 2.5 MINIMUM SPECIFIC GRAVITY     170 Each
    CLASS ‘B’ RIPRAP     700 Tons
    6-INCH REINFORCED PCC PAVEMENT     33.4 S.Y.
    REINFORCED PCC BOAT RAMP PUSH-IN SLAB     40 S.Y.
    CLASS ‘A’ CRUSHED STONE     50 Tons
    CLASS ‘D’ RIPRAP     100 Tons
    700 GRAM COIR EROSION FABRIC     11,000 S.F.
    MACADAM STONE     11.7 Tons
    SURFACE RESTORATION     1 L.S.
    NPDES GENERAL PERMIT #2     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SCOTT -- PROJECT # 17-06-82-01                11/15/2018                Large Project Letting
WEST LAKE COMPLEX
WATERSHED IMPROVEMENTS
Proposal Guarantee: $37,500
Completion Date: 11/15/2019

   This project consists of constructing three sediment ponds, rehabilitating two existing sediment ponds, pedestrian trail construction, bioswale construction, and stream mitigation work.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clearing and Grubbing     1 L.S.
    Handling of Water     1 L.S.
    Erosion Control (SWPPP)     1 L.S.
    Seeding - Grass Seed Mix     5.4 Acres
Ponds 
    Earthen Embankment     32,709 C.Y.
    Excavation     13,961 C.Y.
    24" HDPE Pipe     561 L.F.
    24" Flared End Section     4 Each
    Unformed Concrete     38 C.Y.
    Class "C" Rock Riprap     852 Tons
    Class "E" Rock Riprap     41 Tons
    Formed Concrete     36 C.Y.
    Steel Reinforcement     3,866 LB.
    Metal Fabrication     50 L.F.
    Erosion Control Matting     13,991 S.Y.
    Existing Pipe Removal     160 L.F.
Bioswale 
    Excavation     141 C.Y.
    Class "E" Rock Riprap     50 Tons
    Formed Concrete     0.83 C.Y.
    Steel Reinforcement     57.3 LB.
    Turf Reinforcement Mat     235 S.F.
    Cobbles     2 C.Y.
    Erosion Control Matting     263 S.Y.
    Amended Soils     5 C.Y.
    Sand     7 C.Y.
    6" Slotted Wall PVC Pipe with Sock     45 L.F.
    6" Solid Wall PVC Pipe     61 L.F.
    Asphalt Repairs     7 S.Y.
    Plugs - Bioswale Bed Mix     400 Each
    Seeding - Bioswale Slope Mix     2,366 S.F.
Stream Mitigation 
    Excavation     5,796 C.Y.
    Class "E" Rock Riprap     265 Tons
    Erosion Control Matting     33,000 S.Y.
    Seeding - Grass Seed Mix     7.3 Acres
    Seeding - Floodplain Mix     1.2 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SHELBY -- PROJECT # 17-04-83-02                11/15/2018                Large Project Letting
PRAIRIE ROSE STATE PARK
PAVEMENT REPAIR-REBID
Proposal Guarantee: $25,000
Completion Date: 9/30/2019

   This project consists of a bituminous fog seal, slurry leveling, patching, transverse joint repair and cleaning and filling cracks for HMA surfaces.

ESTIMATED QUANTITIES:
 
    2306 - ASPHALT EMULSION FOR FOG SEAL (PAVEMENT)     1,354 GAL.
    2319 - SLURRY LEVELING     4.6 MI.
    2319 - ASPHALT EMULSION FOR SLURRY LEVELING, SLURRY WEDGE, AND SLURRY TREATMENT     1,610 GAL.
    2518 - SAFETY CLOSURE     3 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2529 - PATCHES, FULL-DEPTH FINISH, BY AREA. 5" HMA     196 S.Y.
    2529 - PATCHES, FULL-DEPTH FINISH, 5-IN., BY COUNT, HMA     12 Each
    2533 - MOBILIZATION     1 L.S.
    2543 - TRANSVERSE JOINT REPAIR     116 Tons
    2544 - CRACK AND JOINT CLEANING AND SEALING (HMA SURFACES)     4.6 MI.
    2544 - HOT MIX ASPHALT FOR CRACK FILLING     1 Tons
    2544 - SEALER MATERIAL (HMA SURFACES)     2,300 GAL.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




STORY -- PROJECT # 16-02-85-05                11/15/2018                Large Project Letting
HICKORY GROVE LAKE
MECHANICAL DREDGING & SHORELINE ARMORING
Proposal Guarantee: $175,000
Completion Date: 4/30/2020

   This project consists of mechanically dredging portions of the lake, placing fish habitat, constructing two boat ramps, and armoring the shoreline.

ESTIMATED QUANTITIES:
    24" Dia CMP     418 L.F.
    3/8" Minus Crushed Stone     6 Tons
    30" Dia CMP     45 L.F.
    36" Dia. CMP     76 L.F.
    5" PCC     84 S.Y.
    6" PCC     4,530 S.Y.
    8" Dia CMP     53 L.F.
    942 Draw Down     2 Each
    Class 10 Excavation (Embankment)     73,279 C.Y.
    Class 10 Excavation (Waste)     21,979 C.Y.
    Class A Crushed Stone     84 Tons
    Class D Revetment     266 Tons
    Class D Revetment - Linear Mounds - Labor Only     1,300 Tons
    Class D Revetment - Salvaged Rock - Labor Only     660 Tons
    Class E Revetment     13,688.6 Tons
    Clearing and Grubbing     3.38 Acres
    Compaction with Moisture and Density Control     29,109 C.Y.
    Concrete Testing     1 L.S.
    Construction Staking     1 L.S.
    Dewatering     1 L.S.
    Dock Abutment     4 Each
    Engineering Fabric     1,900 S.Y.
    Flexamat     962 L.F.
    Handicap Signs     5 Each
    In-Lake Access     1 L.S.
    M&D Testing     1 L.S.
    Mobilization     1 L.S.
    Mulch Sock     7,116 L.F.
    Parking Bumpers     10 Each
    Pavement Removal     1,946 S.Y.
    Pavement Striping     1,584 L.F.
    Pedestrian Trail Bridge - 10' x 100'     1 Each
    Porous Backfill - Pea Gravel - Labor Only     240 Tons
    Precast Concrete Bridge Abutment System     2 Each
    Seeding - Native Grass     12 Acres
    Seeding - Stabilization Crop     13.8 Acres
    Service Vehicle Sign     1 Each
    Site Restoration     1 L.S.
    Special Backfill     1,796 Tons
    Structural Concrete     788 S.Y.
    Swale w/Intake and Tile     1 L.S.
    Traffic Control     1 L.S.
    Woody Debris Removal     1 L.S.
Alternate 1 
Alternate
    Class 10 Excavation (Waste)     42,382 C.Y.
Alternate 2 
Alternate
    Class 10 Excavation (Waste)     11,215 C.Y.
Alternate 3 
Alternate
    Class A Crushed Stone     362 Tons
Alternate
    24" Dia CMP     40 L.F.
Alternate
    Class D Revetment     15 Tons
Alternate
    Engineering Fabric     25 S.Y.
Alternate
    Canoe Access     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




STORY -- PROJECT # 18-02-85-03                11/15/2018                Large Project Letting
STATE FORREST NURSERY
IRRIGATION SYSTEM
Proposal Guarantee: $12,500
Completion Date: 5/30/2019

   This project consists of installing roughly 2600 LF. of PVC water main along with 765 LF of the feeder pipe. Also to improve the efficiency of the system, low friction PVC pipe will be used with multiple new gate valves for a better control of the system.

ESTIMATED QUANTITIES:
 
    MOBILIZATION     1 L.S.
    6" CI GATE VALVES     3 Each
    CONNECT 6" PVC WITH 8" CI PIPE AT PUMP HOUSE     1 L.S.
    6" CI GATE VALVES WITH VALVE BOX & STEM EXTENSION     2 Each
    4" CI GATE VALVES WITH VALVE BOX & STEM EXTENSION     1 Each
    2" PLUG VALVES WITH VALVE BOX & STEM EXTENSION     1 Each
    6" PVC DR 25 C900 PVC PIPE     2,077 L.F.
    4" PVC DR 25 C900 PVC PIPE     569 L.F.
    2" PVC DR 25 C900 PVC PIPE     765 L.F.
    6"x 6"x 2" Ts INSTALLED     17 Each
    6" X 6" X 2" X 2" CROSS     12 Each
    4" X 4" X 2" X 2" CROSS     5 Each
    4" X 4" X 2" Ts INSTALLED     5 Each
    CONNECT 2" DRAIN LINE TO MANHOLE     1 Each
    SITE RESTORATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




UNION -- PROJECT # 17-04-88-06                11/15/2018                Large Project Letting
GREEN VALLEY STATE PARK
PAVEMENT REPAIR REBID
Proposal Guarantee: $6,250
Completion Date: 9/30/2019

   This project consists of a bituminous fog seal, patching, transverse joint repair and cleaning and filling cracks (pavement maintenance) and associated miscellaneous work.

ESTIMATED QUANTITIES:
    2102 - SPECIAL BACKFILL     28 Tons
    2102 - EXCAVATION, CLASS 10, ROADWAY AND BORROW     15 C.Y.
    2306 - ASPHALT EMULSION FOR FOG SEAL (PAVEMENT)     709 GAL.
    2518 - SAFETY CLOSURE     12 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2528 - FLAGGERS     10 Each
    2528 - PILOT CARS     5 Each
    2529 - PATCHES, FULL-DEPTH FINISH, BY AREA. 5" HMA     215 S.Y.
    2529 - PATCHES, FULL-DEPTH FINISH, 5-IN., BY COUNT, HMA     5 Each
    2533 - MOBILIZATION     1 L.S.
    2541 - CRACK AND JOINT CLEANING AND SEALING (HMA SURFACES)     2.3 MI.
    2541 - SEALER MATERIAL (HMA SURFACES)     805 LB.
    2543 - TRANSVERSE JOINT REPAIR     66 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




VAN BUREN -- PROJECT # 18-06-89-01                11/15/2018                Large Project Letting
LACEY-KEOSAUQUA STATE PARK
CAMPGROUND ROAD SEAL COAT
Proposal Guarantee: $12,500
Completion Date: 6/30/2019

   This project consists of placing a double seal coat on all existing HMA roads in the campground.

ESTIMATED QUANTITIES:
    1/2" Crushed Stone     269 Tons
    Binder Bitumen     6,113 GAL.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.
Alternate 1 
Alternate
    Full Depth HMA Patch, By Count     1 Each
Alternate
    Full Depth HMA Patch, By Area     64 S.Y.
Alternate
    15" Dia. CMP     50 L.F.
Alternate
    CMP Apron     2 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WOODBURY -- PROJECT # 19-01-97-01                11/15/2018                Large Project Letting
STONE STATE PARK
D1FY19-3 LODGE & SHELTER REPAIRS
Proposal Guarantee: $6,250
Completion Date: 5/31/2019

   The Contractor shall make repairs on the lodge and Calumet shelter. One of the lodge's chimneys is leaking and in need of a cap to mitigate the water. Also, siding on the rear of the building is rotten and needing replacement. The shelter's columns are rotten and in need of repair, they will be cut and placed on a new stone plinth. Also, the restroom siding is rotten and in need of replacement. As an alternate, the south entry portal shall be repointed, cleaned and restored.

ESTIMATED QUANTITIES:
 
    DEMOLITION & SALVAGE     1 L.S.
    LODGE REPAIR     1 L.S.
    SHELTER REPAIR     1 L.S.
    MOBILIZATION     1 L.S.
Alternate
    PORTAL REPAIR     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 18-01-30-06                10/25/2018                Small Project Letting
GULL POINT STATE PARK
ENTRY PORTAL REPAIR (D1FY19-10)
Proposal Guarantee: $0
Completion Date: 5/31/2019

   The Contractor shall remove all existing wood timbers of the Gull Point State Park Entry Portal Gates. The strapping associated with the timbers shall be salvaged and used in the new gates. New 12" diameter timbers will be install in the same configuration as the originals and the salvaged hardware reinstalled. The contractor will stain the timbers and finish the gates then clean the stone monument.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




MONONA -- PROJECT # 19-01-67-01                11/1/2018                Small Project Letting
LEWIS AND CLARK STATE PARK
BOAT RAMP PIT LATRINE
Proposal Guarantee: $0
Completion Date: 5/24/2019

   This project is designed provide a new pit vault latrine at the boat ramp parking area of Lewis & Clark State Park in Monona County, Iowa. Work under this project includes supply and setting of an "Iowa Standard" single precast concrete pit latrine. Other work included in the contract would be excavation for the building, dewatering, installation of granular base material, and a connecting PCC sidewalk with detectable warning panels.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




WARREN -- PROJECT # 18-05-91-05                11/1/2018                Small Project Letting
LAKE AHQUABI STATE PARK
PARKING FOR BOAT RAMP IN CAMPGROUND
Proposal Guarantee: $0
Completion Date: 4/30/2019

   This project consists of constructing a concrete parking lot for 5 vehicles with boat trailers. Parking area is 366 SY.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




BOONE -- PROJECT # 19-02-08-01                11/8/2018                Small Project Letting
BOONE RESEARCH STATION
ATTIC INSULATION
Proposal Guarantee: $0
Completion Date: 12/31/2018

   This project consists of adding 10" of loose fill fiberglass insulation to the attic of the Boone Research Station, and incidental items as required.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




BUTLER -- PROJECT # 19-03-12-02                11/15/2018                Small Project Letting
LOWER WEST FORK WILDLIFE AREA
WOOD TURTLE HABITAT
Proposal Guarantee: $0
Completion Date: 3/31/2019

   Project consists of excavating 7 shallow water ponds and using the excavated material to construct 6 habitat mounds on the Lower West Fork Wildlife Area in Butler Co., Iowa. Proposal may be obtained by e-mailing Melvin.pacovsky@dnr.iowa.gov your name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov