PROJECTS LETTING -  October , 2025

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

CERRO GORDO 23-03-17-11 Clear Lake State Park - Beach Side Restroom Repairs-2025-10-23   Bid Completion detail
GUTHRIE 25-04-39-04 Springbrook State Park - Education Center Electrical Demo-2025-10-23   Bid Completion detail
HARDIN 24-02-42-01 Pine Lake State Park - Parking Improvements-2025-10-23   Bid Completion detail
CLAYTON 26-03-22-03 Pikes Peak - Roofing replacements-2025-11-06   Bid Completion detail
DELAWARE 24-03-28-02 Manchester Fisheries Management Unit - Spring Branch 319 Project-2025-11-13   Bid Completion detail
TAYLOR 26-04-87-01 Lake of Three Fires - SOH Demolition -2025-11-13   Bid Completion detail
TAYLOR 26-04-87-02 Lake of Three Fires - cabin window replacement-2025-11-13   Bid Completion detail
CERRO GORDO 23-03-17-10 Clear Lake State Park - East Restroom and Shower Building-2025-11-20   Bid Completion detail
CERRO GORDO 23-03-17-13 Clear Lake State Park - Lodge Repairs REBID-2025-11-20   Bid Completion detail
CLAYTON 20-03-22-02 Pikes Peak State Park - Office Road Pavement Rehabilitation-2025-11-20   Bid Completion detail
FREMONT 24-05-36-01 Waubonsie State Park - Waubonsie Water Supply Improvement-2025-11-20   Bid Completion detail
JOHNSON 25-06-52-04 Hawkeye Wildlife Management Area - Swan Lake Road & James Avenue Road Maintenance Phase 3-2025-11-20   Bid Completion detail
POLK 25-05-77-03 Easter Lake - Shoreline Stabilization-2025-11-20   Bid Completion detail
WARREN 26-05-91-01 Banner Lakes At Summerset State Park - Banner Shooting Range Septic System -2025-11-20   Bid Completion detail




GUTHRIE -- PROJECT # 25-04-39-04                10/23/2025                Large Project Letting
SPRINGBROOK STATE PARK
EDUCATION CENTER ELECTRICAL DEMO
Proposal Guarantee: $12,500
Completion Date: 4/24/2026

   This project includes the demolition of electrical equipment at the conservation education center at Springbrook State Park. It also includes the installation of conduit and feeders to reconnect wastewater lagoons and a storage building to a new electric service provided by the Guthrie County Regional Electric Cooperative. The education center consists of 5 buildings and will be completely demolished in the future.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Electrical Demolition     1 L.S.
    New Site Electrical, Lagoons - (3) CU #4 Feeders     11 L.F.
    New Site Electrical, Lagoons - (1) CU #8 Ground     11 L.F.
    New Site Electrical, Lagoons - (1) 1" SCH 40 PVC     11 L.F.
    18" x 18" Handhole     1 Each
    New Site Electrical, Storage - (3) AL 250MCM Feeders     45 L.F.
    New Site Electrical, Storage - (1) AL #4 Ground     45 L.F.
    New Site Electrical, Storage - (1) 2-1/2" SCH 40 PVC     45 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HARDIN -- PROJECT # 24-02-42-01                10/23/2025                Large Project Letting
PINE LAKE STATE PARK
PARKING IMPROVEMENTS
Proposal Guarantee: $12,500
Completion Date: 5/15/2026

   This project includes the construction of two PCC parking lots, a PCC patch, a gravel parking lot, and drainage tile. ADA sidewalk and parking spaces are also included.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Traffic Control      1 L.S.
    Construction Staking     1 L.S.
    Pavement Removal     803 S.Y.
    Hydrant Removal     1 L.S.
    Excavation, Class 10     159 C.Y.
    Special Backfill     57 Tons
    Cement Treated Subgrade, 12"     965 S.Y.
    Cement     38 Tons
    Reinforced Parking Lot, 6" PCC     938 S.Y.
    Precast Concrete Parking Wheel Stops      16 Each
    Painted Pavement Markings, High Build waterborne, Yellow     7.73 STA.
    ADA Handicap Parking Sign     3 Each
    Subdrain, 4" Perforated Plastic Pipe     520 L.F.
    Surface intake with bar guard, 5"     1 Each
    Subdrain outlet, DR-305     1 Each
    Full Depth Finish Patch, PCC, by count     1 Each
    Full Depth Finish Patch, PCC     36 S.Y.
    Macadam     156 Tons
    Granular Surfacing, Class 'A' Crushed Stone     166 Tons
    Reinforced Sidewalk, 6" PCC     68 S.Y.
    Relocate Park Sign     1 L.S.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CERRO GORDO -- PROJECT # 23-03-17-10                11/20/2025                Large Project Letting
CLEAR LAKE STATE PARK
EAST RESTROOM AND SHOWER BUILDING
Proposal Guarantee: $25,000
Completion Date: 5/15/2026

   This project will address maintenance and repair work needed on the East Restroom and Shower Building in the Clear Lake State Park Campgrounds. Exterior improvements and repairs include but may not be limited to new standing seam metal roof, sanding and refinishing of wood fascias, new aluminum soffits, replacement of door slabs and hardware, cleaning of concrete walk surfaces and split-faced block walls, removal and replacement of sealant joints in walk surface and at building perimeter, removal of drinking fountains and install of new bottle filler, new lighting and photoelectric sensors. Interior improvements and repairs include new epoxy flooring, replacement of vanity countertops and back splashes, replacement of over-mount lavatories, replacement of scald guards, replacement of grab bars, soap dispensers, mirrors, and hand dryers, cleaning and painting of all block walls, FRP wall covering in shower areas, repairing, cleaning and refinishing all wood wall and ceiling surfaces, replacement of toilets, urinals, shower units and plumbing components.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    SITE GRADING AND SEEDING     1 L.S.
    INTERIOR DEMOLITION AND PREP WORK     1 L.S.
    CONCRETE/ASPHALT DEMOLITION AND REMOVAL     1 L.S.
    CONCRETE SLAB AND SLAB POLYFOAM JACKING     1 L.S.
    CONCRETE CLEANING AND SEALING     1 L.S.
    CLEAN EXTERIOR SPLIT-FACED BLOCK AND SEAL     1 L.S.
    NEW SHOWER AND TOILET PARTITIONS     1 L.S.
    INTERIOR WOOD CEILING INFILL AT SKYLIGHTS     1 L.S.
    STANDING SEAM METAL ROOF, UNDERLAYMENT AND ACCESSORIES     1 L.S.
    GUTTERS AND DOWNSPOUTS     1 L.S.
    NEW ALUMINUM SOFFIT     220 S.F.
    PAINTING - EXTERIOR FASCIA     1 L.S.
    PAINTING - INTERIOR CMU WALLS     1 L.S.
    FRP LINING AT SHOWER STALLS AND HAND DRYERS LOCATIONS     1 L.S.
    PAINTING - INTERIOR CEILING STAINING AND SEALING     1 L.S.
    INTERIOR RESINOUS FLOORING AND BASE     1 L.S.
    NEW WALL VENTS AND LOUVERS     1 L.S.
    NEW COUNTERTOPS AND SIDE SPLASHES     1 L.S.
    NEW HAND DRYERS, DISPENSERS, AND MIRRORS     1 L.S.
    PLUMBING - ROUGH-IN     1 L.S.
    PLUMBING FIXTURES - TOILETS AND URINAL     1 L.S.
    LAVATORIES AND PLUMBING     1 L.S.
    ADA SHOWER STALLS     1 L.S.
    NEW SHOWER HEADS, CONTROLS, VALVES AND ACCESSORIES     1 L.S.
    ELECTRICAL - ROUGH-IN     1 L.S.
    LIGHTING FIXTURES AND SENSORS     1 L.S.
    NEW EXHAUST VENTILATION FANS AND SENSOR/TIMER     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CERRO GORDO -- PROJECT # 23-03-17-13                11/20/2025                Large Project Letting
CLEAR LAKE STATE PARK
LODGE REPAIRS REBID
Proposal Guarantee: $25,000
Completion Date: 6/24/2026

   This project, Clear Lake State Park Lodge Repairs, is located just East of the State Park Beach. The building was designed and constructed in the 1930's by the Civilian Conservation Corps. As such, it is historical in nature and renovation work must preserve structure and design elements as much as possible. The lodge renovation is one of 4 buildings being renovated in 2025-2026 at Clear Lake State Park. The lodge improvements include new resinous flooring in restroom, new restroom fixtures and partitions, restroom remodel to meet ADA compliance requirements, cob blasting and re-finishing existing woodwork, new thermally efficient windows, repaired trim work, replacement or repair of large timber structural members, re-purposing lighting fixtures to function as LED type lighting fixtures, new concrete pad for ADA compliant parking, removal of existing concrete slabs and replacement with new slabs, fireplace brick and chimney stone repairs, new roof gutter system, kitchen renovation with new millwork and appliances, and installation of mini-split HVAC system. The contractor shall perform or responsibly supervise under sub-contract the following trades: Millwork, Mechanical, Electrical, Plumbing, Masonry, Carpentry, Concrete, Flooring, Windows, Roofing, Painting/Staining.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    CONCRETE DEMO - CUTTING/REMOVAL/DISPOSAL     650 S.F.
    CONCRETE NEW - GRANULAR BASE/REINFORCEMENT/FORMING/FINISHING     1,200 S.F.
    CONCRETE ACCESSORIES - EMBEDDED ITEMS/ADA SIGNAGE AND STRIPING     1 L.S.
    MASONRY - FIREPLACE/FIREBRICK REPAIR, CLEANING AND TUCKPOINTING     1 L.S.
    MASONRY - STONE CLEANING AND TUCKPOINTING     1 L.S.
    WOOD - TIMBER REPLACEMENT/STAINING/LACQUER/POLYURETHANE     1 L.S.
    WOOD - TIMBER AND WOOD COBB BLASTING/LACQUER/POLYURETHANE     1 L.S.
    THERMAL AND MOISTURE - GUTTERS     220 L.F.
    THERMAL AND MOISTURE - DOWNSPOUTS AND SUB-GRADE DRAINAGE     1 L.S.
    OPENINGS - REPLACEMENT WINDOWS - MATERIALS     1 L.S.
    OPENINGS - REPLACEMENT WINDOWS INSTALL/WOOD WINDOW TRIMS     1 L.S.
    OPENINGS - HARDWARE     1 L.S.
    FINISHES - RESINOUS FLOORING - FLOOR PREPARATION/CLEANING/SEALING     1,400 S.F.
    FINISHES - RESINOUS FLOORING - NEW FLOORING AND BASE INSTALL     265 S.F.
    FINISHES - INTERIOR WALL FRAMING/GYPSUM BOARD/FINISHING     1 L.S.
    FINISHES - INTERIOR WALL AND CEILING REPAIRS AND CLEANING     1 L.S.
    FINISHES - EXTERIOR WALL REPAIRS, CLEANING AND COATINGS     1 L.S.
    INTERIOR SPECIALTIES - TOILET PARTITIONS AND URINAL SCREEN     1 L.S.
    INTERIOR SPECIALTIES - RESTROOM ACCESSORIES     1 L.S.
    EQUIPMENT - KITCHEN APPLIANCES     1 L.S.
    FURNISHINGS - COUNTERTOPS     1 L.S.
    FURNISHINGS - WOOD CASEWORK     1 L.S.
    PLUMBING - PIPING, EQUIPMENT AND FIXTURES     1 L.S.
    HVAC - 3-HEAD MINI-SPLIT HEATING AND COOLING SYSTEM     1 L.S.
    ELECTRICAL - ROUGH-IN AND MATERIALS     1 L.S.
    ELECTRICAL - CEILING FANS, LIGHTING FIXTURES AND SWITCHES     1 L.S.
    EARTHWORK - GRADING AND SEEDING     1 L.S.
    EARTHWORK - STORMWATER CULVERT AND STONE BALLAST     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CLAYTON -- PROJECT # 20-03-22-02                11/20/2025                Large Project Letting
PIKES PEAK STATE PARK
OFFICE ROAD PAVEMENT REHABILITATION
Proposal Guarantee: $6,250
Completion Date: 9/18/2026

   This project includes rehabilitating the road serving the Pikes Peak State Park office and shop with HMA widenings, transverse joint repairs and double chip seal of approximately 1/4 mile of road pavement and two parking lots.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Traffic Control     1 L.S.
    Tree Removal, 24"-36" dia.      6 Each
    Culvert, 24" RCP     8 L.F.
    Transverse Joint Repairs     240 L.F.
    HMA Full Depth Patch     56 S.Y.
    Granular Subbase     212 Tons
    HMA Widening, 6" Depth     692 S.Y.
    Class A Road Stone     32 Tons
    Double Chip Seal     3,824 S.Y.
    Signage      1 L.S.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




FREMONT -- PROJECT # 24-05-36-01                11/20/2025                Large Project Letting
WAUBONSIE STATE PARK
WAUBONSIE WATER SUPPLY IMPROVEMENT
Proposal Guarantee: $25,000
Completion Date: 8/14/2026

   This project includes water supply improvements such as 3320 LF of 2" watermain, six service lines, two pressure reducing valves with vaults, removing five booster pump, installing six pressure tanks, replacing wellhouse piping, chemical upgrades, and control improvements.

ESTIMATED QUANTITIES:
    Water Main Connection/Caps, 2" - Detail B     1 L.S.
    Water Service Line/Main, trenched, 1", C901 IPS PE     160 L.F.
    Water Service Connections, 1"     2 Each
    Cap, 2"      1 Each
    Conventional Seeding, Fertilizing and Mulching     1 L.S.
    Water Main, trenched, 2", C901 IPS PE     125 L.F.
    Water Main, trenchless, 2", C901 IPS PE     3,195 L.F.
    Water Service Line/Main, trenched, 1", C901 IPS PE     40 L.F.
    Water Service Line/Main, trenchless, 1", C901 IPS PE     450 L.F.
    Water Service Line/Main, trenched, 3/4", C901 IPS PE     160 L.F.
    Connection to Existing, 2"     1 Each
    New service connect to existing     6 Each
    Gate Valve, 2"     4 Each
    Cut-in Tee and Hydrant Assembly     1 Each
    Flush Hydrant Assembly     1 Each
    Water Main Cap, 6", DI     1 Each
    Cap Cabin #9 Service Line     1 Each
    Conventional Seeding, Fertilizing and Mulching     1 L.S.
    West PRV Vault     1 L.S.
    East PRV Vault     1 L.S.
    Wellhouse - Demolition     1 L.S.
    Wellhouse - Process Piping and Valves     1 L.S.
    Wellhouse - Pressure Tanks     2 Each
    Wellhouse - Sodium Hypochlorite Feed/Eyewash/Shower     1 L.S.
    Wellhouse - Reservoir #1 Level Controller     1 L.S.
    Wellhouse - Ventilation System     1 L.S.
    Wellhouse - Electrical, Chemical Receptacle and Fan      1 L.S.
    Modern Showers Pressure Tanks     4 Each
    Washawtee Lodge PRV Installation     1 L.S.
    Maintenance Building PRV Installation     1 L.S.
    Booster Pump Demolition - Modern Showers #1     1 L.S.
    Booster Pump Demolition - Modern Restroom #1     1 L.S.
    Booster Pump Demolition - Cabin #1     1 L.S.
    Booster Pump Demolition - Cabin #2     1 L.S.
    Booster Pump Demolition - Cabin #3     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JOHNSON -- PROJECT # 25-06-52-04                11/20/2025                Large Project Letting
HAWKEYE WILDLIFE MANAGEMENT AREA
SWAN LAKE ROAD & JAMES AVENUE ROAD MAINTENANCE PHASE 3
Proposal Guarantee: $12,500
Completion Date: 6/30/2026

   This project includes replacing four CMP culverts and one plastic culvert with RCP culverts, improving a low water crossing, widening a s 200-ft section of road, minor grading, and removing two trees.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Traffic Control      1 L.S.
    Construction Staking     1 L.S.
    Reshaping Ditches     175 C.Y.
    Tree Removal     2 Each
    Remove Storm Sewer Pipe (36" Dia. or Less)     130 L.F.
    Remove Storm Sewer Pipe (greater Than 36")     35 L.F.
    Culvert, RCP Roadway, 18"     32 L.F.
    Apron, RCP, 18"     2 Each
    Culvert, RCP Roadway, 24"     40 L.F.
    Apron, RCP, 24"     2 Each
    Culvert, RCP Roadway, 30"     60 L.F.
    Apron, RCP, 30"     4 Each
    Culvert, RCP Roadway, 48"     36 L.F.
    Apron, RCP, 48"     2 Each
    Special Backfill     103 Tons
    Excavation, Class 10, Borrow Off-site     260 C.Y.
    Revetment, Class E     308 Tons
    Macadam Stone Base     218 Tons
    Granular Surfacing on Road, 1-1/2" Roadstone     119 Tons
    Road Signs     8 Each
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POLK -- PROJECT # 25-05-77-03                11/20/2025                Large Project Letting
EASTER LAKE
SHORELINE STABILIZATION
Proposal Guarantee: $50,000
Completion Date: 6/30/2026

   This project is an extension of the earlier renovation project. An additional 5076 LF of shoreline will be armored with riprap. Work on this project will be completed by barge to minimize disruption and restoration needs to the park.

ESTIMATED QUANTITIES:
    INSTALLATION AND REMOVAL OF STAGING AREA     1 L.S.
    REMOVAL OF SHARED USE PATH     30 S.Y.
    SHARED USE PATH, PCC, 6"      30 S.Y.
    SPECIAL SUBGRADE PREP FOR SHARED USE PATH     30 S.Y.
    HYDRAULIC SEEDING, SEEDING, FERTILIZING, AND MULCHING W/BFM - TYPE 3     0.1 Acres
    HYDRAULIC SEEDING W/PROVIDED SEED MIX, FERTILIZING, AND MULCHING W/BFM - SPECIAL SEEDING     0.5 Acres
    SWPPP PREPARATION     1 L.S.
    SWPPP MANAGEMENT     1 L.S.
    FILTER SOCK, 9"     750 L.F.
    FILTER SOCK REMOVAL      890 L.F.
    STABILIZED CONSTRUCTION EXIT     152 S.Y.
    SHORELINE TREATMENT, RIP RAP (CLASS E)      7,615 Tons
    MOBILIZATION     1 L.S.
    TEMPORARY TRAFFIC CONTROLS     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CERRO GORDO -- PROJECT # 23-03-17-11                10/23/2025                Small Project Letting
CLEAR LAKE STATE PARK
BEACH SIDE RESTROOM REPAIRS
Proposal Guarantee: $0
Completion Date: 5/15/2026

   This project will address maintenance and repair work needed on the Beach Side Restroom Building in the Clear Lake State Park Campgrounds. Exterior improvements and repairs include but may not be limited to new standing seam metal roof, sanding and refinishing of wood fascias, beams, columns and soffits, replacement of exterior door slabs and hardware, replacement of outdoor shower tower unit, cleaning of concrete walk surfaces and split-faced block walls, removal and replacement of sealant joints in walk surface and at building perimeter, removal of drinking fountain and install of new bottle filler, new lighting and photo sensor. Interior improvements and repairs include repair, cleaning and finishing of clay tile floors, replacement of vanity countertops and back splashes, replacement of over-mount lavatories, replacement of scald guards, replacement of grab bars, soap dispensers, mirrors, and hand dryers, cleaning and painting of all block walls, repairing, cleaning and refinishing all wood wall and ceiling surfaces, replacement of urinal and components.

Contact:
Brian Phipps
515-452-9438
brian.phipps@dnr.iowa.gov




CLAYTON -- PROJECT # 26-03-22-03                11/6/2025                Small Project Letting
PIKES PEAK
ROOFING REPLACEMENTS
Proposal Guarantee:
Completion Date: 5/15/2026

   Work consists of removing existing shingles on the store/shelter, restroom and kiosk and replacing with metal shakes. Gutters will be added to areas around the store front, shelter access and restrooms.

Contact:
Kenneth Howe
319-240-3553
Kenneth.howe@dnr.iowa.gov




DELAWARE -- PROJECT # 24-03-28-02                11/13/2025                Small Project Letting
MANCHESTER FISHERIES MANAGEMENT UNIT
SPRING BRANCH 319 PROJECT
Proposal Guarantee:
Completion Date: 4/30/2026

   Work consists of clearing and grubbing along stream and east of existing structure. Streambank reshaping and rock revetment. Removal of existing ag fence and installing new ag fence. Removing and installing new CMP. Grading for drainage.

Contact:
Kenneth Howe
319-240-3553
Kenneth.howe@dnr.iowa.gov




TAYLOR -- PROJECT # 26-04-87-01                11/13/2025                Small Project Letting
LAKE OF THREE FIRES
SOH DEMOLITION
Proposal Guarantee: $0
Completion Date: 5/13/2026

   The Ranger's house has been abandoned and the house, foundations, floors, and miscellaneous associated items need to be demolished and disposed of offsite. The contractor shall provide all materials, labor, and equipment necessary to complete this work as well as fill the foundation void with contractor-furnished soil placed and compacted to match surrounding ground. Send an email to request proposal form.

Contact:
Zach Gunsolley
515-250-3713
zach.gunsolley@dnr.iowa.gov




TAYLOR -- PROJECT # 26-04-87-02                11/13/2025                Small Project Letting
LAKE OF THREE FIRES
CABIN WINDOW REPLACEMENT
Proposal Guarantee: $0
Completion Date: 3/20/2026

   Replace all windows on the six (6) park cabins, total of 36 windows (6 per cabin with 1 in the kitchen, 1 in the bathroom, and 4 in the living area). Send an email to request proposal form.

Contact:
Zach Gunsolley
515-250-3713
zach.gunsolley@dnr.iowa.gov




WARREN -- PROJECT # 26-05-91-01                11/20/2025                Small Project Letting
BANNER LAKES AT SUMMERSET STATE PARK
BANNER SHOOTING RANGE SEPTIC SYSTEM
Proposal Guarantee: $0
Completion Date: 4/30/2026

   Remove or demolish existing 2000 gallon holding tank. Install a 1250 gallon septic tank and a 3-bedroom Planet Care enclosed system with pump for surface discharge. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov