PROJECTS LETTING -  October , 2016

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

MADISON 15-04-61-02 Badger Creek State Recreation Area - Sediment Basins-2016-10-20   Bid Completion detail
O'BRIEN 17-01-71-01 Great Lakes Wildlife Unit - Waterman Wetland / Tile Repair -2016-10-20   Bid Completion detail
UNION 15-04-88-02 Green Valley - Raise west silt dike-2016-10-20   Bid Completion detail
VAN BUREN 14-06-89-01 Lacey-Keosauqua State Park - Des Moines River Bank Armoring-2016-10-20   Bid Completion detail
CLAYTON 17-03-22-01 Pikes Peak State Park - House Removal & Asbestos Abatement-2016-10-27   Bid Completion detail
LEE 16-06-56-01 Prairie Resource Center - Greenhouse Replacement-2016-11-10   Bid Completion detail
RINGGOLD 17-04-80-01 Mount Ayr Fisheries Management Unit - Mt. Ayr Fish Hatchery waterline-2016-11-10   Bid Completion detail
RINGGOLD 17-04-80-02 Mount Ayr Fisheries Management Unit - Repair Fogle Lake jetties-2016-11-10   Bid Completion detail
UNION 17-04-88-02 Three Mile Lake - Shoreline Stabilization-2016-11-10   Bid Completion detail
JACKSON 15-06-49-01 Bellevue State Park - Lagoon Valve Replacement-2016-11-17   Bid Completion detail
JASPER 16-05-50-02 Rock Creek - ADA pathway to fishing pier-2016-11-17   Bid Completion detail
POLK 17-02-77-01 Big Creek - Grade Stabilization Structure-2016-11-17   Bid Completion detail




MADISON -- PROJECT # 15-04-61-02                10/20/2016                Large Project Letting
BADGER CREEK STATE RECREATION AREA
SEDIMENT BASINS
Proposal Guarantee: $10,000
Completion Date: 8/15/2017

   Construction of 5 sediment basins and other incidental work as required by the IDNR construction inspector.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    6" DIA. SMOOTH METAL PIPE     802 L.F.
    6" DIA. DUAL WALL PE CONDUIT     216 L.F.
    8" DIA. DUAL WALL PE CONDUIT     204 L.F.
    6" DIA. PERFORATED STAND PIPE     16 L.F.
    TRASH RACK / BAR GUARD ASMBLY (6")     3 Each
    4'X4'x1/4" ANTISEEP     6 Each
    5'X5'x1/4" ANTISEEP     7 Each
    6" GATE VALVE     1 Each
    EARTHWORK/FILL/GRADE/STRIPPING     46,563 C.Y.
    CORE TRENCH     2,310 C.Y.
    SEED & MULCH     3 Acres
    CLEARING & GRUBBING     11 Acres
    ANIMAL GUARD     1 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




UNION -- PROJECT # 15-04-88-02                10/20/2016                Large Project Letting
GREEN VALLEY
RAISE WEST SILT DIKE
Proposal Guarantee: $10,000
Completion Date: 6/1/2017

   The project involves modifying the West silt Dike and stabilizing the North silt dike at Green Valley State Park, Union Co. IA

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    CLASS E REVETMENT     2,866 Tons
    ROCK REMOVAL     511 C.Y.
    MACADAM STONE     182 Tons
    48" DIA. CMP     300 L.F.
    1 1/2" MINUS CHOKE STONE     438 Tons
    SEEDING, FERTILIZING AND MULCHING     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




UNION -- PROJECT # 17-04-88-02                11/10/2016                Large Project Letting
THREE MILE LAKE
SHORELINE STABILIZATION
Proposal Guarantee: $30,000
Completion Date: 5/1/2017

   This project consists of minor shoreline shaping and armoring.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Class E Revetment     6,500 Tons
    Shoreline Deepening     900 L.F.
    Engineering Fabric     1,260 S.Y.
    Access Route     1 L.S.
    Site Restoration     1 L.S.
Alternate #1 
Alternate
    Class E Revetment     1,439 Tons
Alternate
    Shoreline Deepening     400 L.F.
Alternate
    Engineering Fabric     560 S.Y.
Alternate
    Access Route     1 L.S.
Alternate
    Site Restoration     1 L.S.
Alternate #2 
Alternate
    Class E Revetment     4,500 Tons
Alternate
    Shoreline Deepening     3,000 L.F.
Alternate
    Engineering Fabric     4,200 S.Y.
Alternate
    Access Route     1 L.S.
Alternate
    Site Restoration     1 L.S.
Alternate #3 
Alternate
    Class E Revetment     525 Tons
Alternate
    Access Route     1 L.S.
Alternate
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




O'BRIEN -- PROJECT # 17-01-71-01                10/20/2016                Small Project Letting
GREAT LAKES WILDLIFE UNIT
WATERMAN WETLAND / TILE REPAIR
Proposal Guarantee: $0
Completion Date: 12/2/2016

   This project is designed to repair an existing tile break and excavate a core trench on an existing wetland dike to stop unwanted water flow from the basin. The project is located on Waterman Prairie in O'Brien County, Iowa. Work includes repair of an 8" HDPE tile, excavation of a 250' long x 10' wide core trench, fill and recompaction of the core area, and fill of the eroded hole caused by the tile break.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




VAN BUREN -- PROJECT # 14-06-89-01                10/20/2016                Small Project Letting
LACEY-KEOSAUQUA STATE PARK
DES MOINES RIVER BANK ARMORING
Proposal Guarantee: $0
Completion Date: 12/30/2016

   This project includes placing approximately 2,645 tons of revetment along the bank of the Des Moines River within Lacey-Keosauqua State Park at the Ely Ford historical marker.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




CLAYTON -- PROJECT # 17-03-22-01                10/27/2016                Small Project Letting
PIKES PEAK STATE PARK
HOUSE REMOVAL & ASBESTOS ABATEMENT
Proposal Guarantee: $0
Completion Date: 12/23/2017

   Project consists of asbestos abatement, house demolition and disposal, removal and disposal of block wall, steps, and trees along roadway located at Pikes Peak State Park, 112 Pt. Anne Ln., McGregor, Iowa. Proposal & plan may be obtained by emailing name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




LEE -- PROJECT # 16-06-56-01                11/10/2016                Small Project Letting
PRAIRIE RESOURCE CENTER
GREENHOUSE REPLACEMENT
Proposal Guarantee: $0
Completion Date: 5/31/2017

   This project consists of replacing a damaged greenhouse with a new greenhouse (30' x 96') including all necessary demolition, building construction, heaters, fans and miscellaneous items.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




RINGGOLD -- PROJECT # 17-04-80-01                11/10/2016                Small Project Letting
MOUNT AYR FISHERIES MANAGEMENT UNIT
MT. AYR FISH HATCHERY WATERLINE
Proposal Guarantee: $0
Completion Date: 4/1/2017

   Replace water mains and valves at the Mount Ayr Hatchery. Seeding of all disturbed areas required. Proposal & plan may be obtained by emailing name, address, and phone number.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




RINGGOLD -- PROJECT # 17-04-80-02                11/10/2016                Small Project Letting
MOUNT AYR FISHERIES MANAGEMENT UNIT
REPAIR FOGLE LAKE JETTIES
Proposal Guarantee: $0
Completion Date: 4/1/2017

   Repair 3 fishing jetties by adding riprap to the waterline area and add new surfacing to the tops. Seeding of all disturbed areas required. Proposal & plan may be obtained by emailing name, address, and phone number.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




JACKSON -- PROJECT # 15-06-49-01                11/17/2016                Small Project Letting
BELLEVUE STATE PARK
LAGOON VALVE REPLACEMENT
Proposal Guarantee: $0
Completion Date: 12/23/2016

   Project includes replacing four lagoon outlet knife gate valves with 6" eccentric plug valves.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




JASPER -- PROJECT # 16-05-50-02                11/17/2016                Small Project Letting
ROCK CREEK
ADA PATHWAY TO FISHING PIER
Proposal Guarantee: $0
Completion Date: 4/30/2017

   This project consists of concrete pumping to construct a concrete walkway to the ADA fishing pier at Rock Creek State park. Also placement of riprap and pumping revetment grout. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




POLK -- PROJECT # 17-02-77-01                11/17/2016                Small Project Letting
BIG CREEK
GRADE STABILIZATION STRUCTURE
Proposal Guarantee: $0
Completion Date: 8/15/2017

   This project consists of constructing an earthen embankment with a CMP principal spillway.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov