PROJECTS LETTING -  October , 2011

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

POLK 12-02-77-07 Big Creek State Park - Replace Siding at Office-Shop Building-2011-10-17   Bid Completion detail
JACKSON 11-06-49-02 Bellevue State Park - Interpretive Shelter and Panels-2011-10-20   Bid Completion detail
JASPER 10-05-50-04 Rock Creek State Park - dump station replacement(duplicate)-2011-10-20   Bid Completion detail
RINGGOLD 12-04-80-02 Mt Ay rFish Hatchery - Replace Pond 2 Harvest Kettle-2011-10-20   Bid Completion detail
WORTH 12-03-98-01 Silver Lake WMA - Renov/replace outlet add drainp-2011-10-20   Bid Completion detail
WASHINGTON 10-06-92-05 Lake Darling State Park - Campground Grading and Utilities-2011-10-25   Bid Completion detail
HUMBOLDT 11-02-46-01 Willows Wildlife Area - 2010 Flood FEMA-2011-10-27   Bid Completion detail
POLK 12-02-77-08 Big Creek State Park - Repair Multiuse Trail-2011-10-27   Bid Completion detail
WARREN 11-05-91-08 Lake Ahquabi - demo / utility installation-2011-11-03   Bid Completion detail
BLACK HAWK 11-03-07-01 George Wyth State Park - RM & RP 3-18" Road Culverts-2011-11-10   Bid Completion detail
DAVIS 12-05-26-01 Lake Wapello State Park - Wood Fueled Central Boiler System-2011-11-10   Bid Completion detail




JASPER -- PROJECT # 10-05-50-04                10/20/2011                Large Project Letting
ROCK CREEK STATE PARK
DUMP STATION REPLACEMENT(DUPLICATE)
Proposal Guarantee: $5,000
Completion Date: 4/30/2012

   This project consists of the removal of the existing RV dump station at Rock Creek State Park. The old dump station will be replaced with two new disposal stations. The installation and construction of the new disposal stations will involve the trenching, laying, and connection of new water, sanitary sewer, and storm sewer lines. The existing roadway surrounding the dump station will be removed and regraded to allow for proper drainage. A rain garden will be installed to collect rainwater runoff. The roadway will then be paved with concrete. Project will also include any incidental work as required by plans and/or DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Class 13 Excavation     233 C.Y.
    4" PVC Sanitary Pipe     56 L.F.
    Connection to Existing Sewer     1 Each
    SS Manhole     1 Each
    Holding Tank     1 Each
    RV Dump Station     2 Each
    8" Storm Sewer PVC     161 L.F.
    Single Grate Storm Intake     1 Each
    Single Grate Storm Intake w/Manhole     1 Each
    24" Diam. Storm Surface Intake     2 Each
    1" HDPE Water     134 L.F.
    Connect to Existing Water     1 Each
    System Disinfection     1 L.S.
    New Concrete Paving, 6"     1,303.37 S.Y.
    Curb and Gutter     513 L.F.
    Base, 6" Special Backfill     430 Tons
    2" Ball Valve     1 Each
    Locate and Cap Existing Water     1 L.S.
    2" x 1" Tee     4 Each
    Seeding, Fertilizing, Mulch     1 L.S.
    4" Sch. 40 PVC in Rain Garden     1 L.S.
    Removals, as per Plan     1 L.S.
    Mobilization     1 L.S.
    Traffic Control     1 L.S.
    Seeding, Fertilizing, Mulch, Rain Garden     1 L.S.
    Rain Garden Construction     1 L.S.
    2" Water Pipe     73 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WORTH -- PROJECT # 12-03-98-01                10/20/2011                Large Project Letting
SILVER LAKE WMA
RENOV/REPLACE OUTLET ADD DRAINP
Proposal Guarantee: $9,000
Completion Date: 6/1/2012

   The Silver Lake project shall consist of replacing the existing concrete spillway with precast reinforced concrete box culverts (RCBC) and stop logs. The lake will be drained by excavating an 800-foot long channel into the lake from the existing spillway location. The outlet channel shall also be excavated to accommodate a new water control structure (WCS). The WCS includes a steel catwalk, an aluminum fish barrier, stop logs and chain link fencing. A 100-foot long emergency spillway will also be constructed, consisting of an earthen berm armored with geotextile and revetment stone. The project also consists of installing corrugated metal pipe culverts and a precast RCBC culvert for field accesses over the discharge channel.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clearing & Grubbing      1 L.S.
    Discharge Channel Excavate & Level Spoil     500 C.Y.
    Existing Concrete Spillway Removal     1 L.S.
    Lake Channel Excavation 1,900 ft.     4,200 C.Y.
Precast RCBC Barrier/WCS 
    Class 10 Excavation     500 C.Y.
    12' x 4' Precast RCBC     12 L.F.
    12' x 6' Precast RCBC     24 L.F.
    12' x 8' Precast RCBC     24 L.F.
    12' x 10' Precast RCBC     36 L.F.
    Cutoff Walls      65.4 L.F.
    Granular Filter Diaphragm     50 Tons
    Aluminum Fish Barriers     665 LB.
    Aluminum Fish Barrier Rake     1 Each
    Concrete Weir Buttress Wall     12 L.F.
    Stop Log Weir Guides     575 LB.
    Stop Logs Aluminum     1,300 LB.
    Fish Barrier Portable Hoist Assembly     1 Each
    Steel Catwalk 48" Wide     2,100 LB.
    Steel Catwalk 36" Wide     1,930 LB.
    Stainless Steel Protective Screens      150 LB.
    8' Ht. Chainlink Fence & Gates     96 L.F.
    Imported Compacted Fill     800 C.Y.
    Class E Revetment     375 Tons
    Geotextile      1,000 S.Y.
    Geogrid     360 S.Y.
    1/2" Crushed Road Stone     100 Tons
 
    Class 10 Excavation      300 C.Y.
    Imported Compacted Fill     400 C.Y.
    Class E Revetment     120 Tons
    Geotextile      200 S.Y.
    Erosion Control Matting     100 SQ.
    Seeding, Fertilizing, & Mulching      1 Acres
Field Access Culvert (E. of W.C.S.) 
    10' x 5' Precast RCBC     24 L.F.
    10' x 5' Precast End Sections     2 Each
    Class E Revetment     40 Tons
    Geotextile      32 S.Y.
    1/2" Crushed Road Stone     50 Tons
 
    36" C.M.P. 14 GA.     96 L.F.
    36" C.M.P. End Sections     8 Each
    Geotextile      110 S.Y.
    1/2" Crushed Road Stone     50 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WASHINGTON -- PROJECT # 10-06-92-05                10/25/2011                Large Project Letting
LAKE DARLING STATE PARK
CAMPGROUND GRADING AND UTILITIES
Proposal Guarantee: $120,000
Completion Date: 5/1/2012

   Project consists of campground renovations at Lake Darling State Park. The renovations include providing a new water service to the Park and the campground, new sanitary service sewers, campground electrical services, and rough grading of the park campground sites. Water service includes new watermains from the Park entrance to the campgrounds, new yard and flushing hydrants, and services to two new shower buildings. Electrical services include providing new wiring and pedestals for electrical service to each campsite. New sanitary services will be provided to 16 campsites. Finally, the new campsite configuration will be rough graded to allow for future road and campsite resurfacing.

ESTIMATED QUANTITIES:
    NEW WATERMAIN: 4-INCH PVC     9,410 L.F.
    NEW WATERMAIN: 4-INCH PVC     1,635 L.F.
    NEW WATERMAIN: 1-1/2, 2 & 2-1/2 INCH PVC     4,100 L.F.
    NEW WATERMAIN: 1-INCH PVC     1,540 L.F.
    CONNECTION AT RURAL WATER METER VAULT     1 Each
    GATE VALVE WITH BOX: 3-INCH     4 Each
    GATE VALVE WITH BOX: 2-INCH     11 Each
    YARD HYDRANT ASSEMBLY, INCLUIDING CURB STOP AND BOX, YARD HYDRANT, DRAIN PIPING AND SPECIAL AGGERGATE     35 Each
    FLUSHING HYDRANT ASSEMBLY, INCLUDING SHUT OFF GATE VALVE     3 Each
    SYSTEM DRAIN MANHOLE, INCLUDING INTERIOR COMPONENTS     2 Each
    CORPORATION STOP AND SERIVCE SADDLE     35 Each
    SANITARY SEWER: 6-INCH PVC     1,263 L.F.
    SANITARY SEWER: 4-INCH PVC     330 L.F.
    NEW MANHOLE     8 Each
    NEW CLEANOUT     1 Each
    RECREATIONAL VEHICLE SANITARY SEWER CONNECTION ASSEMBLY     16 Each
    CAMPGROUND ROUGH GRADING     1 L.S.
    PAVEMENT REMOVAL     212 S.Y.
    SEDING AND FERTILIZE     1 L.S.
    MOBILIZATION     1 L.S.
    ELECTRICAL DEMOLITION     1 L.S.
    FREE STANDING METER STRUCTURES WITH METERING EQUIPMENT     5 Each
    DISTRIBUTION PANELS 1, 3, 4, 5     4 Each
    DISTRIBUTION PANEL 2     1 Each
    LOAD CENTER     1 Each
    CAMPSITE OUTLET POSTS     67 Each
    250kCMIL, TYPE USE     1,040 L.F.
    4/0 AWG, TYPE USE     6,300 L.F.
    3/0 AWG, TYPE USE     3,450 L.F.
    2/0 AWG, TYPE USE     3,790 L.F.
    1/0 AWG, TYPE USE     1,345 L.F.
    1 AWG, TYPE USE     5,350 L.F.
    2 AWG, TYPE USE     2,080 L.F.
    4 AWG, TYPE USE     1,910 L.F.
    6 AWG, TYPE USE     970 L.F.
    10 AWG, TYPE USE     2,090 L.F.
    12 AWG, TYPE XHHW     160 L.F.
    TRENCHING AND BACKFILLING WITH CAUTION TAPE     5,410 L.F.
    ROAD/CAMPSITE CROSSING CONDUIT 3" PVC     715 L.F.
    CONDUIT FOR UTILITY PRIMARY CONDUCTORS 2"     425 L.F.
    CONNECT TO EXISTING SHOWER BUILDINGS     2 Each
    CONNECT TO EXISTING PUMP POWER CONVERTER     1 Each
    CONNECT TO EXISTING POLE MOUNTED LIGHT FIXTURES     5 Each
    ELECTRICAL HAZARDS ANALYSIS, REPORT AND LABELING     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POLK -- PROJECT # 12-02-77-07                10/17/2011                Small Project Letting
BIG CREEK STATE PARK
REPLACE SIDING AT OFFICE-SHOP BUILDING
Proposal Guarantee:
Completion Date: 12/23/2011

   Steel siding replacement at office building.

Contact:
Don Labate
515-250-3714
[email protected]




JACKSON -- PROJECT # 11-06-49-02                10/20/2011                Small Project Letting
BELLEVUE STATE PARK
INTERPRETIVE SHELTER AND PANELS
Proposal Guarantee:
Completion Date: 3/30/2012

   BELLEVUE STATE PARK NELSON UNIT (north) BUILD FOUR-SIDED INTERPRETIVE KIOSK WITH A ROOF STRUCTURE. IN ADDITION TO THE KIOSK, REMOVE ORIGINAL BUTTERFLY GARDEN SIGN AND SET ON A NEW CONCRETE BASE WITH LIMESTONE BRICK FACING.

Contact:





RINGGOLD -- PROJECT # 12-04-80-02                10/20/2011                Small Project Letting
MT AY RFISH HATCHERY
REPLACE POND 2 HARVEST KETTLE
Proposal Guarantee:
Completion Date: 4/4/2012

   Replace the existing pond #2 fish harvest kettle and piping.

Contact:
Mark Johnson
515-250-3713
[email protected]




HUMBOLDT -- PROJECT # 11-02-46-01                10/27/2011                Small Project Letting
WILLOWS WILDLIFE AREA
2010 FLOOD FEMA
Proposal Guarantee:
Completion Date: 11/24/2011

   This project includes silt removal, tree removal, road bed grooming and the placement of Class A rock road surfacing at the Willows Wildlife area in Humboldt County.

Contact:
Don Labate
515-250-3714
[email protected]




POLK -- PROJECT # 12-02-77-08                10/27/2011                Small Project Letting
BIG CREEK STATE PARK
REPAIR MULTIUSE TRAIL
Proposal Guarantee:
Completion Date: 11/24/2011

   This project includes the repair of trail surfaces and placement of Class A road stone and riprap at the trail system on the west side of Big Creek State Park in Polk County.

Contact:
Don Labate
515-250-3714
[email protected]




WARREN -- PROJECT # 11-05-91-08                11/3/2011                Small Project Letting
LAKE AHQUABI
DEMO / UTILITY INSTALLATION
Proposal Guarantee:
Completion Date: 12/15/2011

   Project scope includes demolition of current shower building and a pit latrine. Further work involves preparation of a rock base and utility stub-ups for the future placement of a precast shower building, installed by others, as well as paving of sidewalks and a small parking area near the building site.

Contact:
Jason Kruse
(515) 250-3707
[email protected]




BLACK HAWK -- PROJECT # 11-03-07-01                11/10/2011                Small Project Letting
GEORGE WYTH STATE PARK
RM & RP 3-18" ROAD CULVERTS
Proposal Guarantee:
Completion Date: 12/9/2011

   Project consists of removal and disposal of AC surfacing & existing pipe culverts, furnishing & placing PC Concrete pipe & aprons, backfilling, and placing PCC pavement patch.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




DAVIS -- PROJECT # 12-05-26-01                11/10/2011                Small Project Letting
LAKE WAPELLO STATE PARK
WOOD FUELED CENTRAL BOILER SYSTEM
Proposal Guarantee: $0
Completion Date: 11/30/2011

   This project consists of installation of a wood burning boiler to provide heat for the office/shop. A concrete pad and sidewalk are to be included.

Contact:
Jason Kruse
(515) 250-3707
[email protected]