PROJECTS LETTING -  October , 2014

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

HARDIN 14-02-42-01 Pine Lake - Replace/relocate RV Dumpstation-2014-10-16   Bid Completion detail
HARDIN 14-02-42-02 Pine Lake - Shoreline Armoring - Bids-2014-10-16   Bid Completion detail
HARDIN 15-02-42-02 Pine Lake - Concrete Repairs at Boat Ramp Drive-2014-10-16   Bid Completion detail
HARDIN 14-02-42-02 Pine Lake - Shoreline Armoring - Payment Requests-2014-10-16   Bid Completion detail
WEBSTER 14-02-94-01 Brushy Creek Recreation Area - Reroof shop/office pole buildings-2014-10-16   Bid Completion detail
BOONE 14-02-08-01 Barkley State Forest - Demolition and Debris Removal-2014-10-23   Bid Completion detail
FAYETTE 13-03-33-02 Volga River Rec Area - New Wells & Treatment-2014-10-23   Bid Completion detail
POLK 15-05-77-04 Walnut Woods - Storage Building Replacement-2014-10-23   Bid Completion detail
WASHINGTON 15-06-92-01 Lake Darling - Design Guide Cabins-2014-10-23   Bid Completion detail
WEBSTER 15-02-94-03 Brushy Creek Recreation Area - Install (2) Pit Vault Toilets-2014-10-23   Bid Completion detail
ALLAMAKEE 15-03-03-05 Upper Iowa Wildlife Unit - Repair Access Roads-2014-10-30   Bid Completion detail
ALLAMAKEE 14-03-03-04 Yellow River State Forest - Repair Two Ponds-2014-10-30   Bid Completion detail
BUCHANAN 15-03-10-01 Cedar Rock State Park - Replace natural gas service line-2014-10-30   Bid Completion detail
HAMILTON 15-02-40-02 Boone River - Webster City - Olson Rock Toe Repair-2014-11-06   Bid Completion detail
HAMILTON 15-02-40-02 Boone River - Webster City - Olson Rock Toe Repair - Contract-2014-11-06   Bid Completion detail
POTTAWATTAMIE 14-04-78-04 Cold Springs Fisheries Management Unit - Avoca Canoe Access-2014-11-06   Bid Completion detail
WEBSTER 14-02-94-04 Brushy Creek Recreation Area - Reroof shop/office pole buildings (rebid)-2014-11-06   Bid Completion detail
HARDIN 14-02-42-05 Pine Lake - Replace/relocate RV Dump Station (rebid)-2014-11-13   Bid Completion detail




FAYETTE -- PROJECT # 13-03-33-02                10/23/2014                Large Project Letting
VOLGA RIVER REC AREA
NEW WELLS & TREATMENT
Proposal Guarantee: $20,000
Completion Date: 6/30/2015

   This project consists of drilling two new wells at Volga Headquarter building and at the Sleding Hill location along with two new treatment buildings. The project will also include 4200 ft. of new water main to service 6 new hydrant location spread over the Albany campground. Two double hole precast pit toilets will also be installed at the sleding hill and at one of the trail head in the day use area.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    CLEARING & GRUBBING (ALL SITES)     1 L.S.
WELL AT HEADQUARTERS (WELL #3) 
    DRILL 14.75" HOLE FROM 0" TO ESTIMATED 20'     20 L.F.
    FURNISH, INSTALL & REMOVE 10.75" SURFACE CASING     21 L.F.
    GROUT SURFACE CASING WITH 20% SOLIDS BENTONITE GROUT WITH 4 SACKS (ESTIMATED)     4 Each
    DRILL 9.875" OPEN HOLE FROM 20' TO ESTIMATED 515'     495 L.F.
    FURNISH & INSTALL A 7" OD X .317" STEEL WALL CASING     516 L.F.
    GROUT SETUP FEE     1 L.S.
    HIGH PRESSURE GOURT ESTIMATED 160 SACKS OF NEAT CEMENT GROUT     160 Each
    DRILL 6.25" DIAMETER HOLE FROM 515' TO AN ESTIMATED DEPTH OF 765'     250 L.F.
    INSTALL A 5.65" OD X .258" STEEL WALL PERFORATED LINER     150 L.F.
    FURNISH & INSTALL TEST PUMP AND TEST PUMP WELL     24 HR.
    COLLECT GEOLOGICAL SAMPLES & WATER SAMPLES AND SUBMIT IGS AND IDNR REPORTS     1 L.S.
    FURNISH & INSTALL A BAKER MONITOR PITLESS UNIT     1 L.S.
    FURNISH & INSTALL 3 PH. PUMP, 2" SCHD. 80 COLUMN PIPE, 3PH. WIRING, CHECK VALVE ETC. (COMPLETE)     1 L.S.
    ALTERNATE #1 :5" ID PVC SCHEDULE PERFORATED PIPE (COST PER LF.)     1 L.F.
    FURNISH & INSTALL STATIC WATER LEVEL LINE & GAUGE     1 L.S.
    FURNISH & INSTALL 2" CL 160 PVC WATER LINE FROM WELL TO INSIDE WELL HOUSE     40 L.F.
    TRACER WIRE #12 OR 3" WARNING TAPE IF TRENCHED     40 L.F.
    INSTALL WELL BLOW-OFF ASSEMBLY     1 L.S.
WATER TREATMENT BUILDING & DIST. - HQ 
    GRADING     1 L.S.
    10'-6" X 20'-6" PRECAST HUFFCUTT BUILDING (INSTALLED)     1 L.S.
    48" DEEP X 12" WIDE TRENCH FOOTING FOR THE BUILDING AS DESCRIBED IN THE SPECS. INCLUDING EXCAVATION     1 L.S.
    18" DEEP CLASS "A" CRUSHED STONE UNDER THE TREATMENT BUILDING     20 Tons
    ELECTRICAL SERVICE TO THE BUILDING     20 L.F.
    ELECTRICAL SYSTEM COMPLETE FOR TREATMENT BUILDING WITH HEATER, LIGHTS, FAN, ETC.     1 L.S.
    COMPLETE MECHANICAL SYSTEM FOR TREATMENT BUILDING, PROPOTIONAL CHLORINE INJECTION SYSTEM, PRESSURE TANK, MANIFOLD, VALVES, PRESSURE SWITCH, GAUGE, ET     1 L.S.
    2 INCH HDPE DR 11 WATER MAIN BORED TO OFFICE BUILDING     280 L.F.
    TRACER WIRE #12 FOR WATERMAIN     325 L.F.
    1 INCH PE DR 11 TUBING BORED TO HYDRANT     45 L.F.
    WOODWARD FREEZELESS Y1 YARD HYDRANT     1 Each
    CLASS "A" CRUSHED STONE UNDER 5" PCC ACCESS PATH     1 Tons
    REMOVE FENCE AND INSTALL A NEW 6' HIGH X 5' WIDE CHAIN LINK GATE     1 L.S.
    REMOVE FENCE AND INSTALL A NEW 6' HIGH X 12' WIDE CHAIN LINK GATE     1 L.S.
    2" CAP & BLOCK     3 Each
    SEED, FERTILIZE & MULCH ALL DISTURBED AREAS(TREATMENT BUILDING, WELL & DISTRIBUTION)     1 L.S.
    CONNECTION TO OFFICE BUILDING     1 L.S.
    DISINFECTION OF WELL & ALL WATER MAINS     1 L.S.
WELL AT SLEDDING HILL (WELL #4) 
    DRILL 14.75" HOLE FROM 0" TO ESTIMATED 20'     20 L.F.
    FURNISH, INSTALL & REMOVE 10.75" SURFACE CASING     21 L.F.
    GROUT SURFACE CASING WITH 20% SOLIDS BENTONITE GROUT WITH 4 SACKS (ESTIMATED)     4 Each
    DRILL 9.875" OPEN HOLE FROM 20' TO ESTIMATED 460'     440 L.F.
    FURNISH & INSTALL A 7" OD X .317" STEEL WALL CASING     461 L.F.
    GROUT SETUP FEE     1 L.S.
    HIGH PRESSURE GOURT ESTIMATED 140 SACKS OF NEAT CEMENT GROUT     140 Each
    DRILL 6.25" DIAMETER HOLE FROM 460' TO AN ESTIMATED DEPTH OF 710'     250 L.F.
    INSTALL A 5.65" OD X .258" STEEL WALL PERFORATED LINER     150 L.F.
    FURNISH & INSTALL TEST PUMP AND TEST PUMP WELL     24 HR.
    COLLECT GEOLOGICAL SAMPLES & WATER SAMPLES AND SUBMIT IGS AND IDNR REPORTS     1 L.S.
    FURNISH & INSTALL A BAKER MONITOR PITLESS UNIT     1 L.S.
    FURNISH & INSTALL 3 PH. PUMP, 2" SCHD. 80 COLUMN PIPE, 3PH. WIRING, CHECK VALVE ETC. COMPLETE     1 L.S.
    ALTERNATE #1 :5" ID PVC SCHEDULE PERFORATED PIPE (COST PER LF.)     1 L.F.
    FURNISH & INSTALL STATIC WATER LEVEL LINE & GAUGE     1 L.S.
    TRACER WIRE #12 FOR WATERMAIN OR 3" WARNING TAPE IF TRENCHED     40 L.F.
    FURNISH & INSTALL 2" CL 160 PVC WATER LINE FROM WELL TO INSIDE WELL HOUSE     40 L.F.
    INSTALL WELL BLOW-OFF ASSEMBLY     1 L.S.
WATER TREATMENT BUILDING & DIST. - SLED HILL 
    GRADING     1 L.S.
    10'-6" X 20'-6" PRECAST HUFFCUTT BUILDING (INSTALLED)     1 L.S.
    48" DEEP X 12" WIDE TRENCH FOOTING FOR THE BUILDING AS DESCRIBED IN THE SPECS. INCLUDING EXCAVATION     1 L.S.
    18" DEEP CLASS "A" CRUSHED STONE UNDER THE TREATMENT BUILDING     20 Tons
    ELECTRICAL SERVICE TO THE BUILDING     20 L.F.
    ELECTRICAL SYSTEM COMPLETE FOR TREATMENT BUILDING WITH HEATER, LIGHTS, FAN, ETC.     1 L.S.
    COMPLETE MECHANICAL SYSTEM FOR TREATMENT BUILDING, PROPOTIONAL CHLORINE INJECTION SYSTEM, PRESSURE TANK, MANIFOLD, VALVES, PRESSURE SWITCH, GAUGE, ET     1 L.S.
    2 INCH HDPE DR 11 WATER MAIN BORED     3,757 L.F.
    1 INCH PE DR 11 TUBING BORED OR TRENCHED TO HYDRANTS     423 L.F.
    TRACER WIRE #12 FOR WATER MAIN     4,180 L.F.
    WOODWARD FREEZELESS Y2 YARD HYDRANT     6 Each
    FLUSHING HYDRANT     1 Each
    2 " CAP & BLOCK     3 Each
    SEED, FERTILIZE & MULCH ALL DISTURBED AREAS(TREATMENT BUILDING, WELL & DISTRIBUTION)     1 L.S.
    DISINFECTION OF WELL & ALL WATER MAINS     1 L.S.
    ACCESS PATH TO TREATMENT BUILDING WITH CLASS "A" CRUSHED ROCK     2 Tons
HUFFCUTT PIT TOILET PT 275 
    GRADING     1 L.S.
    HUFFCUTT DOUBLE SIDE PIT VAULT PT275 INSTALLED     2 Each
    SIGNAGE & PAINTING     1 L.S.
    PRECAST CONCRETE PARKING WHEEL STOP     1 Each
    CLASS "A" CRUSHED ROCK     2 Tons
    5" THICK PCC ACCESS PATH     6 S.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POLK -- PROJECT # 15-05-77-04                10/23/2014                Large Project Letting
WALNUT WOODS
STORAGE BUILDING REPLACEMENT
Proposal Guarantee: $5,000
Completion Date: 5/31/2015

   This project consists of demolition of the existing storage building and replacing that building with the same outside dimensional footprint with the construction of a one story, pre-engineered post-frame building with a metal roof and metal siding. It will include three bays and a storage room. The work also includes concrete and class "A" crushed stone paving, concrete paving, electrical and mechanical services.

ESTIMATED QUANTITIES:
 
    DEMOLITION OF EXISTING SHOP/GARAGE     1 L.S.
    NEW ELECTRICAL SERVICE     1 L.S.
    EROSION CONTROL     1 L.S.
    PAVEMENT, PCC (6" THICKNESS) WITH REBAR AND SUBBASE     1 L.S.
    SANITARY SEWER CAPPING     1 L.S.
    WATER SERVICE CUT-OFF     1 L.S.
    NEW YARD HYDRANT     1 L.S.
    FINISHING     1 L.S.
    NEW STORAGE BUILDING     1 L.S.
    MOBILIZATION     1 L.S.
    CONSTRUCTION STAKING     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WASHINGTON -- PROJECT # 15-06-92-01                10/23/2014                Large Project Letting
LAKE DARLING
DESIGN GUIDE CABINS
Proposal Guarantee: $40,000
Completion Date: 9/1/2015

   The DNR proposes to install six new two bedroom Design Guide Cabins at Lake Darling State Park. These cabins will have two bedrooms, full kitchen, living room, bathroom with vanity and tub/shower, covered deck and small mechanical room. They will have in-floor heat and split-system cooling and will operate year-round.

ESTIMATED QUANTITIES:
    CLEARING AND GRUBBING     1 L.S.
    GRADING     1 L.S.
    SEEDING, FERTILIZING AND MULCHING     1 L.S.
    8" FILTER SOCK     462 L.F.
    TYPE SW-301 SANITARY MANHOLE     1 Each
    6" PVC SDR 23.5 SANITARY SEWER     395 L.F.
    4" SANITARY SEWER SERVICE     808 L.F.
    4" SANITARY SEWER SERVICE WYE     6 Each
    SANITARY SEWER SERVICE CLEANOUTS     5 Each
    4"X4"X2" TAPPING TEE AND VALVE     1 Each
    2" PVC SDR 21 WATER MAIN     490 L.F.
    2" BLOW-OFF HYDRANT & VALVE     1 Each
    1" PE WATER SERVICE     678 L.F.
    1" TAP SADDLES     6 Each
    WATER SERVICE CURB STOP     6 Each
    CLASS "A" CRUSHED STONE ROADWAY     326 Tons
    GRANULAR BASE FOR PAVEMENT     309 Tons
    5" REINFORCED PCC SIDEWALK PAVEMENT     346 S.Y.
    6" REINFORCED PCC PAVEMENT     1,004 S.Y.
    PRECAST CONCRETE PARKING WHEEL STOPS     14 Each
    ELECTRICAL SERVICE     1 L.S.
    PAINT STRIPING AND HANDICAP SIGNAGE     1 L.S.
    CABINS (INCLUDING ALL ARCHITECTURAL, MECHANICAL AND ELECTRICAL)     6 Each
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HARDIN -- PROJECT # 14-02-42-01                10/16/2014                Small Project Letting
PINE LAKE
REPLACE/RELOCATE RV DUMPSTATION
Proposal Guarantee: $0
Completion Date: 4/15/2015

   This project is for the construction of a new RV dump station and associated utilities at Pine Lake State Park in Hardin County. The existing dump station will be removed as a part of the scope of work as well as the reconfiguration of a camp site into a full hookup site adjacent to the new dump station.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




HARDIN -- PROJECT # 14-02-42-02                10/16/2014                Small Project Letting
PINE LAKE
SHORELINE ARMORING - BIDS
Proposal Guarantee: $0
Completion Date: 3/13/2015

   This project consists of the placement of 590 tons of Class D riprap on the shoreline of Upper Pine Lake at Pine Lake State Park in Hardin County. Some grooming of the existing bank will be required.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




HARDIN -- PROJECT # 15-02-42-02                10/16/2014                Small Project Letting
PINE LAKE
CONCRETE REPAIRS AT BOAT RAMP DRIVE
Proposal Guarantee: $0
Completion Date: 4/15/2015

   This project consists of the replacement of approximately 3,500 square feet of 6" concrete paving at the river boat ramp driveway at Pine Lake State Park in Hardin County.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




WEBSTER -- PROJECT # 14-02-94-01                10/16/2014                Small Project Letting
BRUSHY CREEK RECREATION AREA
REROOF SHOP/OFFICE POLE BUILDINGS
Proposal Guarantee: $0
Completion Date: 12/19/2014

   This project consists of the replacement of asphalt shingle roofing on three buildings at Brushy Creek State Park in Webster County. The scope of work includes the removal of old shingles and gutters and the placement of new shingles and associated substrate, and new gutters and downspouts as noted.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




BOONE -- PROJECT # 14-02-08-01                10/23/2014                Small Project Letting
BARKLEY STATE FOREST
DEMOLITION AND DEBRIS REMOVAL
Proposal Guarantee: $0
Completion Date: 3/20/2015

   This project is for the demolition of a swimming pool and pump room, an asphalt parking lot and removal of miscellaneous debris including wood and concrete and a steel water tank at the Barkley State Forest near Fraser, Iowa. Also included is the plugging of an 8" well casing in the associated creek.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




WEBSTER -- PROJECT # 15-02-94-03                10/23/2014                Small Project Letting
BRUSHY CREEK RECREATION AREA
INSTALL (2) PIT VAULT TOILETS
Proposal Guarantee:
Completion Date: 4/15/2015

   This project consists of the purchase and placement of two double precast concrete pit vault toilets at Brushy Creek State Park in Webster County. The scope of work includes minor grading/sod removal, excavation and placement of the pit vaults, preparation of a rock parking area and final grading/grooming of sites.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




ALLAMAKEE -- PROJECT # 15-03-03-05                10/30/2014                Small Project Letting
UPPER IOWA WILDLIFE UNIT
REPAIR ACCESS ROADS
Proposal Guarantee: $0
Completion Date: 12/12/2014

   Project consists of reshaping roadways, furnishing & Placing cr. stone surfacing & revetment, replacement of roadway culvert at Waterloo Cr. WMA, Allamakee County. Plans may be obtained by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




ALLAMAKEE -- PROJECT # 14-03-03-04                10/30/2014                Small Project Letting
YELLOW RIVER STATE FOREST
REPAIR TWO PONDS
Proposal Guarantee: $0
Completion Date: 12/12/2014

   Project consists of repairing two pond dikes in Yellow River State Forest, Allamakee Co. Iowa. Plans may be obtain by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




BUCHANAN -- PROJECT # 15-03-10-01                10/30/2014                Small Project Letting
CEDAR ROCK STATE PARK
REPLACE NATURAL GAS SERVICE LINE
Proposal Guarantee: $0
Completion Date: 11/14/2014

   Project consists of replacing approx. 3500 LF 1 1/4" gas service from meter to Frank Lloyd Wright house at Cedar Rock State Park, Buchanan Co. Iowa. Plans may be obtained by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




HAMILTON -- PROJECT # 15-02-40-02                11/6/2014                Small Project Letting
BOONE RIVER - WEBSTER CITY
OLSON ROCK TOE REPAIR
Proposal Guarantee: $0
Completion Date: 1/15/2015

   Project involves the placement of a rock toe to repair damage to a bank restoration project on the Boone River in Webster City. Additional cut at the remnant ice dam is required as well as cut of an upstream point bar. In addition to rock toe, 3 vanes that extend 25' out from the bank will be built.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




POTTAWATTAMIE -- PROJECT # 14-04-78-04                11/6/2014                Small Project Letting
COLD SPRINGS FISHERIES MANAGEMENT UNIT
AVOCA CANOE ACCESS
Proposal Guarantee: $0
Completion Date: 4/10/2015

   Regrade canoe access area to lessen the slope of the ramp at the Avoca Canoe Access. Pour a new 5" thick PCC ramp and seed all disturbed areas.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




WEBSTER -- PROJECT # 14-02-94-04                11/6/2014                Small Project Letting
BRUSHY CREEK RECREATION AREA
REROOF SHOP/OFFICE POLE BUILDINGS (REBID)
Proposal Guarantee: $0
Completion Date: 5/1/2015

   This project consists of the replacement of asphalt shingle roofing on three buildings at Brushy Creek State Park in Webster County. The scope of work includes the removal of old shingles and gutters and the placement of new shingles and associated substrate, and new gutters and downspouts as noted.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




HARDIN -- PROJECT # 14-02-42-05                11/13/2014                Small Project Letting
PINE LAKE
REPLACE/RELOCATE RV DUMP STATION (REBID)
Proposal Guarantee: $0
Completion Date: 5/1/2015

   This project is for the construction of a new RV dump station and associated utilities at Pine Lake State Park in Hardin County. The existing dump station will be removed as a part of the scope of work as well as the reconfiguration of a camp site into a full hookup site adjacent to the new dump station.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov