PROJECTS LETTING -  October , 2010

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

BUTLER 09-03-12-01 Big Marsh WMA - Repair spillway and structures-2010-10-14   Bid Completion detail
CERRO GORDO 08-03-17-05 Clear Lake - The Ritz - Shore up undercut sidewalk-2010-10-14   Bid Completion detail
CERRO GORDO 11-03-17-01 Ventura Access - fishing path -2010-10-14   Bid Completion detail
DELAWARE 11-03-28-03 Lake Delhi - Rock Purchase-2010-10-15   Bid Completion detail
DELAWARE 11-02-28-04 Lake Delhi / Maquoketa River - Stop head cut from dam breach-2010-10-19   Bid Completion detail
CLINTON 09-06-23-01 McCausland Boat ramp - FEMA repair- flood damage-2010-10-21   Bid Completion detail
VAN BUREN 10-06-89-07 IDNR- Lenth Tract- Fox River WMA - Dike repair and shallow water excavation-2010-10-21   Bid Completion detail
WASHINGTON 07-06-92-03 Lake Darling, Washington County - Geotech-Dam/Spillway Evaluation-2010-10-21   Bid Completion detail
WOODBURY 11-01-97-01 Luton WMA- Winkel tract - West dike and spillway-2010-10-21   Bid Completion detail
DELAWARE 09-03-28-04 Backbone State Park - Sleeve cabin sewer line-2010-11-04   Bid Completion detail
KOSSUTH 11-02-55-01 A.A. Call State Park - Pad and utilities for CXT Build-2010-11-04   Bid Completion detail




DELAWARE -- PROJECT # 11-03-28-03                10/15/2010                Large Project Letting
LAKE DELHI
ROCK PURCHASE
Proposal Guarantee:
Completion Date: 11/5/2010

   This project consists of stockpiling and delivering on demand various gradations of stone to the Hartwick Marina and incidental work as required by the Specifications and/or the DNR Construction Inspector

ESTIMATED QUANTITIES:
    Derrick Stone     2,200 Tons
    Class E Riprap     10,150 Tons
    Class E Large Riprap     4,350 Tons
    Class D Riprap     600 Tons
    6" Minus Stone     1,275 Tons
    3" Roadstone     300 Tons
Alternate
    Additional Labor Charge for Sunday     30 HR.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DELAWARE -- PROJECT # 11-02-28-04                10/19/2010                Large Project Letting
LAKE DELHI / MAQUOKETA RIVER
STOP HEAD CUT FROM DAM BREACH
Proposal Guarantee: $30,000
Completion Date: 11/12/2010

   .

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Excavation, Channel (Waste)     5,000 C.Y.
    Revetment, Class "D" Riprap Fill (Placement Only)     600 Tons
    Revetment, Class "E" Riprap Fill (Placement Only)     14,500 Tons
    Derrick Stones, Limestone (Placement Only)     2,200 Tons
    Crushed Stone Fill, 6" Minus Material     1,275 Tons
    Surfacing, CR. Stone, 3" (Placement Only, Haul Road)     300 Tons
    Construct Access Haul Road, w/Turnaround     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WASHINGTON -- PROJECT # 07-06-92-03                10/21/2010                Large Project Letting
LAKE DARLING, WASHINGTON COUNTY
GEOTECH-DAM/SPILLWAY EVALUATION
Proposal Guarantee: $70,000
Completion Date: 5/31/2012

   This project consists of site preparation, removal of the existing drawdownpipe and concrete spillway, construcation of groundwater drains, a 72-inch diameter reinforced concrete piincipal spillwau pipe, a reinforced concrete drop inlet structure, a reinforced concrete impact basin outlet strucure, a gated 36-inch reinforced concrete drawdown pipe, earth grading, placement of riprap and other erosion control features and incidental work as required by the drawings, specifications, the DNR Inspector and/or the Construction Representative.

ESTIMATED QUANTITIES:
    SITE PREPARATION     1 L.S.
    EXPLORATORY EXCAVATION     12 HR.
    STRIPPING, SALVAGING AND SPREADING TOPSOIL     7,800 C.Y.
    EXCAVATION AND REPLACEMENT OF UNSUITABLE MATERIAL     500 C.Y.
    EXCAVATION, COMMON     55,606 C.Y.
    ROCK EXCAVATION     6,422 C.Y.
    REMOVAL OF EXISTING STRUCTURES     1 L.S.
    SPECIAL BACKFILL     200 Tons
    TRENCH DRAIN AND OUTLET     900 C.Y.
    48" DIAMETER MANHOLE     1 Each
    DRAINAGE DIAPHRAGM AND OUTLET     245 C.Y.
    EMBANKMENT     147,618 C.Y.
    72" REINFORCED CONCRETE PRESSURE PIPE     160 L.F.
    STANDARD BAFFLE RISER     1 L.S.
    STANDARD IMPACT BASIN     1 L.S.
    RIPRAP     3,500 Tons
    DRAINAGE TILE INLET STRUCTURE     4 Each
    TOE DRAINS     350 L.F.
    12" DRAINAGE TILE PIPE     500 L.F.
    12" HDPE CULVERT     35 L.F.
    18" HDPE CULVERT     45 L.F.
    12" RCP APRON     2 Each
    18" RCP APRON     2 Each
    PIEZOMETERS     3 Each
    SILT FENCE     2,500 L.F.
    FILTER SOCK     1,000 L.F.
    FERTILIZING AND SEEDING, TEMPORARY     3 Acres
    FERTILIZING AND SEEDING, PERMANENT     4.7 Acres
    MULCHING     7.7 Acres
    TYPE 1 TURF REINFORCEMENT     40,700 S.F.
    WOOD EXCELSIOR MAT     19,500 S.F.
    CONSTRUCTION STAKING     1 L.S.
    SOIL TESTING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DELAWARE -- PROJECT # 09-03-28-04                11/4/2010                Large Project Letting
BACKBONE STATE PARK
SLEEVE CABIN SEWER LINE
Proposal Guarantee: $5,000
Completion Date: 5/30/2011

   This project consists of lining approximately 5,550 linear feet of 6 to 8 inchs diameter sewer line by cured-in-place pipe liner at Backbone State Park.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Bypass Plumbing     1 L.S.
    Sewer Lining - 6"-8" Sanitary     5,541 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BUTLER -- PROJECT # 09-03-12-01                10/14/2010                Small Project Letting
BIG MARSH WMA
REPAIR SPILLWAY AND STRUCTURES
Proposal Guarantee:
Completion Date: 11/24/2010

   Work consists of placing revetment along scoured bank and extend spillway revetment, excavate aroud outlet control structure to check on possible damage, backfill scour & place revetment at outlet pipe, and place soil borrow material to level dike roadway.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




CERRO GORDO -- PROJECT # 11-03-17-01                10/14/2010                Small Project Letting
VENTURA ACCESS
FISHING PATH
Proposal Guarantee:
Completion Date: 5/15/2011

   Work consists of removing existing riprap east of boat ramp down to approximately 1 foot above lake water level, grading a 6-foot wide sub grade for the new sidewalk and creating a fishing bump out area, placing a granular sub-base, and placing 6-inch PCC sidewalk.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




CLINTON -- PROJECT # 09-06-23-01                10/21/2010                Small Project Letting
MCCAUSLAND BOAT RAMP
FEMA REPAIR- FLOOD DAMAGE
Proposal Guarantee:
Completion Date: 11/27/2010

   Repair of riverbank erosion at DNR McCausland Access on Wapsipinicon River. Project location is off County Road Z30 north of McCausland. Bank repair is for 130 linear ft of riverbank. Construction and materials shall follow Iowa DOT Standard Specifications, Series 2009. Project quantities: Class 10 Excavation, 87 CU YD Class E Revetment, 260 TON Engineering Fabric, 232 SQ YD Concrete Grout for Revetment, 52 CU YD

Contact:
David Heer
(515) 250-3719
[email protected]




VAN BUREN -- PROJECT # 10-06-89-07                10/21/2010                Small Project Letting
IDNR- LENTH TRACT- FOX RIVER WMA
DIKE REPAIR AND SHALLOW WATER EXCAVATION
Proposal Guarantee: $5,000
Completion Date: 12/31/2010

   This project consists of repairing an existing earthen dike, creating shallow water excavations and incidental work as required by the Plans and/or the DNR Construction Inspector.

Contact:
David Heer
(515) 250-3719
[email protected]




WOODBURY -- PROJECT # 11-01-97-01                10/21/2010                Small Project Letting
LUTON WMA- WINKEL TRACT
WEST DIKE AND SPILLWAY
Proposal Guarantee: $0
Completion Date: 12/3/2010

   This project is designed to improve and add additional elements to the Winkle Tract of the Luton Wetland Complex in Woodbury County. Work under this project includes excavations, earthfill (dike construction), and a shallow water crossing.

Contact:
Jeff Felts
515-250-3712
[email protected]




KOSSUTH -- PROJECT # 11-02-55-01                11/4/2010                Small Project Letting
A.A. CALL STATE PARK
PAD AND UTILITIES FOR CXT BUILD
Proposal Guarantee: $0
Completion Date: 11/18/2010

   This project consists of providing an 18" thick rock pad and stubbing out utilities for a precast concrete water treatment building in AA Call State Park.

Contact:
Don Labate
515-250-3714
[email protected]