PROJECTS LETTING -  October , 2013

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

JASPER 11-05-50-05 Rock Creek Lake State Park - Sediment Basin #1-2013-10-10   Bid Completion detail
WASHINGTON 10-06-92-15 Lake Darling State Park - Concrete Testing-2013-10-10   Bid Completion detail
WASHINGTON 10-06-92-16 Lake Darling State Park - Concrete Testing-2013-10-10   Bid Completion detail
FRANKLIN 14-02-35-02 Beed's Lake State Park - Shower Building-2013-10-17   Bid Completion detail
MARION 14-05-63-01 Elk Rock State Park - Shower Buildings-2013-10-17   Bid Completion detail
SHELBY 13-04-83-01 Prairie Rose Lake - In-Lake Hydaulic Dredging-2013-10-17   Bid Completion detail
LINN 14-06-57-03 Palisades-Kepler - Lodge bat exclusion-2013-10-24   Bid Completion detail
CERRO GORDO 13-03-17-04 Clear Lake Dredge Spoil Containment Site - Lower Existing Dikes Phase 2-2013-11-07   Bid Completion detail




FRANKLIN -- PROJECT # 14-02-35-02                10/17/2013                Large Project Letting
BEED'S LAKE STATE PARK
SHOWER BUILDING
Proposal Guarantee: $20,000
Completion Date: 5/15/2014

   This project consists of the demolition of an existing shower building in the campground, installing a new shower building in the same location, and constructing a new campsite near the shower building. Work includes installing ADA sidewalks and parking for access to the new building, all earthwork, supplying and installing the new structures and incidental work as required by the project documents and the IDNR Inspector at Beeds Lake State Park in Marion County, Iowa.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    CLEARING AND GRUBBING     1 L.S.
    SITE WORK AND UTILITY CONNECTIONS     1 L.S.
    CHEYENNE PRECAST CONCRETE SHOWER BUILDING     1 Each
    CLASS "A" CRUSHED STONE     180 Tons
    SIDEWALK, PCC, 6"     127.8 S.Y.
    PARKING LOT, PCC, 6"     83.3 S.Y.
    SIGNING     1 L.S.
    DRAIN-DOWN PIT     1 L.S.
    PRECAST CONCRETE PARKING WHEEL STOPS     1 Each
    EROSION CONTROL     110 L.F.
    WATER MAIN, 2" HDPE     6.4 L.F.
    ELECTRICAL SERVICE     1 L.S.
    SANITARY SEWER PIPE, 4" C900     40.7 L.F.
    PAINTED PAVEMENT MARK, WATERBORNE/SOLVENT     2.7 STA.
    MANHOLE, SW-301, 48"     1 Each
    DETECTABLE WARNING PANEL     12 S.F.
    ENGINEERING FABRIC     101.3 S.Y.
    MACADAM STONE     23 Tons
    3/8" MINUS CRUSHED STONE     10 Tons
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MARION -- PROJECT # 14-05-63-01                10/17/2013                Large Project Letting
ELK ROCK STATE PARK
SHOWER BUILDINGS
Proposal Guarantee: $30,000
Completion Date: 5/15/2014

   This project consists of the demolition of an existing shower building in the campground, installing a new shower building in the same location, and constructing a new campsite near the shower building. This includes installing sidewalks for access to the new building, all earthwork, supplying and installing the new structures and incidental work as required by the project documents and the IDNR Inspector at Elk Rock State Parks in Marion County, Iowa.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    CLEARING AND GRUBBING     1 L.S.
    SITE WORK AND UTILITY CONNECTIONS     1 L.S.
    CHEYENNE PRECAST CONCRETE SHOWER BUILDING     2 Each
    CLASS "A" CRUSHED STONE     377 Tons
    SIDEWALK, PCC, 6"     201.3 S.Y.
    PARKING LOT, PCC, 6"     77.8 S.Y.
    SIGNING     1 Each
    DRAIN-DOWN PIT     2 Each
    PRECAST CONCRETE PARKING WHEEL STOPS     2 Each
    EROSION CONTROL     599 L.F.
    WATER MAIN, 1" HDPE     150 L.F.
    WATER MAIN, 2" HDPE     62 L.F.
    ELECTRICAL SERVICE     1 L.S.
    ELECTRICAL FIXTURES     1 L.S.
    HYDRANT     1 Each
    SANITARY SEWER, 2" HDPE, DIRECTIONAL DRILLED     455.86 L.F.
    PAINTED PAVEMENT MARK, WATERBORNE/SOLVENT     2.7 STA.
    LIFT STATION     1 L.S.
    DETECTABLE WARNING PANEL     24 S.F.
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SHELBY -- PROJECT # 13-04-83-01                10/17/2013                Large Project Letting
PRAIRIE ROSE LAKE
IN-LAKE HYDAULIC DREDGING
Proposal Guarantee: $40,000
Completion Date: 12/31/2014

   This project consists of removing approximately 185,000 CY of sediment from Prairie Rose Lake.

ESTIMATED QUANTITIES:
    Dredging, Hydraulic     185,065 C.Y.
    Control Structure     1 L.S.
    Site Restoration     1 L.S.
    Mobilzation     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JASPER -- PROJECT # 11-05-50-05                10/10/2013                Small Project Letting
ROCK CREEK LAKE STATE PARK
SEDIMENT BASIN #1
Proposal Guarantee: $0
Completion Date: 4/15/2014

   This project consists of construction of a sediment basin. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




WASHINGTON -- PROJECT # 10-06-92-15                10/10/2013                Small Project Letting
LAKE DARLING STATE PARK
CONCRETE TESTING
Proposal Guarantee: $0
Completion Date: 2/1/2014

   Daily PCC testing for approximately 24,000 CY of pavement.

Contact:
Heath Delzell
(515) 979-0104
heath.delzell@dnr.iowa.gov




WASHINGTON -- PROJECT # 10-06-92-16                10/10/2013                Small Project Letting
LAKE DARLING STATE PARK
CONCRETE TESTING
Proposal Guarantee: $0
Completion Date: 2/1/2014

   Daily PCC testing for approximately 24,000 CY of pavement.

Contact:
Heath Delzell
(515) 979-0104
heath.delzell@dnr.iowa.gov




LINN -- PROJECT # 14-06-57-03                10/24/2013                Small Project Letting
PALISADES-KEPLER
LODGE BAT EXCLUSION
Proposal Guarantee: $0
Completion Date: 3/31/2014

   PALISADES KEPLAR STATE PARK LODGE IS OVERRUN WITH BATS, THIS PROJECT IS TO CLEAN THE INTERIOR OF THE LODGE AND THEN PROCEED TO BAT-PROOF THE ENTIRE STRUCTURE INSIDE AND OUT. A ONE YEAR WARRANTY WITH A TEN YEAR MAINTENANCE PLAN SHALL BE REQUIRED FOR THIS PROJECT.

Contact:
Bruce Flippin
515-689-8009
bruce.flippin@dnr.iowa.gov




CERRO GORDO -- PROJECT # 13-03-17-04                11/7/2013                Small Project Letting
CLEAR LAKE DREDGE SPOIL CONTAINMENT SITE
LOWER EXISTING DIKES PHASE 2
Proposal Guarantee: $0
Completion Date: 4/15/2014

   Project consists of lowering approximately 6800 LF of existing dike toward the interior of the containment site, leveling tree removal piles in the northerly section of the site and as per site DNR Facilities Engineer. Plans & Specs may be obtained by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov