PROJECTS LETTING -  October , 2024

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

LUCAS 25-05-59-02 Stephens State Forest - Mine Pond - Pit Latrine Roof Replacement-2024-10-17   Bid Completion detail
CERRO GORDO 23-03-17-06 Clear Lake State Park - Campground Improvements-2024-10-24   Bid Completion detail
FRANKLIN 24-02-35-01 Beeds Lake State Park - Wastewater Connection-2024-10-24   Bid Completion detail
HANCOCK 25-02-41-01 East Twin Lake - Lake Enhancements-2024-10-24   Bid Completion detail
MARION 25-05-63-02 Red Rock Wildlife Unit - Swan Refuge Dike Repairs-2024-10-24   Bid Completion detail
MUSCATINE 24-06-70-01 Fairport State Fish Hatchery - Roof Replacements-2024-10-24   Bid Completion detail
POWESHIEK 25-05-79-01 Diamond Lake Park - Lake Restoration Watershed Improvements - Phase 1-2024-10-24   Bid Completion detail
BREMER 25-03-09-01 Cedar-Wapsi Wildlife Unit - Sweet Marsh WMA West Miller Wetlands Shallow Water Excavation-2024-10-31   
VAN BUREN 25-06-89-02 Lacey-Keosauqua State Park - Lodge HVAC Replacement-2024-10-31   




CERRO GORDO -- PROJECT # 23-03-17-06                10/24/2024                Large Project Letting
CLEAR LAKE STATE PARK
CAMPGROUND IMPROVEMENTS
Proposal Guarantee: $37,500
Completion Date: 9/12/2025

   This project includes replacing water lines, extending water lines, installing 11 community hydrants, construction 27 new 50-amp electric camp sites and 7 full hook-up sites (with water and sewer) and associated miscellaneous work.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Traffic Control     1 L.S.
    Temporary Construction Entrance      1 L.S.
    Demolition     1 L.S.
    Clearing and Grubbing     1 L.S.
    HMA Apron Removals     80 Each
    Filter Sock     1,000 L.F.
    Sanitary Sewer Connection to Existing Main     1 Each
    Type SW-301 48" Diameter Sanitary Manhole w/Type 'A' Casting     2 Each
    6-inch Sanitary Sewer (SDR 23.5)     728 L.F.
    4-inch Sanitary Sewer Service PVC (SDR 23.5)     44 L.F.
    RV Sanitary Sewer Cleanout Connection     7 Each
    Sanitary Sewer Road Crossing     2 Each
    1-inch HDPE Pipe     311 L.F.
    1.5-inch HDPE Pipe     663 L.F.
    2-inch HDPE Pipe     1,151 L.F.
    3-inch HDPE Pipe     1,123 L.F.
    2-Inch Valve with Curb Stop     4 Each
    3-Inch Valve with Curb Stop     4 Each
    Hydrant     18 Each
    ADA Hydrant     1 Each
    HDPE Tees     5 Each
    HDPE Cross     2 Each
    Bollards     22 Each
    Remove Booster Pump     1 L.S.
    Single Campsite Outlet Post-50 Amp     35 Each
    No. 2 AWG Grounding Conductor Cable, Type THW or USE     2,658 L.F.
    No. 300 MCM Single Conductor Cable, Type USE     309 L.F.
    No. 250 MCM Single Conductor Cable, Type USE     4,467 L.F.
    No. 4/0 AWG Single Conductor Cable, Type USE     3,198 L.F.
    Roadway Crossing 3.5-Inch Conduit Schedule 80 PVC     100 L.F.
    Trench, Single Circuit Secondary     2,293 L.F.
    Circuit Breakers     9 Each
    Led Light Pole      1 L.S.
    Special Backfill/Granular Base     84 Tons
    6-inch Non-Reinforced PCC     398 S.Y.
    Engineering Fabric     4,449 S.Y.
    Macadam Stone     868 Tons
    Class A Crushed Stone     346 Tons
    4'x4'x5.5" Reinforced PCC Slab and Fire Ring     31 Each
    Fire Ring Only, ADA Model     3 Each
    Topsoil, Furnish and Place     420 C.Y.
    Campsite Posts, Furnish and Install     34 Each
    Seeding, Fertilizing, and Mulching - Hydraulic Seeding     1 L.S.
    Seeding, Fertilizing and Mulching     3.6 Acres
    NPDES General Permit #2 & SWPPP     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




FRANKLIN -- PROJECT # 24-02-35-01                10/24/2024                Large Project Letting
BEEDS LAKE STATE PARK
WASTEWATER CONNECTION
Proposal Guarantee: $100,000
Completion Date: 5/15/2026

   This project consists of decommissioning the existing sanitary lagoon and construct a 3.4-mile sewer force main that connects the park to the City of Hampton.

ESTIMATED QUANTITIES:
    Clearing and Grubbing     1 L.S.
    Excavation, Class 10     1,640 C.Y.
    Over-excavation, Unsuitable or Unstable Soils     300 C.Y.
    Sanitary Sewer Gravity Main, Trenched, PVC, 8"     1,075 L.F.
    Sanitary Sewer Gravity Main, Trenchless, PVC, 8"     364 L.F.
    Sanitary Sewer Gravity Main with Casing Pipe, Trenchless, PVC, 8"     221 L.F.
    Sanitary Sewer Force Main, PVC, 4"     18,070 L.F.
    Sanitary Sewer Force Main with Casing Pipe, Trenchless, PVC, 4"     85 L.F.
    Combination Air Valve and Pit     7 Each
    Drain Valve and Pit     3 Each
    Repair Field Tile     4 Each
    Manhole, SW-301, 48"     8 Each
    Internal Drop Connection, 8"     4 Each
    Connection to Existing Manhole     1 Each
    Remove Manhole     2 Each
    Flowmeter and Manhole, Sanitary Sewer Gravity Main     1 Each
    Flowmeter and Manhole, Sanitary Sewer Force Main     1 Each
    Lift Station and Waste Stabilization     1 L.S.
    Septic Tank     2 Each
    Driveway, Granular, 6"     430 S.Y.
    Temporary Traffic Control     1 L.S.
    SWPPP Preparation     1 L.S.
    SWPPP Management     1 L.S.
    Erosion Control     1 L.S.
    Lagoon Sludge Disposal and Land Application     1 L.S.
    Lagoon Structure and Equipment Demolition     1 L.S.
    Construction Survey     1 L.S.
    Mobilization     1 L.S.
    Site Restoration     1 L.S.
    Electrical, Complete     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HANCOCK -- PROJECT # 25-02-41-01                10/24/2024                Large Project Letting
EAST TWIN LAKE
LAKE ENHANCEMENTS
Proposal Guarantee: $25,000
Completion Date: 8/30/2025

   This project consists of modifying the upper and lower concrete stoplog structures. A fabricated steel walkway and handrail is to be added to the upper structure. Work on the lower structure consists of replacing the existing wood deck with a fabricated steel walkway and handrail, adding sheet piling and riprap to the east side of the structure, replace the interior concrete walls and structure floor, and construct a fabricated fish barrier. Both structures will have minor grading for the walkway approaches.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Site Preparation     1 L.S.
    Excavation     232 C.Y.
    Embankment Construction     25 C.Y.
    PCC Paving     8 C.Y.
    Cast-in-place Concrete - Reinforced     28 C.Y.
    Cast-in-place Concrete - Flowable     10 C.Y.
    Precast Plank Beams     1 L.S.
    DU Class IV Riprap     455 Tons
    Iowa DOT Class C Roadstone     12 Tons
    Sheet Piling     400 S.F.
    Bollards     2 Each
    Structural Steel - Upper Structure     1 L.S.
    Structural Steel - Lower Structure     1 L.S.
    Demolition and Removals     1 L.S.
    Soil Erosion and Pollution Control - Silt Fence     300 L.F.
    Soil Erosion and Pollution Control - Wattle     300 L.F.
    Temporary Rolled Erosion Control Product (RECP)     150 S.Y.
    Seeding & Mulching     0.75 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MUSCATINE -- PROJECT # 24-06-70-01                10/24/2024                Large Project Letting
FAIRPORT STATE FISH HATCHERY
ROOF REPLACEMENTS
Proposal Guarantee: $6,250
Completion Date: 5/23/2025

   This project includes replacing shingles and misc repairs to three roofs at Fairport State Fish Hatchery in Muscatine County.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Demolition/Asbestos Abatement     1 L.S.
    Barn Roof Repairs     1 L.S.
    Office Roof Repairs     1 L.S.
    Sheathing Replacements     600 S.F.
    Fascia Board Replacements     40 L.F.
Alternate
    Alt. No. 1 - Barn Roof Upgrade to Metal Shingles     1 L.S.
Alternate
    Alt. No. 2 - Chemical Storage Shed Roof Replacement     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POWESHIEK -- PROJECT # 25-05-79-01                10/24/2024                Large Project Letting
DIAMOND LAKE PARK
LAKE RESTORATION WATERSHED IMPROVEMENTS - PHASE 1
Proposal Guarantee: $37,500
Completion Date: 9/15/2025

   This project consists of removing sediment from two ponds, constructing a new sediment pond, and stream stabilization work.

ESTIMATED QUANTITIES:
    MOBILIZATION & DEMOBILIZATION      1 L.S.
    SITE PREPARATION AND CLEARING      1 L.S.
    TREE CLEARING      3.7 Acres
    DREDGING      32,099 C.Y.
    DRAWDOWN AND CONTROL OF WATER      1 L.S.
    BMP 9, OVER-EXCAVATION, CORE TRENCH      720 C.Y.
    BMP 9, CLAY LINER, 12"      1,775 C.Y.
    EXCAVATION, STREAMBANK     2,584 C.Y.
    EARTHFILL, STREAMBANK     235 C.Y.
    EARTHFILL, EMBANKMENT & CORE TRENCH FILL     11,873 C.Y.
    EARTHFILL, TERRACE FILL     1,650 C.Y.
    TOPSOIL, STRIP, STOCKPILING & RESPREAD     9,775 C.Y.
    DRAIN TILE INVESTIGATION AND REMOVAL     670 L.F.
    8" SMOOTH STEEL OUTLET PIPE      138 L.F.
    TRASH RACK AND HOOD INLET      1 L.S.
    DRAINAGE DIAPHRAGM      1 L.S.
    8" HICKENBOTTOM INTAKE     2 Each
    10" ALUMINZED CMP TILE OUTLETS (20 LF SECTIONS)     3 Each
    DUAL WALL HDPE 8" PERFORATED TILE     200 L.F.
    RIP RAP, CLASS 'E' WITH GEOTEXTILE FABRIC     240 Tons
    CHOKE AND CHINK STONE, 1 TO 5 INCH, WELL GRADED.     52 Tons
    RECP, 400G COIR MAT     1,260 S.Y.
    TYPE 2, TURF REINFORMCENT MAT      550 S.Y.
    BANK STABILIZATION, TYPE 2B RECP      1,400 S.Y.
    CHANNEL STABILIZATION, TYPE 3B RECP      3,690 S.Y.
    BANK STABILIZATION, WILLOW AND DOGWOOD STAKES HARVEST ON SITE     3,780 Each
    SEEDING, BUFFER      12.6 Acres
    SEEDING, STRUCTURE      0.9 Acres
    SEEDING, TEMPORARY      13.5 Acres
    SILT FENCE      1,015 L.F.
    STRAW WATTLE      4,680 L.F.
    CONSTRUCTION ENTRANCE, 2" CLEAN STONE      70 Tons
    SWPPP MANAGEMENT      1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LUCAS -- PROJECT # 25-05-59-02                10/17/2024                Small Project Letting
STEPHENS STATE FOREST
MINE POND - PIT LATRINE ROOF REPLACEMENT
Proposal Guarantee: $0
Completion Date: 5/23/2025

   This project will replace a storm-damaged roof on a pit latrine building. The roof will be removed down to the top wall plate, then replaced with new trusses, decking, shingles, soffit, fascia, drip edge, etc. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




MARION -- PROJECT # 25-05-63-02                10/24/2024                Small Project Letting
RED ROCK WILDLIFE UNIT
SWAN REFUGE DIKE REPAIRS
Proposal Guarantee: $0
Completion Date: 8/31/2025

   The purpose of this project is to repair & shape dikes. The project is being bid per hour of machine work for approximately 200 hours of excavator work and 20 hours of dozer work. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




BREMER -- PROJECT # 25-03-09-01                10/31/2024                Small Project Letting
CEDAR-WAPSI WILDLIFE UNIT
SWEET MARSH WMA WEST MILLER WETLANDS SHALLOW WATER EXCAVATION
Proposal Guarantee: $0
Completion Date: 4/1/2025

   Work includes clearing and grubbing an area to be excavated. Area 1 of the West Miller Wetlands to be excavated and spoiled per the plans and specifications documents.

Contact:
Kenneth Howe
319-240-3553
Kenneth.howe@dnr.iowa.gov




VAN BUREN -- PROJECT # 25-06-89-02                10/31/2024                Small Project Letting
LACEY-KEOSAUQUA STATE PARK
LODGE HVAC REPLACEMENT
Proposal Guarantee: $0
Completion Date: 12/31/2024

   The Lacey-Keosauqua State Park Lodge HVAC cooling and heating system has reached the end of its useful life. This project will replace all of the HVAC Equipment, air handlers, furnaces, AC compressor units including all necessary and related appurtenances with more efficient units.

Contact:
Mark Moeller
515-214-9532
mark.moeller@dnr.iowa.gov