PROJECTS LETTING -  September , 2012

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

JACKSON 12-06-49-04 Bellevue Fisheries Station - Ramp repair/work-2012-09-27   Bid Completion detail
JACKSON 12-03-49-02 Bellevue State Park - replace roof-2012-09-27   Bid Completion detail
TAYLOR 13-04-87-02 Lake of Three Fires State Park - Shoreline Armoring-2012-09-27   Bid Completion detail
GUTHRIE 13-04-39-02 Springbrook State Park - Boat ramp shoreline-2012-10-04   Bid Completion detail
WASHINGTON 12-06-92-07 Lake Darling - Shoreline Armoring and PCC Paving-2012-10-04   Bid Completion detail
VAN BUREN 13-06-89-01 Lacey Keosauqua State Park - add new electrical sites campgr-2012-10-11   Bid Completion detail
LINN 12-06-57-03 Pleasant Creek State Rec Area - campground and shelter electric-2012-10-18   Bid Completion detail
LYON 10-01-60-03 Klondike Dam - remove dam, construct rapids-2012-10-18   Bid Completion detail
LYON 12-01-60-01 Other - Klondike Dam - Klondike Dam Mitigation Rock-2012-10-18   Bid Completion detail
POLK 10-02-77-09 Big Creek Enforcement - Storage and Office Building-2012-10-18   Bid Completion detail
JONES 12-06-53-03 Muskrat Slough - dike design and construction-2012-10-25   Bid Completion detail




WASHINGTON -- PROJECT # 12-06-92-07                10/4/2012                Large Project Letting
LAKE DARLING
SHORELINE ARMORING AND PCC PAVING
Proposal Guarantee: $160,000
Completion Date: 7/1/2013

   This project consists of removing the existing HMA and PCC pavement, grading the main boat ramp area, constructing a sheet pile marina and boat slip, constructing a PCC boat ramp, constructing PCC pavement and sidewalk, jetty construction, shoreline armoring and incidental work as required by the DNR District Engineer

ESTIMATED QUANTITIES:
Handicap Fishing Pier 
    Fishing Pier     1 L.S.
Fishing Trail 
    CLEAR+GRUBB     6 Acres
    EXCAVATION, CL 10, RDWY+BORROW     1,977 C.Y.
    MODIFIED SUBBASE     7.4 C.Y.
    GRANULAR SURF ON RD, CL A CR STONE     1,619 Tons
    APRON, METAL, 18"     6 Each
    APRON, METAL, 24"     2 Each
    CULV, CMP ENT, 18"     63 L.F.
    CULV, CMP ENT, 24"     45 L.F.
    SIDEWALK, PCC 5"     6,892.1 S.Y.
    SIDEWALK, PCC, 6"     587 S.Y.
    SEED+FERTILIZE (URBAN)     6 Acres
Shoreline Armoring 
    CLEAR+GRUBB     1.9 Acres
    EXCAVATION, CL 10, RDWY+BORROW     12,097 C.Y.
    ENGINEERING FABRIC     6,935 S.Y.
    REVETMENT, CLASS D     4,986 Tons
    SEED+FERTILIZE (URBAN)     1.9 Acres
    BEACH SAND     4,560 Tons
    RAISE LIFT STATION, COMPLETE     1 L.S.
Replace Main Boat Ramp (P&I) 
    CLEAR+GRUBB     6 Acres
    EXCAVATION, CL 10, RDWY+BORROW     14,815 C.Y.
    MODIFIED SUBBASE     596 C.Y.
    SHLD CONSTRUCTION, EARTH     6.61 STA.
    STD/S-F PCC PAV'T, CL A CL 2, 7"     2,980 S.Y.
    GRANULAR SURF ON RD, CL A CR STONE     556.5 Tons
    STRUCT CONC (MISCELLANEOUS)     160 C.Y.
    ARPON, METAL, 12"     1 Each
    INTAKE, SW511     1 Each
    INTAKE, SW-512, 18"     1 Each
    PILE, STEEL SHEET     3,800 S.F.
    SUBDRAIN, LONGITUDINAL, (SHLD) 4"     660.8 L.F.
    SUBDRAIN OUTLET (RF-19C)     6 Each
    RM SWR G-MAIN, TRENCHED, RCP, 2000D, 12"     365 L.F.
    RMVL OF PAV'T     3,552 S.Y.
    SIDEWALK, PCC, 5"     250.4 S.Y.
    PAINTED PAV'T MARK, WATERBORNE/SOLVENT     29.11 STA.
    SEED+FERTILIZE (URBAN)     6 Acres
    LIGHT POLE AND BASE, COMPLETE     3 Each
    ELECTRICAL SERVICE TO MAIN BOAT RAMP, COMPLETE     1 L.S.
    SHELTER AND SWINGSET DEMOLITION     1 L.S.
    BRIDGE PLANKS - 3" X 12"     735 L.F.
    STORMCEPTOR (OSR-560)     1 Each
    BENCHES, COMPLETE     8 Each
    40'X65' SHELTER, COMPLETE     1 Each
Replace Main Boat Ramp (Non-P&I) 
    EXCAVATION, CL 10, RDWY+BORROW     5,538 C.Y.
    MODIFIED SUBBASE     708 C.Y.
    STD/S-F PCC PAV'T, CL A CR STONE     4,248 Tons
    3/8" MINUS AGGREGATE     51 Tons
    ENGINEERING FABRIC     997 S.Y.
    REVETMENT, CLASS D     935 Tons
    2" STONE     16 Tons
Campground Boat Ramp 
    EXCAVATION, CL 10, RDWY+BORROW     2,870 C.Y.
    3/8" MINUS AGGREGATE     12 Tons
    GRANULAR SURF ON RD, CL A CR STONE     1,126.1 Tons
    STRUCT CONC (MISCELLANEOUS)     23.85 C.Y.
    ENGINEER FABRIC     298 S.Y.
    REVETMENT, CLASS D     295 Tons
Lodge Parking (P&I) 
    EXCAVATION, CL 10, RDWY+BORROW     5,249 C.Y.
    MODIFIED SUBBASE     548 C.Y.
    SHLD CONSTRUCTION, EARTH     15.47 STA.
    STD/S-F PCC PAV'T, CL A CL 2, 7"     2,742 S.Y.
    POROUS BACKFILL     181 Tons
    INTAKE, SW-512, 18"     2 Each
    SUBDRAIN, LONGITUDINAL, (SHLD) 4"     626.06 L.F.
    STD, PERFORATED, 8"     309 L.F.
    SUBDRAIN OUTLET (RF-19C)     4 Each
    RM SWR G-MAIN, TRENCHED, RCP 2000D, 12"     118 L.F.
    ENGINEER FABRIC     1,008 S.Y.
    RMVL OF PAV'T     3,290 S.Y.
    NATIVE GRASS SEEDING     0.5 Acres
    ELECTRICAL SERVICE TO LODGE PARKING, COMPLETE     1 L.S.
    SOIL MATRIX     280 C.Y.
Lodge Parking (Non-P&I) 
    EXCAVATION, CL 10, RDWY+BORROW     1,414 C.Y.
    MODIFIED SUBBASE     502 C.Y.
    STD/S-F PCC PAV'T, CL A CL 2, 7"     3,011 S.Y.
Replace Main Boat Ramp (Non-P&I) 
    PAINTED PAV'T MARK, WATERBORNE/SOLVENT     28.77 STA.
Lights for Lodge Parking 
    LIGHT POLE AND BASE, COMPLETE     4 Each
Boat Ramp Pit Toilet 
    PRECAST CONCRETE SINGLE PIT LATRINE     1 Each
Main Road Pavement (P&I) 
    EXCAVATION, CL 10, RDWY+BORROW     9,853 C.Y.
    MODIFIED SUBBASE     7,811.4 C.Y.
    SHLD CONSTRUCTION, EARTH     349.84 STA.
    STD/S-F PCC PAV'T, CL A CL 2, 7"     38,984.6 S.Y.
    APRON, CONC, 24"     22 Each
    ARPON, CONC, 30"     2 Each
    APRON, CONC, 48"     1 Each
    CULV, CONC RDWY PIPE, 24"     1,005 L.F.
    CONC, RDWY PIPE, 30"     161 L.F.
    CULV, CONC RDWY PIPE, 48"     100 L.F.
    SUBDRAIN, LONGITUDINAL, (SHLD) 4"     31,085.14 L.F.
    SUBDRAIN OUTLET (RF-19C)     104 Each
    RMVL OF PAV'T     41,212 S.Y.
    SEED+FERTILIZE (URBAN)     15 Acres
    24" JOINT BLOCK     2 Each
    30" JOINT BLOCK     2 Each
    48" JOINT BLOCK     1 Each
    48" RISER     1 Each
Main Road Pavement (Non-P&I) 
    EXCAVATION, CL, 10, RDWY+BORROW     283 C.Y.
    MODIFIED SUBBASE     284 C.Y.
    STD/S-F PCC PAV'T, CL A CL 2, 7"     1,700 S.Y.
Campground Grading and Utilities 
    EXCAVATION, CL 10, RDWY+BORROW     300 C.Y.
    DUMPSTATION, COMPLETE     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LINN -- PROJECT # 12-06-57-03                10/18/2012                Large Project Letting
PLEASANT CREEK STATE REC AREA
CAMPGROUND AND SHELTER ELECTRIC
Proposal Guarantee: $5,000
Completion Date: 5/24/2013

   Project consists of the reconfiguration and addition of camp pads in Campground 2, construction of new 50-amp electric service, addition of two full service campsites in campground 2, construction of one full service campsite in campground 1, electric lights and receptacles in the North and East shelters, replacement and the addition of yard hydrants in campground 2 and at the cabin area, water line repair and drinking fountain replacement at the shower buildings in campgrounds 1 and 2, site restoration and incidental items as required by the project documents and the IDNR construction inspector.

ESTIMATED QUANTITIES:
 
    Camp Pad Excavation, Class 10     847 C.Y.
    Macadam Stone Base Material, 5"     975 Tons
    Granular Surfacing, Crushed Limestone, 2" Depth     400 Tons
    Engineering Fabric     2,770 S.Y.
    4" Dia PVC SDR 35 Sewer Pipe, with Detectable Warning Tape     203 L.F.
    RV to Sanitary Sewer Hook-up Assembly     3 Each
    8" x 8" x 4" Wye connections     3 Each
    1" HDPE Water Service Line, with Detectable Warning Tape     500 L.F.
    1" Curb Stop/Valve Box     9 Each
    Yard Hydrants - New     9 Each
    Shelter LED Lighting Fixtures, including Power Receptacles     4 Each
    Conection to Transformers     4 Each
    Pad Mounted 600 Amp Distribution Panel, Complete     1 Each
    Pad Mounted 400 Amp Distribution Panel, Complete      1 Each
    Pad Mounted 100 Amp Distribution Panel, Complete      2 Each
    Campsite Outlet Post (Metallic Power Center), 50 Amp, Installed     30 Each
    Campsite Outlet Post (Metallic Power Center), 50 Amp, Spare      1 Each
    Trench, Single Circuit Secondary     3,943 L.F.
    Trench, Double Circuit Secondary      22 L.F.
    Detectable Warning Tape, 3" Electrical     3,987 L.F.
    roadway Crossing Conduit, Schedule80 PVC     111 L.F.
    No. 6 AWG Grounding Conductor, Type THW or USE      360 L.F.
    No. 2 AWG Grounding Conductor, Type THW or USE      2,804 L.F.
    No. 4 AWG Single Conductor Cable, Type USE      210 L.F.
    No. 1 AWG Single Conductor Cable, Type USE      3,582 L.F.
    No. 3/0 AWG Single Conductor Cable, Type USE      1,812 L.F.
    No. 4/0 AWG Single Conductor Cable, Type USE      2,376 L.F.
    250 AWG Single Conductor Cable, Type USE      1,488 L.F.
    300 AWG Single Conductor Cable, Type USE      2,736 L.F.
    Drinking FountainRepalcement/Repair     2 Each
    Remove and Dispose Existing Fire Rings     42 Each
    Remove and Dispose Existing Yard Hydrants     2 Each
    Remove and Dispose Existing Drinking Fountains     2 Each
    Remove and Dispose Existing Electric Campsite Pedestals     16 Each
    Surface Restoration- Seeding, Fertilizing, & Mulching     1 L.S.
    Storom Water Pollution Prevention Plan (SWPPP)     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LYON -- PROJECT # 10-01-60-03                10/18/2012                Large Project Letting
KLONDIKE DAM
REMOVE DAM, CONSTRUCT RAPIDS
Proposal Guarantee: $15,000
Completion Date: 3/1/2013

   This project is for the removal of the Klondike Dam in Lyon County Iowa. This low head dam will be converted to rapids with miscellaneous channel dredging, earthwork and large stone placement. The stone will be supplied through others with a separate contract.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Dam Removal     1 L.S.
    Base Stone Placement Only(2.6 or greater specific gravity & 50% medial diameter 2.3' or greater)     15,300 Tons
    Weir Stone Placement Only (2.6 or greater specific gravity & 50% medial diameter 3' or greater)     1,500 Each
    Crushed Stone Fill 6" minus material Placement only     1,600 Tons
    Seed, Fertilize, & Mulch     0.5 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LYON -- PROJECT # 12-01-60-01                10/18/2012                Large Project Letting
OTHER - KLONDIKE DAM
KLONDIKE DAM MITIGATION ROCK
Proposal Guarantee: $35,000
Completion Date: 3/1/2013

   This project consists of stockpiling and delivering on demand various gradations of stone to the Klondike Dam Site and incidental work as required by the Specifications and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Base Stone supply & deliver (2.6 or greater specific gravity & 50% medial diameter 2.3' or greater)     15,300 Tons
    Weir Stone supply & deliver (2.6 or greater specific Gravity & 50% medial diameter 3' or greater)     1,500 Each
    Crushed Stone Fill 6" minus material supply & deliver     1,600 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POLK -- PROJECT # 10-02-77-09                10/18/2012                Large Project Letting
BIG CREEK ENFORCEMENT
STORAGE AND OFFICE BUILDING
Proposal Guarantee: $15,000
Completion Date: 7/31/2013

   This project consists of the construction of a one story, pre-engineered structural insulated panel (SIP) building and post-frame building with metal roofing and metal siding, approximately 40' x 106', including one (1) heated bay and four (4) cold storage bays. The work also includes concrete and crushed stone paving, concrete paving and electrical services.

ESTIMATED QUANTITIES:
    ON-SITE TOPSOIL (STRIP, SALVAGE & RESPREAD)     660 C.Y.
    EXCAVATION CLASS 10 (INCLUDES 580 CY BORROW)     940 C.Y.
    MODIFIED SUBBASE     65 Tons
    WATER SERVICE     1 Each
    12" RCP     114 L.F.
    12" CONCRETE PIPE APRON     6 Each
    6" PCC PAVEMENT     308 S.Y.
    GRANULAR SURFACING     362 Tons
    CONVENTIONAL SEEDING (NATIVE GRASS & WILDFLOWER)     0.4 Acres
    SILT FENCE     310 L.F.
    ELECTRIC SERVICE     1 Each
    BUILDING (SIPS & POST-FRAME) & ALL BUILDING RELATED ITEMS     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JACKSON -- PROJECT # 12-06-49-04                9/27/2012                Small Project Letting
BELLEVUE FISHERIES STATION
RAMP REPAIR/WORK
Proposal Guarantee: $0
Completion Date: 10/15/2012

   Install approx 1600 square feet of ArmorFlex Articulating Concrete Block (ACB) 50S series, including all necessary site prep, around an existing boat ramp.

Contact:
Bruce Flippin

[email protected]




JACKSON -- PROJECT # 12-03-49-02                9/27/2012                Small Project Letting
BELLEVUE STATE PARK
REPLACE ROOF
Proposal Guarantee: $0
Completion Date: 10/26/2012

   Remove and replace shingles, flashings, ridge vent and roof sheathing. Approx 26 Square

Contact:
Bruce Flippin

[email protected]




TAYLOR -- PROJECT # 13-04-87-02                9/27/2012                Small Project Letting
LAKE OF THREE FIRES STATE PARK
SHORELINE ARMORING
Proposal Guarantee: $0
Completion Date: 11/28/2012

   Repair 950 feet of the existing shorline riprap on the 5 fishing jetties and around the beach using screened Class "D" riprap.

Contact:
Mark Johnson
515-250-3713
[email protected]




GUTHRIE -- PROJECT # 13-04-39-02                10/4/2012                Small Project Letting
SPRINGBROOK STATE PARK
BOAT RAMP SHORELINE
Proposal Guarantee: $0
Completion Date: 11/28/2012

   Repair 595 feet of the existing shorline riprap on the boat ramp and around the dam using screened Class "E" riprap.

Contact:
Mark Johnson
515-250-3713
[email protected]




JONES -- PROJECT # 12-06-53-03                10/25/2012                Small Project Letting
MUSKRAT SLOUGH
DIKE DESIGN AND CONSTRUCTION
Proposal Guarantee: $0
Completion Date: 12/15/2012

   This project consists of the construction of an approximately 550 CY impoundment with the inclusion of a 12' deep water control structure and associated inlet/outlet piping.

Contact:
Bruce Flippin

[email protected]