PROJECTS LETTING -  September , 2022

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DES MOINES 22-06-29-01 Geode State Park - Reconstruct Beach/Boat Ramp Parking Lot-2022-09-22   Bid Completion detail
FREMONT 21-04-36-01 Botna Bottoms WMA - Botna Bottoms Tree Clearing, Levee and WCS Repair -2022-09-22   Bid Completion detail
JOHNSON 22-06-52-01 Lake Macbride State Park - North Shore Parking Lot Extension-2022-09-22   Bid Completion detail
MUSCATINE 23-06-70-02 Fairport Fisheries Management Unit - Pavilion Pavement and Parking Area-2022-09-22   Bid Completion detail
WARREN 22-05-91-07 Lake Ahquabi State Park - Beach and Shelter Restroom-2022-09-22   Bid Completion detail
BENTON 22-06-06-01 Dudgeon Lake Wildlife Management Area - Road Maintenance-2022-09-29   Bid Completion detail
CERRO GORDO 23-03-17-01 Clear Lake District Office - Masonry Repair-2022-09-29   Bid Completion detail
DICKINSON 20-01-30-10 Triboji Beach - Shoreline Armoring-2022-09-29   Bid Completion detail
MONONA 23-01-67-02 Winnebago Bend Missouri River Access - Winnebago Bend Boat Ramp Extension-2022-09-29   Bid Completion detail
CLAY 23-01-21-02 Dewey's Pasture WMA - Smith Slough Road Maintenance - Culverts-2022-10-13   Bid Completion detail
APPANOOSE 22-05-04-09 Rathbun Wildlife Unit - Sedan Bottoms Office Utilities REBID-2022-10-20   Bid Completion detail
BUENA VISTA 23-01-11-01 Storm Lake Marina - Dock Installation and Site Repairs-2022-10-20   Bid Completion detail
CLAY 23-01-21-03 Dewey's Pasture WMA - Smith Slough Road Maintenance-2022-10-20   Bid Completion detail
DICKINSON 22-01-30-05 Trappers Bay State Park - Shelter Restoration-2022-10-20   Bid Completion detail
JACKSON 23-02-49-02 Bellevue State Park, Dyas Unit - Pavement Maintenance-2022-10-20   Bid Completion detail
JASPER 21-05-50-03 Rock Creek State Park - Sanitary Sewer Liner-2022-10-20   Bid Completion detail
MONONA 21-01-67-04 Lewis and Clark State Park - Visitor Center Repairs - REBID-2022-10-20   Bid Completion detail
WASHINGTON 23-06-92-01 Lake Darling State Park - Lodge HVAC Replacement-2022-10-20   Bid Completion detail




DES MOINES -- PROJECT # 22-06-29-01                9/22/2022                Large Project Letting
GEODE STATE PARK
RECONSTRUCT BEACH/BOAT RAMP PARKING LOT
Proposal Guarantee: $100,000
Completion Date: 9/29/2023

   This project consists of reconstructing parking lots with PCC pavement.

ESTIMATED QUANTITIES:
    Clearing and Grubbing     1 L.S.
    Remove Existing Pavement and Base     9,561 S.Y.
    Storm Sewer Abandonment, Fill+Plug, Less Than 36"     252 L.F.
    Remove Existing Revetment     1,530 C.Y.
    Remove Existing Intake     2 Each
    Remove Curb and Gutter     4.2 STA.
    Painted Pavement Mark, High-Build Waterborne     73 STA.
    Painted Symbol+Legend, High-Build Waterborne     3 Each
    Pavement, 7" PCC     10,777 S.Y.
    Earth Shoulder     15.6 STA.
    Special Backfill     1,906 C.Y.
    Curb and Gutter, PCC, 2.5'     337 L.F.
    Intake, SW-501     2 Each
    Intake, SW-511     2 Each
    Manhole, SW-401 (48")     1 Each
    Storm Sewer, PVC, 6"     82.2 L.F.
    Storm Sewer, Reinforced Concrete Pipe, 12"     407 L.F.
    Storm Sewer, Reinforced Concrete Pipe Apron, 12"     1 Each
    Sidewalk, 6" PCC     136 S.Y.
    Excavation, Class 10, Roadway and Borrow     52 C.Y.
    Excavation, Class 10, Waste     3,428 C.Y.
    Seeding, Fertilizing, and Mulching     0.4 Acres
    Filter Sock, 8"     1,100 L.F.
    Signing     2 Each
    Bollards     1 Each
    NPDES General Permit #2 & SWPPP     1 L.S.
    Construction Staking     1 L.S.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JOHNSON -- PROJECT # 22-06-52-01                9/22/2022                Large Project Letting
LAKE MACBRIDE STATE PARK
NORTH SHORE PARKING LOT EXTENSION
Proposal Guarantee: $25,000
Completion Date: 9/29/2023

   This project consists of constructing a PCC parking lot extension.

ESTIMATED QUANTITIES:
    Clearing and Grubbing     1 L.S.
    Painted Pavement Mark, High-Build Waterborne     15 STA.
    Pavement, 7" PCC     2,671 S.Y.
    Earth Shoulder     6 STA.
    Special Backfill     2,821 C.Y.
    Sidewalk, 6" PCC     3 S.Y.
    Detectable Warning Panel     10 S.F.
    Excavation, Class 10, Roadway and Borrow     521 C.Y.
    Embankment-In-Place, Contractor Furnish     26 C.Y.
    Seeding, Fertilizing, and Mulching     0.4 Acres
    Filter Sock, 8"     645 L.F.
    Signing     1 Each
    Precast Concrete Parking Wheel Stops     1 Each
    NPDES General Permit #2 & SWPPP     1 L.S.
    Construction Staking     1 L.S.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WARREN -- PROJECT # 22-05-91-07                9/22/2022                Large Project Letting
LAKE AHQUABI STATE PARK
BEACH AND SHELTER RESTROOM
Proposal Guarantee: $25,000
Completion Date: 5/31/2023

   Lake Ahquabi is undergoing an extensive renovation of the entire Park and this project will add a restroom for the Beach at the existing Concession Building. Four new family-style restroom stalls will be added to the existing concession building. A new shower tower will be installed adjacent to this building. At the historic Beach Shelter, the restroom will be remodeled to make it more functional for the shelter patrons. The historic structure will also undergo a restoration, rotten beams and purlins will be replaced, and all wood stained, while stone will be carefully cleaned. New lights will be installed in the shelter and site lighting will also be replaced. Also, a new ADA kayak launch will be installed by the contractor an existing dock.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Demolition     1 L.S.
    Shelter Complex Log Tail/Beam Replacement     10 Each
    Shelter Complex Log Tail Epoxy Repair     20 Each
    Shelter Complex Soda Blasting and Sanding     1 L.S.
    Shelter Complex Wood Staining and Finishing     1 L.S.
    Shelter Restroom and Accessories     1 L.S.
    Shelter Complex Shelter Stone Replacement     5 Each
    Shelter Complex Wall Cap Replacement     1 Each
    Concrete Stoops and Sidewalks     1 L.S.
    Concession Block Restroom Building and Accessories     1 L.S.
    Electrical     1 L.S.
    Site Lighting     6 Each
    Mechanical/Plumbing     1 L.S.
    Shower Tower     1 Each
    Kayak Launch     1 Each
    Coiling Overhead Door Repair and Crowbar Shield     1 L.S.
    Drain-Down Pit     1 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BUENA VISTA -- PROJECT # 23-01-11-01                10/20/2022                Large Project Letting
STORM LAKE MARINA
DOCK INSTALLATION AND SITE REPAIRS
Proposal Guarantee: $12,500
Completion Date: 5/12/2023

   Storm Lake Marina was constructed in 2008 and the current dock system is original. This dock system is old and in need of replacement. A new dock system by EZ Dock shall be installed in this project with new electrical panels, site lighting, sidewalks and stoop footing approaches.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Demolition     1 L.S.
    Concrete Stoops and Sidewalks     1 L.S.
    Dock Installation and All Associated Items     1 L.S.
    Site Lighting, Bases, and All Associated Items     3 Each
    Electrical, Panels, and All Associated Items     1 L.S.
    Iowa DOT Class D Revetment     10 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CLAY -- PROJECT # 23-01-21-03                10/20/2022                Large Project Letting
DEWEY'S PASTURE WMA
SMITH SLOUGH ROAD MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 6/30/2023

   This project consists of HMA pavement maintenance; crack cleaning/filling/sealing, transverse joint repair, patching and fog sealing.

ESTIMATED QUANTITIES:
    2102 - EXCAVATION, CL 10, RDWY+BORROW     29 C.Y.
    2115 - MODIFIED SUBBASE     53 Tons
    2306 - ASPH EMULSION-FOG SEAL (PAV'T)     635 GAL.
    2518 - SAFETY CLOSURE     2 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2529 - PATCHES, FULL-DEPTH FINISH, BY AREA. 6" HMA     174 S.Y.
    2529 - PATCHES, FULL-DEPTH FINISH, 6-IN., BY COUNT, HMA     7 Each
    2533 - MOBILIZATION     1 L.S.
    2541 - CRACK AND JOINT CLEANING AND SEALING (HMA SURFACES)     1.41 MI.
    2541 - SEALER MATERIAL (HMA SURFACES)     1,033 LB.
    2543 - TRANSVERSE JOINT REPAIR     71 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JACKSON -- PROJECT # 23-02-49-02                10/20/2022                Large Project Letting
BELLEVUE STATE PARK, DYAS UNIT
PAVEMENT MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 7/31/2023

   This project consists of pavement preservation; crack cleaning and filling, patching, and fog sealing at Bellevue State Park, Dyas Unit.

ESTIMATED QUANTITIES:
    Bituminous Fog Seal (HMA Pavement) (2306)     3,402 GAL.
    Patches, Full-Depth Finish, 5-inch, By Area, HMA (2529)     186 S.Y.
    Patches, Full-Depth Finish, 5-inch, By Count, HMA (2529)     9 Each
    Transverse Joint Repair (2543)     67 Tons
    Cleaning and Filling Cracks (HMA Surfaces) (2541)     2.23 MGAL
    Sealer Material (HMA Surfaces) (2541)     2,230 LB.
    Modified Subbase (2115)     31 C.Y.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JASPER -- PROJECT # 21-05-50-03                10/20/2022                Large Project Letting
ROCK CREEK STATE PARK
SANITARY SEWER LINER
Proposal Guarantee: $12,500
Completion Date: 11/30/2023

   This project consists of rehabilitating gravity sewer lines by CIPP lining and replacement.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    CIPP Sewer lining     2,549 L.F.
    Point Repairs     10 Each
    Replace pipe with 6 inch PVC SDR 35     38 L.F.
    Site Restoration & Seeding     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




FREMONT -- PROJECT # 21-04-36-01                9/22/2022                Small Project Letting
BOTNA BOTTOMS WMA
BOTNA BOTTOMS TREE CLEARING, LEVEE AND WCS REPAIR
Proposal Guarantee: $4,000
Completion Date: 3/15/2023

   This project involves clearing and grubbing 2 acres of trees, shrubs and vegetation's along the levee. lowering a 2,500 linear foot levee by cutting off approximately 3 feet from the top. Also rebuilding two washed out areas along the levee and installing two 5' tall flashboard risers to fit 36"Dia.cmp.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




MUSCATINE -- PROJECT # 23-06-70-02                9/22/2022                Small Project Letting
FAIRPORT FISHERIES MANAGEMENT UNIT
PAVILION PAVEMENT AND PARKING AREA
Proposal Guarantee: $0
Completion Date: 12/2/2022

   This project includes constructing a concrete slab with foundations and footings for a future 18' x 22' pavilion and an adjacent 16' x 20' concrete parking area with minor grading.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




BENTON -- PROJECT # 22-06-06-01                9/29/2022                Small Project Letting
DUDGEON LAKE WILDLIFE MANAGEMENT AREA
ROAD MAINTENANCE
Proposal Guarantee: $0
Completion Date: 12/16/2022

   Project consists of blading and shaping approximately 3,200 LF of a gravel road, placement of 620 tons of new Class A rock and some minor ditch grading.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




CERRO GORDO -- PROJECT # 23-03-17-01                9/29/2022                Small Project Letting
CLEAR LAKE DISTRICT OFFICE
MASONRY REPAIR
Proposal Guarantee: $0
Completion Date: 5/26/2023

   Clear Lake District Office is an addition onto a historic Fish Hatchery structure over 100 years old. This building is constructed from brick and decorative limestone accents. Some of the brick is broken and in need of replacement and the entire structure needs to be repointed. The limestone accents need to be repaired and the whole building needs a thorough cleaning. Plan and proposal may be obtained by emailing Melvin.pacovsky@dnr.iowa.gov your company name, address, and phone number

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




DICKINSON -- PROJECT # 20-01-30-10                9/29/2022                Small Project Letting
TRIBOJI BEACH
SHORELINE ARMORING
Proposal Guarantee: $0
Completion Date: 4/14/2023

   This project is designed to stop bank erosion by adding fieldstone revetment to select sections of shoreline at Triboji Beach (West Lake Okoboji) in Dickinson County, IA. Work under this contract involves supply and installation of 225 TN of fieldstone along approximately 275 lineal feet of shoreline and replacement of 125 SF of undercut beach sidewalk. Contact Jeff Felts for project information.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




MONONA -- PROJECT # 23-01-67-02                9/29/2022                Small Project Letting
WINNEBAGO BEND MISSOURI RIVER ACCESS
WINNEBAGO BEND BOAT RAMP EXTENSION
Proposal Guarantee: $0
Completion Date: 3/17/2023

   This project is designed to add a 16' x 20' section of 6" thick reinforced PCC boat ramp to the end of the existing ramp at the Winnebago Bend Access to the Missouri River in Monona County. Work under this contract includes grading work for the ramp extension, temporary fill (onsite) for a push in ramp section, reinforced PCC paving, and riprap protection of the new slab. Contact Jeff Felts for plans. This project has an estimated cost of $26,000

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




CLAY -- PROJECT # 23-01-21-02                10/13/2022                Small Project Letting
DEWEY'S PASTURE WMA
SMITH SLOUGH ROAD MAINTENANCE - CULVERTS
Proposal Guarantee: $0
Completion Date: 5/15/2023

   This project is designed to replace three existing roadway crossing culverts on the Smith Slough roadway within the Dewey's Pasture WMA, Clay County. Work under this contract includes removal of the existing pavement and triple CMP crossing pipes, then replacement with three reinforced concrete pipes (RCP) and new PCC paving. Other work to grade, bed, backfill and prepare a roadway base for paving is also included. Contact Jeff Felts to obtain project documents.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




APPANOOSE -- PROJECT # 22-05-04-09                10/20/2022                Small Project Letting
RATHBUN WILDLIFE UNIT
SEDAN BOTTOMS OFFICE UTILITIES REBID
Proposal Guarantee: $0
Completion Date: 4/30/2023

   This project consists of utility services for a new office including water, electricity, septic system, and ADA parking. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




DICKINSON -- PROJECT # 22-01-30-05                10/20/2022                Small Project Letting
TRAPPERS BAY STATE PARK
SHELTER RESTORATION
Proposal Guarantee: $0
Completion Date: 7/28/2023

   This project is the first phase of the restoration of a CCC shelter at Trappers Bay State Park, Dickinson County, IA. Demo work includes the removal of all roofing, underlayment, and flashing. Following demo, inspection of purlins and beams for rot, trimming of purlins as necessary, power-washing, and staining of all wood will be required. New 2x6 T&G roof decking along with asphalt shingles and new copper flashing is also included under this contract. Contact Jeff Felts to obtain contract documents.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




MONONA -- PROJECT # 21-01-67-04                10/20/2022                Small Project Letting
LEWIS AND CLARK STATE PARK
VISITOR CENTER REPAIRS - REBID
Proposal Guarantee: $0
Completion Date: 5/19/2023

   This project is designed to replace all of the exterior siding and address issues with veneer stone on the Visitor Center at Lewis & Clark State Park. The scope of work includes siding and veneer stone removal and replacement, new building wrap, new exterior flashing, 1 window replacement, and other minor repairs on the exterior of the building. Contact Jeff Felts to obtain plans and specifications.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




WASHINGTON -- PROJECT # 23-06-92-01                10/20/2022                Small Project Letting
LAKE DARLING STATE PARK
LODGE HVAC REPLACEMENT
Proposal Guarantee: $0
Completion Date: 3/31/2023

   The Lake Darling Lodge was constructed in 2008 with a Geo-Thermal HVAC system. This HVAC system was configured differently than what would be installed today and the system has lived beyond it's expected life. This project will remove all existing HVAC equipment and glycol solution, the existing duct work and geo-thermal wells shall remain in place. The contractor shall install new HVAC air-handlers, geo circulation pumps, buffer tanks, all new copper piping with armaflex insulation, aquastat controls and new CPU, and flush and refill entire Glycol water mixture.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov