PROJECTS LETTING -  September , 2016

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

APPANOOSE 17-05-04-03 Honey Creek State Park - House Renovations-2016-09-22   Bid Completion detail
JACKSON 17-06-49-01 Green Island WMA - Maquoketa Wildlife Unit - New Roof-2016-09-22   Bid Completion detail
MUSCATINE 16-06-70-01 Fairport State Recreation Area - Crack Sealing and Slurry Seal-2016-09-22   Bid Completion detail
POLK 16-05-77-03 Iowa State Fairgrounds - Aquarium Renovation Project-2016-09-22   Bid Completion detail
POLK 16-02-77-02 Olofson Shooting Range - Training Center & Range Renovation-2016-09-22   Bid Completion detail
POLK 16-02-77-02 Olofson Shooting Range - Training Center & Range Renovation-2016-09-22   Bid Completion detail
SAC 17-01-81-02 Black Hawk Lake - Fishing Pier Repairs-2016-09-22   Bid Completion detail
VAN BUREN 16-06-89-01 Lacey-Keosauqua State Park - Culvert Replacement-2016-09-22   Bid Completion detail
DICKINSON 16-01-30-01 Great Lakes Wildlife Unit - Apple Jack Marsh/West Okoboji -2016-10-06   Bid Completion detail
MITCHELL 17-03-66-01 Rock Creek - Wrage Low Water Crossing-2016-10-13   Bid Completion detail
WEBSTER 16-02-94-02 Gypsum City OHV Park - Corridor Project-2016-10-13   Bid Completion detail
MADISON 15-04-61-02 Badger Creek State Recreation Area - Sediment Basins-2016-10-20   Bid Completion detail
O'BRIEN 17-01-71-01 Great Lakes Wildlife Unit - Waterman Wetland / Tile Repair -2016-10-20   Bid Completion detail
UNION 15-04-88-02 Green Valley - Raise west silt dike-2016-10-20   Bid Completion detail
VAN BUREN 14-06-89-01 Lacey-Keosauqua State Park - Des Moines River Bank Armoring-2016-10-20   Bid Completion detail




POLK -- PROJECT # 16-05-77-03                9/22/2016                Large Project Letting
IOWA STATE FAIRGROUNDS
AQUARIUM RENOVATION PROJECT
Proposal Guarantee: $10,000
Completion Date: 5/15/2017

   This project consists of renovating the aquarium hardware at the State Fairgrounds.

ESTIMATED QUANTITIES:
    Aquarium Upgrade     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POLK -- PROJECT # 16-02-77-02                9/22/2016                Large Project Letting
OLOFSON SHOOTING RANGE
TRAINING CENTER & RANGE RENOVATION
Proposal Guarantee: $30,000
Completion Date: 12/30/2017

   Butch Olofson Shooting Range located in Polk County, Iowa will be reconstructed with a new building, new firing line shelters and re-grading of the backstop berms. Construction will include a new training center and retail facility, enlarging the backstop berms, installing a storm sewer system, new portland cement sidewalks, new firing line structures and a new garage.

ESTIMATED QUANTITIES:
    Grading     1 L.S.
    Seeding, Fertilizing and Mulching     4 Acres
    ScourStop Outlet Protection     16 S.F.
    8-inch Filter Sock     100 L.F.
    5-inch Reinforced PCC Sidewalk     166.5 S.Y.
    Granular Subbase for PCC Sidewalk     34 Tons
    6-inch PVC SDR 35 Pipe     98 L.F.
    8-inch PVC SDR 35 Pipe     261 L.F.
    10-inch PVC SDR 35 Pipe     198 L.F.
    12-inch Diameter Nyloplast Drain Basin     3 Each
    10-inch Diameter Nyloplast Drain Basin     6 Each
    6-inch Diameter Rat Guard     4 Each
    10-inch Diameter Rat Guard     1 Each
    Replace Grate with Solid Manhole Lid     1 Each
    2-inch HDPE Water Pipe     37 L.F.
    2-inch Curb Stop     1 Each
    Paint Striping and Markings     1 L.S.
    Precast Concrete Parking Wheel Stops     11 Each
    Signage-HC Signs for Parking Spaces     1 L.S.
    Black PVC Coated Chain Link Fencing     1 L.S.
    NPDES General Permit #2 & SWPPP     1 L.S.
    Construction Staking     1 L.S.
    Mobilization     1 L.S.
    Electrical Service (Main Bldg & Stubs to Alternates)     1 L.S.
    Training Center Building     1 L.S.
Alternate
    Storage Garage & Tank Enclosure     1 L.S.
Alternate
    Class 'A' Crushed Stone     39 Tons
Alternate
    Shooting Structure #1 (Incl. Interior Electrical)     1 L.S.
Alternate
    Road Gravel     9.2 Tons
Alternate
    5-inch Reinforced PCC Sidewalk     24 S.Y.
Alternate
    Granular Subbase for PCC Sidewalk     5 Tons
Alternate
    Shooting Structure #2 (Incl. Interior Electrical)     1 L.S.
Alternate
    Road Gravel     9.2 Tons
Alternate
    5-inch Reinforced PCC Sidewalk     14 S.Y.
Alternate
    Granular Subbase for PCC Sidewalk     3 Tons
Alternate
    Shooting Structure #3 (Incl. Interior Electrical)     1 L.S.
Alternate
    Road Gravel     9.2 Tons
Alternate
    5-inch Reinforced PCC Sidewalk     24 S.Y.
Alternate
    Granular Subbase for PCC Sidewalk     5 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




VAN BUREN -- PROJECT # 16-06-89-01                9/22/2016                Large Project Letting
LACEY-KEOSAUQUA STATE PARK
CULVERT REPLACEMENT
Proposal Guarantee: $10,000
Completion Date: 5/15/2017

   THE CULVERT REPLACEMENT PROJECT INCLUDES THE REMOVAL OF FOUR EXISTING 12" METAL PIPES, PCC LOW WATER CROSSING, EXISTING HMA PAVEMENT AND THE INSTALLATION OF DOUBLE 30" EQUIVALENT ARCH REINFORCED CONCRETE PIPES AND INCIDENTAL WORK AS REQUIRED BY THE DNR INSPECTOR.

ESTIMATED QUANTITIES:
    CLEARING AND GRUBBING     1 L.S.
    REMOVAL OF EXISTING STRUCTURE     1 L.F.
    REMOVAL OF EXISTING PIPE     22 L.F.
    REMOVAL OF PAVEMENT     710 S.Y.
    SAW CUTTING EXISTING ASPHALT PAVEMENT     40 L.F.
    PAVING, P.C. CONCRETE, 7"     788 S.Y.
    SHOULDER CONSTRUCTION, EARTH     7 STA.
    SPECIAL BACKFILL     867 S.Y.
    CLASS "A" CRUSHED STONE     11 Tons
    CULVERT, LOW CLEARANCE CONCRETE ROADWAY PIPE, EQUIV. DIAM. 30 IN.     112 L.F.
    APRON, LOW CLEARANCE CONCRETE, EQUIV. DIAM. 30 IN.     4 Each
    APRON GUARD, DR-213     2 Each
    PIPE FOOTING     6 Each
    CULVERT, LOW CLEARANCE CONCRETE ENTRANCE PIPE, EQUIV. DIAM. 18 IN.      22 L.F.
    APRON, LOW CLEARANCE CONCRETE, EQUIV. DIAM. 18 IN.     2 Each
    EXCAVATION, CLASS 10, ROADWAY AND BORROW     31.7 C.Y.
    EXCAVATION, CLASS 20     10 C.Y.
    EMBANKMENT-IN-PLACE     248.5 C.Y.
    FLOWABLE MORTAR     18.4 C.Y.
    FLOODED BACKFILL     93.6 C.Y.
    ROCK CHECK DAM     24 L.F.
    REVETMENT, CLASS E     40 Tons
    FINISH GRADING     1 L.S.
    SEEDING, FERTILIZING AND MULCHING     0.11 Acres
    EROSION CONTROL     895 L.F.
    TRAFFIC CONTROL     1 L.S.
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MADISON -- PROJECT # 15-04-61-02                10/20/2016                Large Project Letting
BADGER CREEK STATE RECREATION AREA
SEDIMENT BASINS
Proposal Guarantee: $10,000
Completion Date: 8/15/2017

   Construction of 5 sediment basins and other incidental work as required by the IDNR construction inspector.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    6" DIA. SMOOTH METAL PIPE     802 L.F.
    6" DIA. DUAL WALL PE CONDUIT     216 L.F.
    8" DIA. DUAL WALL PE CONDUIT     204 L.F.
    6" DIA. PERFORATED STAND PIPE     16 L.F.
    TRASH RACK / BAR GUARD ASMBLY (6")     3 Each
    4'X4'x1/4" ANTISEEP     6 Each
    5'X5'x1/4" ANTISEEP     7 Each
    6" GATE VALVE     1 Each
    EARTHWORK/FILL/GRADE/STRIPPING     46,563 C.Y.
    CORE TRENCH     2,310 C.Y.
    SEED & MULCH     3 Acres
    CLEARING & GRUBBING     11 Acres
    ANIMAL GUARD     1 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




UNION -- PROJECT # 15-04-88-02                10/20/2016                Large Project Letting
GREEN VALLEY
RAISE WEST SILT DIKE
Proposal Guarantee: $10,000
Completion Date: 6/1/2017

   The project involves modifying the West silt Dike and stabilizing the North silt dike at Green Valley State Park, Union Co. IA

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    CLASS E REVETMENT     2,866 Tons
    ROCK REMOVAL     511 C.Y.
    MACADAM STONE     182 Tons
    48" DIA. CMP     300 L.F.
    1 1/2" MINUS CHOKE STONE     438 Tons
    SEEDING, FERTILIZING AND MULCHING     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 17-05-04-03                9/22/2016                Small Project Letting
HONEY CREEK STATE PARK
HOUSE RENOVATIONS
Proposal Guarantee: $0
Completion Date: 6/30/2017

   This project consists of new shingles, siding, windows, doors, gutters, and deck for the Park Residence at Honey Creek State Park. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




JACKSON -- PROJECT # 17-06-49-01                9/22/2016                Small Project Letting
GREEN ISLAND WMA - MAQUOKETA WILDLIFE UNIT
NEW ROOF
Proposal Guarantee: $0
Completion Date: 11/23/2016

   Project includes placing a new roof on the headquarters building located at Maquoketa Wildlife Unit within Green Island Wildlife Management Area in Jackson County, Iowa.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




MUSCATINE -- PROJECT # 16-06-70-01                9/22/2016                Small Project Letting
FAIRPORT STATE RECREATION AREA
CRACK SEALING AND SLURRY SEAL
Proposal Guarantee: $0
Completion Date: 11/23/2016

   This project includes cleaning out and sealing cracks and providing an asphalt slurry seal on roads and parking areas (approximately 14,250 SY) within Fairport State Recreation Area Campground in Muscatine County, Iowa. Also includes minor asphalt pavement removal and replacement.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




SAC -- PROJECT # 17-01-81-02                9/22/2016                Small Project Letting
BLACK HAWK LAKE
FISHING PIER REPAIRS
Proposal Guarantee: $0
Completion Date: 12/2/2016

   This project is designed for the removal and replacement of 100 – 3.5’x 5’ polyethylene deck panels and 410 lineal feet of 2”x 6” wood railing with 4”x 4” posts on the fishing pier located on Black Hawk Lake in Sac County. Work includes removal and disposal of the old materials and installation of new components as specified.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




DICKINSON -- PROJECT # 16-01-30-01                10/6/2016                Small Project Letting
GREAT LAKES WILDLIFE UNIT
APPLE JACK MARSH/WEST OKOBOJI
Proposal Guarantee: $0
Completion Date: 6/30/2017

   This project is designed to improve the function of an existing wetland marsh in the Welch Lake wildlife management area (Dickinson Co.) by redirecting water through the system, increasing silt storage capacity, and installing of a rock fish barrier. Work includes dewatering and channel excavation, shallow water wetland excavation, 200’ of Fieldstone fish barrier, and a small amount of wetland dike work.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




MITCHELL -- PROJECT # 17-03-66-01                10/13/2016                Small Project Letting
ROCK CREEK
WRAGE LOW WATER CROSSING
Proposal Guarantee: $0
Completion Date: 11/30/2016

   This project consists of constructing a low water crossing and rock arch rapid on Rock Creek. The contractor shall furnish and place 70 tons of derrick stone as shown in the plans and as directed by the DNR Engineer. Derrick stones shall be placed such that the flat side of the stone is approximately horizontal. The contractor shall furnish and place 45 tons of 6” clean crushed stone as base material for the low water crossing, and shall furnish and place 30 tons 2” minus crushed stone as a surface material. Minor site grading and clearing shall be required as directed by the DNR Engineer. The use of an excavator with a thumb will be required for this project. Please note, this project will occur on private property. Plans may e obtained by emailing name & phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




WEBSTER -- PROJECT # 16-02-94-02                10/13/2016                Small Project Letting
GYPSUM CITY OHV PARK
CORRIDOR PROJECT
Proposal Guarantee: $0
Completion Date: 12/30/2016

   This project is for the construction of a corridor to link together the Phase 1 and Phase 3 areas of the Gypsum City OHV Park near Fort Dodge in Webster County. Work involves demolition, grading and fencing around and under Hwy P59 north of Hwy 20.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




O'BRIEN -- PROJECT # 17-01-71-01                10/20/2016                Small Project Letting
GREAT LAKES WILDLIFE UNIT
WATERMAN WETLAND / TILE REPAIR
Proposal Guarantee: $0
Completion Date: 12/2/2016

   This project is designed to repair an existing tile break and excavate a core trench on an existing wetland dike to stop unwanted water flow from the basin. The project is located on Waterman Prairie in O’Brien County, Iowa. Work includes repair of an 8” HDPE tile, excavation of a 250’ long x 10’ wide core trench, fill and recompaction of the core area, and fill of the eroded hole caused by the tile break.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




VAN BUREN -- PROJECT # 14-06-89-01                10/20/2016                Small Project Letting
LACEY-KEOSAUQUA STATE PARK
DES MOINES RIVER BANK ARMORING
Proposal Guarantee: $0
Completion Date: 12/30/2016

   This project includes placing approximately 2,645 tons of revetment along the bank of the Des Moines River within Lacey-Keosauqua State Park at the Ely Ford historical marker.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov