PROJECTS LETTING -  September , 2011

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DUBUQUE 11-03-31-01 Mines of Spain - 2010 disaster recovery-2011-09-22   Bid Completion detail
DICKINSON 12-01-30-04 Garlock Slough/Ortmeier WMA - Graff Tract Wetland Restoration-2011-09-29   Bid Completion detail
DICKINSON 12-01-30-02 Santee Prairie WMA - Wallace Wetland Restoration-2011-09-29   Bid Completion detail
VAN BUREN 10-06-89-03 Lacey Keosauqua State Park - Televising Sewer Lines-2011-09-29   Bid Completion detail
APPANOOSE 11-05-04-22 Honey Creek Resort - Interpretive Center - Solar Thermal Repair-2011-09-30   Bid Completion detail
APPANOOSE 11-05-04-23 DesJardins Renewable energy project - OEI demonstration grant - Honey Creek-2011-10-05   Bid Completion detail
BUCHANAN 11-03-10-01 Cedar Rock - Replace boat house roof-2011-10-06   Bid Completion detail
DECATUR 12-05-27-01 Little River Lake - Shoreline Riprap and Fish Habitat-2011-10-06   Bid Completion detail
DICKINSON 12-01-30-08 Kettleson-Hogsback Wildlife Management Area - Kettleson-Hogsback Well Replacement -2011-10-06   Bid Completion detail
JACKSON 10-06-49-01 Bellevue State Park - Lagoon repair-2011-10-06   Bid Completion detail
CERRO GORDO 10-03-17-05 McIntosh Woods - Entrance Portals-2011-10-13   Bid Completion detail
POLK 12-02-77-07 Big Creek State Park - Replace Siding at Office-Shop Building-2011-10-17   Bid Completion detail
JACKSON 11-06-49-02 Bellevue State Park - Interpretive Shelter and Panels-2011-10-20   Bid Completion detail
JASPER 10-05-50-04 Rock Creek State Park - dump station replacement(duplicate)-2011-10-20   Bid Completion detail
RINGGOLD 12-04-80-02 Mt Ay rFish Hatchery - Replace Pond 2 Harvest Kettle-2011-10-20   Bid Completion detail
WORTH 12-03-98-01 Silver Lake WMA - Renov/replace outlet add drainp-2011-10-20   Bid Completion detail




APPANOOSE -- PROJECT # 11-05-04-23                10/5/2011                Large Project Letting
DESJARDINS RENEWABLE ENERGY PROJECT
OEI DEMONSTRATION GRANT - HONEY CREEK
Proposal Guarantee: $10,000
Completion Date: 2/24/2012

   This project is more than just a renewable energy pilot. It will give the public hands-on witness to the power of renewable energy. The average state park visitor will get an opportunity to spend a period of time living in a space powered with renewables plus the means for personal exploration about how to make renewables work well. At the same time, measurable energy and cost savings accrue at an important, innovative state facility.

ESTIMATED QUANTITIES:
    10KW Horizontal Wind Turbine with 80ft Mono-pole tower and associated equipment @ Honey Creek Resort     1 L.S.
    Five (5) 1.38kW PV Array & associated equipment @ Honey Creek Resort     1 L.S.
    Install of Energy Measurement System w/ touch screen @ Honey Creek Resort (Siemens System)     1 L.S.
Alternate
    2.76kW PV Array and associated equipment @ EB Lyons     1 L.S.
Alternate
    5.52kW PV Array and associated equipment @ Lewis & Clark State Park     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DECATUR -- PROJECT # 12-05-27-01                10/6/2011                Large Project Letting
LITTLE RIVER LAKE
SHORELINE RIPRAP AND FISH HABITAT
Proposal Guarantee: $60,000
Completion Date: 4/30/2012

   This project consists of building various structures associated with fishing and incidental work as required by the drawings, the DNR Construction Inspector. These structures include fishing jetty repair, underwater fish mounds, spawning beds, underwater terraces, underwater rock shelters, and shoreline armoring. The lake will be drawn down throughout the duration of this project.

ESTIMATED QUANTITIES:
    Class "D" Riprap for Habitat     9,104 Tons
    Riprap Grout     20 C.Y.
    Excavation     7,606 C.Y.
    1/2" Chips     1,469 Tons
    Engineering Fabric for Habitat     320 S.Y.
    Class "D" Shoreline Riprap     41,332.3 Tons
    Shoreline Deepening     6,743 L.F.
    Engineering Fabric for Shoreline     34,025.1 S.Y.
    Class "A" Crushed Stone (FEMA PW664)     32.5 Tons
    Class "D" Riprap (FEMA PW664)     169.4 Tons
    Mobilization     1 L.S.
Alternate
    Engineering Fabric     10,198.7 S.Y.
Alternate
    Class "D" Shoreline Riprap     12,389 Tons
Alternate
    Class "D" Riprap for Habitat     1,350 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JASPER -- PROJECT # 10-05-50-04                10/20/2011                Large Project Letting
ROCK CREEK STATE PARK
DUMP STATION REPLACEMENT(DUPLICATE)
Proposal Guarantee: $5,000
Completion Date: 4/30/2012

   This project consists of the removal of the existing RV dump station at Rock Creek State Park. The old dump station will be replaced with two new disposal stations. The installation and construction of the new disposal stations will involve the trenching, laying, and connection of new water, sanitary sewer, and storm sewer lines. The existing roadway surrounding the dump station will be removed and regraded to allow for proper drainage. A rain garden will be installed to collect rainwater runoff. The roadway will then be paved with concrete. Project will also include any incidental work as required by plans and/or DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Class 13 Excavation     233 C.Y.
    4" PVC Sanitary Pipe     56 L.F.
    Connection to Existing Sewer     1 Each
    SS Manhole     1 Each
    Holding Tank     1 Each
    RV Dump Station     2 Each
    8" Storm Sewer PVC     161 L.F.
    Single Grate Storm Intake     1 Each
    Single Grate Storm Intake w/Manhole     1 Each
    24" Diam. Storm Surface Intake     2 Each
    1" HDPE Water     134 L.F.
    Connect to Existing Water     1 Each
    System Disinfection     1 L.S.
    New Concrete Paving, 6"     1,303.37 S.Y.
    Curb and Gutter     513 L.F.
    Base, 6" Special Backfill     430 Tons
    2" Ball Valve     1 Each
    Locate and Cap Existing Water     1 L.S.
    2" x 1" Tee     4 Each
    Seeding, Fertilizing, Mulch     1 L.S.
    4" Sch. 40 PVC in Rain Garden     1 L.S.
    Removals, as per Plan     1 L.S.
    Mobilization     1 L.S.
    Traffic Control     1 L.S.
    Seeding, Fertilizing, Mulch, Rain Garden     1 L.S.
    Rain Garden Construction     1 L.S.
    2" Water Pipe     73 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WORTH -- PROJECT # 12-03-98-01                10/20/2011                Large Project Letting
SILVER LAKE WMA
RENOV/REPLACE OUTLET ADD DRAINP
Proposal Guarantee: $9,000
Completion Date: 6/1/2012

   The Silver Lake project shall consist of replacing the existing concrete spillway with precast reinforced concrete box culverts (RCBC) and stop logs. The lake will be drained by excavating an 800-foot long channel into the lake from the existing spillway location. The outlet channel shall also be excavated to accommodate a new water control structure (WCS). The WCS includes a steel catwalk, an aluminum fish barrier, stop logs and chain link fencing. A 100-foot long emergency spillway will also be constructed, consisting of an earthen berm armored with geotextile and revetment stone. The project also consists of installing corrugated metal pipe culverts and a precast RCBC culvert for field accesses over the discharge channel.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clearing & Grubbing      1 L.S.
    Discharge Channel Excavate & Level Spoil     500 C.Y.
    Existing Concrete Spillway Removal     1 L.S.
    Lake Channel Excavation 1,900 ft.     4,200 C.Y.
Precast RCBC Barrier/WCS 
    Class 10 Excavation     500 C.Y.
    12' x 4' Precast RCBC     12 L.F.
    12' x 6' Precast RCBC     24 L.F.
    12' x 8' Precast RCBC     24 L.F.
    12' x 10' Precast RCBC     36 L.F.
    Cutoff Walls      65.4 L.F.
    Granular Filter Diaphragm     50 Tons
    Aluminum Fish Barriers     665 LB.
    Aluminum Fish Barrier Rake     1 Each
    Concrete Weir Buttress Wall     12 L.F.
    Stop Log Weir Guides     575 LB.
    Stop Logs Aluminum     1,300 LB.
    Fish Barrier Portable Hoist Assembly     1 Each
    Steel Catwalk 48" Wide     2,100 LB.
    Steel Catwalk 36" Wide     1,930 LB.
    Stainless Steel Protective Screens      150 LB.
    8' Ht. Chainlink Fence & Gates     96 L.F.
    Imported Compacted Fill     800 C.Y.
    Class E Revetment     375 Tons
    Geotextile      1,000 S.Y.
    Geogrid     360 S.Y.
    1/2" Crushed Road Stone     100 Tons
 
    Class 10 Excavation      300 C.Y.
    Imported Compacted Fill     400 C.Y.
    Class E Revetment     120 Tons
    Geotextile      200 S.Y.
    Erosion Control Matting     100 SQ.
    Seeding, Fertilizing, & Mulching      1 Acres
Field Access Culvert (E. of W.C.S.) 
    10' x 5' Precast RCBC     24 L.F.
    10' x 5' Precast End Sections     2 Each
    Class E Revetment     40 Tons
    Geotextile      32 S.Y.
    1/2" Crushed Road Stone     50 Tons
 
    36" C.M.P. 14 GA.     96 L.F.
    36" C.M.P. End Sections     8 Each
    Geotextile      110 S.Y.
    1/2" Crushed Road Stone     50 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DUBUQUE -- PROJECT # 11-03-31-01                9/22/2011                Small Project Letting
MINES OF SPAIN
2010 DISASTER RECOVERY
Proposal Guarantee:
Completion Date: 10/31/2011

   Project consists of repairing & placing crushed stone surfacing on approximately 1535 LF of trails over 7 areas, repairing floating trail bridge , constructing & repairing sream crossings, and removal of dedris. Potential bidders are required to attend a pre-bid site visit on September 13, 2011 at 10 AM. Meeting will start at the Julian Dubuque parking lot.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




DICKINSON -- PROJECT # 12-01-30-04                9/29/2011                Small Project Letting
GARLOCK SLOUGH/ORTMEIER WMA
GRAFF TRACT WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 12/2/2011

   This project is designed to expand the wetland complex known as Garlock Slough in Dickinson County. The majority of the work is on the newly purchased Graff Tract with a portion on the existing Ortmeier Tract. Work under this project includes excavations, earthfill (dike construction), tile breaks, tile installation (multiple sizes), 3 water control structures, and seeding.

Contact:
Jeff Felts
515-250-3712
[email protected]




DICKINSON -- PROJECT # 12-01-30-02                9/29/2011                Small Project Letting
SANTEE PRAIRIE WMA
WALLACE WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 6/29/2012

   This project is designed to create wetland elements on the Wallace Tract of the Santee Prairie Wildlife Management Area in Dickinson County. Work under this project includes earthfill (dike construction), tile investigation, tile breaks, an aluminum toewall structure, and seeding.

Contact:
Jeff Felts
515-250-3712
[email protected]




VAN BUREN -- PROJECT # 10-06-89-03                9/29/2011                Small Project Letting
LACEY KEOSAUQUA STATE PARK
TELEVISING SEWER LINES
Proposal Guarantee:
Completion Date: 12/31/2011

   Televised inspection and light cleaning of sanitary sewer ranging in diameter between 4 inches and 8 inches. Project includes heavy cleaning for removal of grit, sludge, and debris using a combination jet/vac, and root cutting if necessary to complete televised inspection.

Contact:
David Heer
(515) 250-3719
[email protected]




APPANOOSE -- PROJECT # 11-05-04-22                9/30/2011                Small Project Letting
HONEY CREEK RESORT - INTERPRETIVE CENTER
SOLAR THERMAL REPAIR
Proposal Guarantee: $500
Completion Date: 11/30/2011

   Solar thermal repair- Interpretive Center

Contact:
Jason Kruse
(515) 250-3707
[email protected]




BUCHANAN -- PROJECT # 11-03-10-01                10/6/2011                Small Project Letting
CEDAR ROCK
REPLACE BOAT HOUSE ROOF
Proposal Guarantee:
Completion Date: 12/16/2011

   Project consists of replacing boat house roof using EPDM roofing. New shop fabricated copper coping metal, roof edge metal, cover concrete "beams" of the open area, and install opan drains similar to that used on the House, Contractor shall be able to demonstrate similar past experience on Frank Lloyd Wright historical projects.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




DICKINSON -- PROJECT # 12-01-30-08                10/6/2011                Small Project Letting
KETTLESON-HOGSBACK WILDLIFE MANAGEMENT AREA
KETTLESON-HOGSBACK WELL REPLACEMENT
Proposal Guarantee: $0
Completion Date: 11/14/2011

   This project is designed to replace a failing 6"- 300 feet deep well with a 5"- 300 feet deep well at the Kettleson-Hogsback Wildlife Complex in Dickinson County.

Contact:
Jeff Felts
515-250-3712
[email protected]




JACKSON -- PROJECT # 10-06-49-01                10/6/2011                Small Project Letting
BELLEVUE STATE PARK
LAGOON REPAIR
Proposal Guarantee:
Completion Date: 12/30/2011

   This project consists of installing an 8" diameter subdrain around an existing sewage lagoon at Bellevue State Park, along with any incidental work as required by plans and/or DNR inspector.

Contact:
Bruce Flippin
515-689-8009
[email protected]




CERRO GORDO -- PROJECT # 10-03-17-05                10/13/2011                Small Project Letting
MCINTOSH WOODS
ENTRANCE PORTALS
Proposal Guarantee:
Completion Date: 5/31/2012

   Project consists of removing existing portals and constructing new entrance portal using limestone.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




POLK -- PROJECT # 12-02-77-07                10/17/2011                Small Project Letting
BIG CREEK STATE PARK
REPLACE SIDING AT OFFICE-SHOP BUILDING
Proposal Guarantee:
Completion Date: 12/23/2011

   Steel siding replacement at office building.

Contact:
Don Labate
515-250-3714
[email protected]




JACKSON -- PROJECT # 11-06-49-02                10/20/2011                Small Project Letting
BELLEVUE STATE PARK
INTERPRETIVE SHELTER AND PANELS
Proposal Guarantee:
Completion Date: 3/30/2012

   BELLEVUE STATE PARK NELSON UNIT (north) BUILD FOUR-SIDED INTERPRETIVE KIOSK WITH A ROOF STRUCTURE. IN ADDITION TO THE KIOSK, REMOVE ORIGINAL BUTTERFLY GARDEN SIGN AND SET ON A NEW CONCRETE BASE WITH LIMESTONE BRICK FACING.

Contact:





RINGGOLD -- PROJECT # 12-04-80-02                10/20/2011                Small Project Letting
MT AY RFISH HATCHERY
REPLACE POND 2 HARVEST KETTLE
Proposal Guarantee:
Completion Date: 4/4/2012

   Replace the existing pond #2 fish harvest kettle and piping.

Contact:
Mark Johnson
515-250-3713
[email protected]