PROJECTS LETTING -  September , 2023

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

BUTLER 20-03-12-03 Shell Rock Bend WMA - Road Maintenance-2023-09-21   Bid Completion detail
MARION 23-05-63-04 Red Rock WMU/Lake Keomah - Road Maintenance-2023-09-21   Bid Completion detail
MONONA 24-01-67-02 Tieville Bend WMA - Pump Replacement-2023-09-21   Bid Completion detail
TAMA 24-05-86-01 Hickory Hills Park - Casey Lake Restoration-2023-09-21   Bid Completion detail
BREMER 21-03-09-05 Sweet Marsh Wildlife Management Area - Quail Avenue PCC Pavement Maintenance REBID-2023-10-19   Bid Completion detail
BUTLER 21-03-12-01 Big Marsh Wildlife Management Area - PCC Pavement Maintenance-2023-10-19   Bid Completion detail
CERRO GORDO 23-03-17-04 McIntosh Woods State Park - Fish cleaning station-2023-10-19   Bid Completion detail
CERRO GORDO 23-03-17-05 McIntosh Woods State Park - Shelter Roof Replacements-2023-10-19   Bid Completion detail
DICKINSON 24-01-30-01 Silver Lake WMA - Shoreline Stabilization-2023-10-19   Bid Completion detail
LINN 22-06-57-02 Pleasant Creek Recreation Area - Pavement Preservation Phase 2 -2023-10-19   Bid Completion detail




BUTLER -- PROJECT # 20-03-12-03                9/21/2023                Large Project Letting
SHELL ROCK BEND WMA
ROAD MAINTENANCE
Proposal Guarantee: $4,000
Completion Date: 7/30/2024

   This project consists of granular roadway maintenance - blading/shaping, spreading new rock, ditch cleaning, shoulder work, the replacement of one culvert and the installation of one new culvert.

ESTIMATED QUANTITIES:
    2102 - SPECIAL BACKFILL     6 Tons
    2125 - RESHAPING DITCHES - CULVERTS     4 STA.
    2125 - RESHAPING DITCHES - SWAIL     2.5 STA.
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING ROADWAY     25.9 STA.
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING SHOULDERS     25.9 STA.
    2312 - GRANULAR SURFACING ON ROAD, 3-INCH MINUS     633 Tons
    2416 - CULV, CONC RDWY PIPE, 18"     42 L.F.
    2507 - ENGINEERING FABRIC     100 S.Y.
    2507 - EROSION STONE     40 Tons
    2518 - SAFETY CLOSURE     1 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.
    2601 - SEED+FERTILIZE (RURAL)     1 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MARION -- PROJECT # 23-05-63-04                9/21/2023                Large Project Letting
RED ROCK WMU/LAKE KEOMAH
ROAD MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 9/30/2024

   This projects consists of granular roadway maintenance. Blading/shaping, culvert replacement, ditch cleaning and spreading new rock.

ESTIMATED QUANTITIES:
    2125 - RESHAPING/CLEANING DITCHES     5 STA.
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING     205 STA.
    2210 - MACADAM STONE BASE     857 Tons
    2312 - GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE 1-1/4"     535 Tons
    2312 - GRANULAR SURFACING ON ROAD, CRUSHED STONE 3-INCH MINUS     3,038 Tons
    2416 - APRON, CONC, 18"     2 Each
    2416 - CULV, CONC RDWY PIPE, 18"     24 L.F.
    2507 - ENGINEERING FABRIC     20 S.Y.
    2507 - EROSION STONE     16 Tons
    2518 - SAFETY CLOSURE     7 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.
    2552 - REPLACEMENT OF UNSUITABLE BACKFILL MAT'L (CLASS II PIPE BEDDING)      5 C.Y.
    2601 - SEED+FERTILIZE (RURAL)     0.5 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MONONA -- PROJECT # 24-01-67-02                9/21/2023                Large Project Letting
TIEVILLE BEND WMA
PUMP REPLACEMENT
Proposal Guarantee: $6,250
Completion Date: 5/30/2024

   This project consists of installing one 90 HP axial propeller pump into the existing pump station. Installation includes all necessary hardware, wire, and connections to the existing motor control center.

ESTIMATED QUANTITIES:
    Pump, Complete     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




TAMA -- PROJECT # 24-05-86-01                9/21/2023                Large Project Letting
HICKORY HILLS PARK
CASEY LAKE RESTORATION
Proposal Guarantee: $150,000
Completion Date: 3/15/2025

   This project consists of constructing five sediment ponds, three in-lake forebays, mechanically dredging the main lake basin, shoreline armoring, streambank stabilization, and modifying the principal spillway stoplog system.

ESTIMATED QUANTITIES:
    Mobilization & Demobilization     1 L.S.
    Site Preparation and Clearing     1 L.S.
    SWPPP Management     1 L.S.
    Over-Excavation, Core Trench     950 C.Y.
    Over-Excavation, Embankment Top     1,548 C.Y.
    Excavation, Stream Bank Excavation, Haul to BMP 17     1,138 C.Y.
    Topsoil, Strip, Stockpiling & Respread     4,898 C.Y.
    Existing Structure Removal, BMP 3     1 L.S.
    Existing Structure Removal, BMP 7     1 L.S.
    Existing Structure Removal, BMP 12     1 L.S.
    Earthfill, Embankment & Structure Removal Excavation Fill     20,140 C.Y.
    Excavation, Mechanical Dredging Existing BMP – Hardbottom & Soft Sediment     8,306 C.Y.
    6" PVC, Anti Seep Collars, and Trash Racks     119 L.F.
    10" CMP, Anti Seep Collars, and Trash Racks     372 L.F.
    18" CMP & Anti Seep Collars     111 L.F.
    36" CMP Riser and Trash Rack     3 Each
    10" Knife Gate Valves, Stainless Steel     3 Each
    Agridrain Inlet Water Control Structure, 4’ Height, 6" Pipe Connections     1 L.S.
    Agridrain Inlet Water Control Structure, 5’ Height, 10" Pipe Connections     1 L.S.
    Rip Rap, Class ‘E’ with Geotextile Fabric     465 Tons
    Choke/Chink Stone, 1" to 5", Well Graded     80 Tons
    Boulders, Step Pool, 600 to 900 Lb.     80 Tons
    Granular Surfacing, Staging Area     160 Tons
    Composite Bentonite Coated Aggregate     5 Tons
    RECO – 400 G Coir     175 S.Y.
    RECP – Type 2B     2,425 S.Y.
    Erosion Control Silt Fence     1,940 L.F.
    Live Stakes, Harvest on Site     1,000 Each
    Temporary Seeding     5.1 Acres
    Lake Drawdown/Dewatering     1 L.S.
    Excavation, Mechanical Dredging     138,831 C.Y.
    Earthfill, Embankment and Lake Bottom Fill     33,768 C.Y.
    Topsoil Strip, Salvage, and Respread     3,800 C.Y.
    Rip Rap, Class ‘C’ – Jetties and Shoreline Armoring     2,748 Tons
    Salvage Existing Rip Rap     480 Tons
    Granular Surfacing, Boat Launch and Parking Area     450 Tons
    Tied Concrete Block Mat, Shoreline Armoring and Overflows, 12’ Wide Roll     1,828 S.Y.
    Lake Riser Structure Modifications, Aluminum Bulkhead, Stoplogs, and 18" x 18" Slide Gate     1 L.S.
    12" PPHP Pipe     330 L.F.
    12" Hickenbottom Riser     4 Each
    Reinforced Concrete Arch Pipe, 42" Equivalent (51" x 31")     128 L.F.
    Reinforced Concrete Arch Flared End Section, 42" Equivalent (51" x 31")     6 Each
    Stone Terrace     1 L.S.
    Shoreline Fishing Node, 18’ x 10’     4 Each
    Seeding, Type 1     3.8 Acres
    Seeding, Type 2     5.9 Acres
    Seeding, Type 4 (Temporary)     9.4 Acres
    Erosion Control Silt Fence     5,000 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BREMER -- PROJECT # 21-03-09-05                10/19/2023                Large Project Letting
SWEET MARSH WILDLIFE MANAGEMENT AREA
QUAIL AVENUE PCC PAVEMENT MAINTENANCE REBID
Proposal Guarantee: $12,500
Completion Date: 8/30/2024

   This project consists of PCC pavement patches, crack cleaning and filling and foreslope armoring at Sweet Marsh Wildlife Management Area.

ESTIMATED QUANTITIES:
    Patches, Full-Depth Finish, by Area     120 S.Y.
    Patches, Full-Depth Finish, by Area (Greater than 50 ft in length)     210 S.Y.
    Patches, Full-Depth Finish, by Count, 6-inch PCC     10 Each
    Subbase (Patches)     330 S.Y.
    Crack and Joint Cleaning and Filling (PCC Pavement)     0.8 MI.
    Sealer Material (PCC Pavement)     400 LB.
    Paved Shoulder, PCC, 6"     22 S.Y.
    Special Backfill     7 Tons
    Foreslope Erosion Countermeasure     854 S.Y.
    Removal of Existing Revetment     1 L.S.
    Removal of Existing Rock     1 L.S.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CERRO GORDO -- PROJECT # 23-03-17-04                10/19/2023                Large Project Letting
MCINTOSH WOODS STATE PARK
FISH CLEANING STATION
Proposal Guarantee: $6,250
Completion Date: 6/1/2024

   This project consists of removing and replacing the fish cleaning table, concrete pad, and utilities at McIntosh Woods State Park in Cerro Gordo County, Iowa.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Fish Cleaning Table     1 Each
    Reinforced Concrete Pad     36 S.Y.
    Concrete Parking Pad     37 S.Y.
    Pavement Marking     1 L.S.
    ADA Sign     1 Each
    Special Backfill     24 Tons
    Water Connection     1 L.S.
    Electrical Connection     1 L.S.
    Sanitary Connection     1 L.S.
    Structure Removal and Reinstallation     1 L.S.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 24-01-30-01                10/19/2023                Large Project Letting
SILVER LAKE WMA
SHORELINE STABILIZATION
Proposal Guarantee: $50,000
Completion Date: 9/30/2024

   This project consists of tree clearing and armoring along the north side of Silver Lake.

ESTIMATED QUANTITIES:
    MOBILIZATION/DEMOBILIZATION      1 L.S.
    NPDES PERMITTING AND PPP     1 L.S.
    CONSTRUCT, MAINTAIN, & RESTORE ACCESS AND STAGING AREAS     1 L.S.
    TREE & BRUSH CLEARING     4.8 Acres
    FLOATATION SILT CURTAIN     3,661 L.F.
    SEDIMENT CONTROL LOG     3,661 L.F.
    CLASS E RIPRAP, ANGULAR     917 Tons
    NATIVE FIELDSTONE, CLASS D RIPRAP     3,580 Tons
    BEDDING FILTER MATERIAL     650 Tons
    GEOTEXTILE FILTER FABRIC - NON-WOVEN     1,961 S.Y.
    COMMON EXCAVATION (EV) (P) (ON-SITE, DESIGNATED BORROW AREA)     2,637 C.Y.
    ROLLED EROSION CONTROL PRODUCT RECP TYPE 2B     4,840 S.Y.
    SEEDING     4.8 Acres
    EROSION CONTROL MULCH     3.7 Acres
    BONDED FIBER MATRIX     0.1 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LINN -- PROJECT # 22-06-57-02                10/19/2023                Large Project Letting
PLEASANT CREEK RECREATION AREA
PAVEMENT PRESERVATION PHASE 2
Proposal Guarantee: $25,000
Completion Date: 10/11/2024

   This project consists of pavement preservation; crack cleaning and filling, patching, and fog sealing at Pleasant Creek State Recreation Area, Linn County, Iowa.

ESTIMATED QUANTITIES:
    2306 - BITUMINOUS FOG SEAL     2,776 GAL.
    2528 - TRAFFIC CONTROL     1 L.S.
    2529 - PATCHES, FULL-DEPTH FINISH, 6-IN., BY AREA, HMA     583 S.Y.
    2529 - PATCHES, FULL DEPTH FINISH, 6-IN., BY COUNT, HMA     16 Each
    2533 - MOBILIZATION     1 L.S.
    2541 - CLEANING AND FILLING CRACKS (HMA SURFACES)     5.4 MGAL
    2541 - SEALER MATERIAL (HMA SURFACES)     2,750 LB.
    2543 - TRANSVERSE JOINT REPAIR     223 Tons
    2312 - CLASS A CRUSHED STONE     40 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BUTLER -- PROJECT # 21-03-12-01                10/19/2023                Small Project Letting
BIG MARSH WILDLIFE MANAGEMENT AREA
PCC PAVEMENT MAINTENANCE
Proposal Guarantee: $0
Completion Date: 5/24/2024

   This project consists of PCC Pavement Patches at Big Marsh WMA

Contact:
Kenneth Howe
319-240-3553
Kenneth.howe@dnr.iowa.gov




CERRO GORDO -- PROJECT # 23-03-17-05                10/19/2023                Small Project Letting
MCINTOSH WOODS STATE PARK
SHELTER ROOF REPLACEMENTS
Proposal Guarantee: $0
Completion Date: 4/30/2024

   McIntosh Woods State Park has a Shelter and Fish Cleaning Shelter, and Ventura Access also has a shelter. All of these structures are in need of a new roof. This project will include removing all existing roofing, new fascia boards, and new steel roofing and underlayment on the structures. The Fish Cleaning Shelter will have its skylights removed and filled-in.

Contact:
Kenneth Howe
319-240-3553
Kenneth.howe@dnr.iowa.gov