PROJECTS LETTING -  September , 2014

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DAVIS 15-05-26-02 Lake Wapello - Sanitary Sewer Lining-2014-09-18   Bid Completion detail
FREMONT 14-04-36-02 Nishnabotna Wildlife Unit - Access road construction-2014-09-18   Bid Completion detail
HARRISON 14-04-43-01 Missouri River Wildlife Unit - Boat Ramp Construction-2014-09-18   Bid Completion detail
JOHNSON 15-06-52-02 Lake Macbride State Park - Shoreline Armoring-2014-09-18   Bid Completion detail
MAHASKA 13-05-62-03 Lake Keomah State Park - Daily Testing of PCC-2014-09-18   Bid Completion detail
SHELBY 13-04-83-03 Prairie Rose - Grade Stabilization Structure-2014-09-18   Bid Completion detail
SHELBY 13-04-83-03 Prairie Rose - Grade Stabilization Structure-2014-09-18   Bid Completion detail
APPANOOSE 15-05-04-02 Sedan Bottoms - Repair Weir Structure-2014-10-09   Bid Completion detail
HARDIN 14-02-42-01 Pine Lake - Replace/relocate RV Dumpstation-2014-10-16   Bid Completion detail
HARDIN 14-02-42-02 Pine Lake - Shoreline Armoring - Bids-2014-10-16   Bid Completion detail
HARDIN 15-02-42-02 Pine Lake - Concrete Repairs at Boat Ramp Drive-2014-10-16   Bid Completion detail
HARDIN 14-02-42-02 Pine Lake - Shoreline Armoring - Payment Requests-2014-10-16   Bid Completion detail
WEBSTER 14-02-94-01 Brushy Creek Recreation Area - Reroof shop/office pole buildings-2014-10-16   Bid Completion detail




DAVIS -- PROJECT # 15-05-26-02                9/18/2014                Large Project Letting
LAKE WAPELLO
SANITARY SEWER LINING
Proposal Guarantee: $10,000
Completion Date: 6/30/2015

   This project consists of rehabilitating 533 feet of 6" and 3232 feet of 8" gravity sewer mains and also replacing 757 feet of 4" laterals. The sewer line will be rehabilitated by cast in place lining of the pipe (CIPP) and by replacing several small lengths of broken pipe by point repair. All but one of the manholes will be repaired by centrifugally cast cementitious mortar lining (CCCM) and new casting.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    CIPP LINE SEWER PIPE, 8 INCH DIA     3,232 L.F.
    CIPP LINE SEWER PIPE, 6 INCH DIA     533 L.F.
    POST IMPROVEMENT TELEVISING     3,765 L.F.
    DIG & REPLACE 4 INCH LATERALS WITH 4 INCH PVC SDR 35 PIPE     757 L.F.
    MANHOLE CCCM INTERIOR LINING WITH EPOXY SEAL     170 L.F.
    NEW CASTING FOR CCCM LINED MANHOLES     17 Each
    SERVICE LATERAL RECONNECTION     14 Each
    POINT REPAIR - 8 OR 6 INCH SEWER PIPE (Actual No. of pt. repairs to be determined in field by Engr. & pipe lining Contractor)     10 Each
    PLUG 4 INCH SERVICE LATERAL     1 Each
    SITE RESTORATION AND SEEDING     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




FREMONT -- PROJECT # 14-04-36-02                9/18/2014                Large Project Letting
NISHNABOTNA WILDLIFE UNIT
ACCESS ROAD CONSTRUCTION
Proposal Guarantee: $5,000
Completion Date: 12/31/2014

   Construction of a granular surfaced access roadway with granular surfaced parking areas and any incidental work as required by the project documents and the DNR inspector in the Frazer's Bend Area of the Nishnabotna Wildlife Unit, Fremont County, Iowa.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Blading & Shaping     1 L.S.
    Surfacing, Class A Crushed Stone     3,125 Tons
    Engineering Fabric     14,963 S.Y.
    Earthfill     1 L.S.
    Channel Excavation     60 C.Y.
    24-Inch Diam CMP Culvert      48 L.F.
    Class E Revetment (RipRap)     48 Tons
    Macadam Stone (Road Base)     303 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HARRISON -- PROJECT # 14-04-43-01                9/18/2014                Large Project Letting
MISSOURI RIVER WILDLIFE UNIT
BOAT RAMP CONSTRUCTION
Proposal Guarantee: $3,000
Completion Date: 12/31/2014

   Construction of a granular surfaced access roadway with granular surfaced parking areas and any incidental work as required by the project documents and the DNR inspector in the Frazer's Bend Area of the Nishnabotna Wildlife Unit, Fremont County, Iowa.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clearing & Grubbing     1 L.S.
    Class A Crushed Stone (Ramp Base)     762 Tons
    Concrete, Structural Class C Ramp- 6"     238 S.Y.
    Class E Revetment (RipRap)     323 Tons
    Excavation     116 C.Y.
    Class A Crushed Stone (Parking)     278 Tons
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JOHNSON -- PROJECT # 15-06-52-02                9/18/2014                Large Project Letting
LAKE MACBRIDE STATE PARK
SHORELINE ARMORING
Proposal Guarantee: $10,000
Completion Date: 11/30/2014

   This project consists of repairing 31 separate shoreline locations.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Class E Revetment     3,792.5 Tons
    Class A Crushed Stone     520 Tons
    3/8" Minus Crushed Stone     385 Tons
    Concrete Grout     35 C.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SHELBY -- PROJECT # 13-04-83-03                9/18/2014                Large Project Letting
PRAIRIE ROSE
GRADE STABILIZATION STRUCTURE
Proposal Guarantee: $6,000
Completion Date: 5/15/2015

   This project is for construction of a grade stabilization structure at Prairie Rose State Park.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    24" Dia. 16 Ga. Corrugated Metal Pipe     114 L.F.
    24" Dia. 16 Ga. CMP Slotted Flume     30 L.F.
    42" Dia. Intake Assembly (Exclude Anti Vortex Baffle)     1 L.S.
    Earth Fill ( In Place)     20,535 C.Y.
    Excavation     3,023 C.Y.
    Anti Vortex Baffle     1 L.S.
    Timber Outlet Support     1 L.S.
    Fine Drain Fill     30 C.Y.
    Class "E" Rip Rap (Dam Outlet)     16 Tons
    Pool Area Excavation     12,394 C.Y.
    42" Dia. Corrugated Metal Pipe     80 L.F.
    Pyramat Geotextile     72 S.Y.
    Class "E" Rip Rap (Crossing Outlet)     20 Tons
    Earth Fill (Crossing)     328 C.Y.
    Site Restoration     1 L.S.
    Property Line Fence and Signing     1 L.S.
    Clearing and Grubbing (Dike )     1 L.S.
    Clearing and Grubbing (Farm Crossing)     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MAHASKA -- PROJECT # 13-05-62-03                9/18/2014                Small Project Letting
LAKE KEOMAH STATE PARK
DAILY TESTING OF PCC
Proposal Guarantee: $0
Completion Date: 9/1/2015

   This project consists of monitoring and testing PCC paving operations in accordance with Iowa DOT specifications during roadway reconstruction at Lake Keomah State Park. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




APPANOOSE -- PROJECT # 15-05-04-02                10/9/2014                Small Project Letting
SEDAN BOTTOMS
REPAIR WEIR STRUCTURE
Proposal Guarantee: $0
Completion Date: 11/30/2014

   This project consists of placement of 150 tons class "E" riprap and 25 CY revetment grout to protect a sheet pile weir structure. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




HARDIN -- PROJECT # 14-02-42-01                10/16/2014                Small Project Letting
PINE LAKE
REPLACE/RELOCATE RV DUMPSTATION
Proposal Guarantee: $0
Completion Date: 4/15/2015

   This project is for the construction of a new RV dump station and associated utilities at Pine Lake State Park in Hardin County. The existing dump station will be removed as a part of the scope of work as well as the reconfiguration of a camp site into a full hookup site adjacent to the new dump station.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




HARDIN -- PROJECT # 14-02-42-02                10/16/2014                Small Project Letting
PINE LAKE
SHORELINE ARMORING - BIDS
Proposal Guarantee: $0
Completion Date: 3/13/2015

   This project consists of the placement of 590 tons of Class D riprap on the shoreline of Upper Pine Lake at Pine Lake State Park in Hardin County. Some grooming of the existing bank will be required.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




HARDIN -- PROJECT # 15-02-42-02                10/16/2014                Small Project Letting
PINE LAKE
CONCRETE REPAIRS AT BOAT RAMP DRIVE
Proposal Guarantee: $0
Completion Date: 4/15/2015

   This project consists of the replacement of approximately 3,500 square feet of 6" concrete paving at the river boat ramp driveway at Pine Lake State Park in Hardin County.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




WEBSTER -- PROJECT # 14-02-94-01                10/16/2014                Small Project Letting
BRUSHY CREEK RECREATION AREA
REROOF SHOP/OFFICE POLE BUILDINGS
Proposal Guarantee: $0
Completion Date: 12/19/2014

   This project consists of the replacement of asphalt shingle roofing on three buildings at Brushy Creek State Park in Webster County. The scope of work includes the removal of old shingles and gutters and the placement of new shingles and associated substrate, and new gutters and downspouts as noted.

Contact:
Don Labate
515-250-3714