PROJECTS LETTING -  September , 2010

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DICKINSON 11-01-30-01 Estes WRP WMA - Wetland Restoration & Design-2010-09-09   Bid Completion detail
WINNESHIEK 09-03-96-04 Bluffton Fir Stand - Canoe access road repair-2010-09-09   Bid Completion detail
BLACK HAWK 09-03-07-13 George Wyth State Park - New Flush Toilet Pad & Utilities-2010-09-16   Bid Completion detail
CASS 11-04-15-01 Lake Anita State Park - Complete trail and pave-2010-09-16   Bid Completion detail
MARION 11-05-63-02 Elk Rock State Park - Dock / Walkway installation-2010-09-16   Bid Completion detail
PALO ALTO 11-01-74-01 Lost Island Lake - Fish barriers / Water Control-2010-09-16   Bid Completion detail
APPANOOSE 08-05-04-18 Honey Creek Destination Park - Boat Docks and Slips-Redesign-2010-09-23   Bid Completion detail
CLAYTON 10-03-22-01 Guttenberg Hatchery fishing walkway - walkway repair-2010-09-23   Bid Completion detail
DELAWARE 11-03-28-02 Manchester Fish Hatchery - Roofing Project-2010-09-23   Bid Completion detail
MUSCATINE 09-06-70-10 Fairport Fish Hatchery - Flood Erosion Repair-2010-10-07   Bid Completion detail
O'BRIEN 11-01-71-01 Austin & Kilts Buildings - Asbestos Evaluation - 2 sites-2010-10-07   Bid Completion detail
VAN BUREN 10-06-89-04 Lake Sugema - Lake Sugema FEMA shoreline work-2010-10-07   Bid Completion detail




CASS -- PROJECT # 11-04-15-01                9/16/2010                Large Project Letting
LAKE ANITA STATE PARK
COMPLETE TRAIL AND PAVE
Proposal Guarantee: $10,000
Completion Date: 5/20/2011

   Project consists of phases 1 and 2 of the overall plan set. Work in phase 1 consists of clearing and grubbing, 3900 C.Y. of earthwork, placement of 1246 tons of rock, placement of culverts and signs, and seeding and mulching. Work in phase 2 consists of blading and shaping of previously laid subgrade, paving over a mile of trail, and placement of 682 tons of rock as trail shoulders.

ESTIMATED QUANTITIES:
    Clearing and Grubbing     4.1 Acres
    Excavation, Class 10, Fill in Place     3,900 C.Y.
    Granular Surfacing, Class "A" Cr. Stone     1,928 Tons
    Excavation, Class 20, for Roadway Pipe Culvert     70 C.Y.
    Culvert, 18" C.M.P.     308 L.F.
    Aprons, Metal, 18" Dia.     18 Each
    Posts for Type A Signs, 4x4 Wood     68 L.F.
    Type A Signs, Aluminum     26.5 S.F.
    Seeding, Fertilizing, and Mulching     3.1 Acres
    Blading, Shaping, Rolling Subgrade     1.1 MI.
    PCC Concrete Paving, 5" Depth     5,200 S.Y.
    Reinforcing Steel (Grade 40)     15,604 LB.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




PALO ALTO -- PROJECT # 11-01-74-01                9/16/2010                Large Project Letting
LOST ISLAND LAKE
FISH BARRIERS / WATER CONTROL
Proposal Guarantee: $30,000
Completion Date: 8/1/2011

   This project was designed by Ducks Unlimited, in cooperation with the Iowa DNR, and consists of the restoration of several sites surrounding Lost Island Lake and incidental work as required by the Plans and/or the D.U. Construction Inspector.

ESTIMATED QUANTITIES:
    BS-Mobilization     1 L.S.
    BS-Site Preparation     1 L.S.
    BS-Embankment Construction     873 C.Y.
    BS-Excavation, Outlet Channel     1,720 C.Y.
    BS-Excavation, Inlet Channel     3,606 C.Y.
    BS-Excavation, Middle Barringer Slough     2,554 C.Y.
    BS-Revetment, Class II Riprap     60 C.Y.
    BS-Revetment, Class III Riprap     50 C.Y.
    BS-Bedding, 3/4" - 1 1/4" Cr. Stone     100 C.Y.
    BS-RCB, Twin 9' X 5'     24 L.F.
    BS-RCB Weir Section, Twin 9' X 5'     12 L.F.
    BS-RCB Weir Section, Twin 9' X 5' w/Buttress Walls     6 L.F.
    BS-RCB Sloped End Section, Twin 9' X 5'     10 L.F.
    BS-3'-2" Precast Dropped End Walls     1 L.S.
    BS-Curb, Precast, 12" X 18"     1 L.S.
    BS-Curb, Precast, 12" X 12"     1 L.S.
    BS-Concrete, Cast In Place     5 C.Y.
    BS-Stoplog Guides, Galvanized System     1 L.S.
    BS-Aluminum Stoplogs - Cleaning Rake     1 L.S.
    BS-Horizontal Fish Fingers     1 L.S.
    BS-Catwalk Components     1 L.S.
    BS-Aluminum Fish Fingers/Winch     1 L.S.
    BS-Removal of Existing Structures     1 L.S.
    BS-Soil Erosion and Pollution Control     1 L.S.
    BS-Seeding and Mulching     3.5 Acres
    DU-Mobilization     1 L.S.
    DU-Site Preparation     1 L.S.
    DU-Excavation, Outlet Channel     1,900 C.Y.
    DU-Revetment, Class II Riprap     85 C.Y.
    DU-Culvert, Metal CMP, 15" Dia.     22 L.F.
    DU-Cast In Place Concrete     32 C.Y.
    DU-Structural Steel     1 L.S.
    DU-Soil Erosion & Pollution Control     1 L.S.
    DU-Traffic Control     1 L.S.
    DU-Seeding and Mulching     2 Acres
    BM-Mobilization     1 L.S.
    BM-Site Preparation     1 L.S.
    BM-Excavation     110 C.Y.
    BM-Embankment Construction     181 C.Y.
    BM-Revetment, Class II Riprap     72 C.Y.
    BM-IA Class III Aggregate     36 C.Y.
    BM-Bedding, 3/4" - 1 1/4" Cr. Stone     60 C.Y.
    BM-RCB, 12' X 4' Single (Furnish & Install)     18 L.F.
    BM-RCB, 12' X 4' (Install Only)     12 L.F.
    BM-End Section, Single BCB Sloped     8 L.F.
    BM-3'-2" Precast Dropped End Wall     1 L.S.
    BM-Cast In Place Concrete     12 C.Y.
    BM-Stoplog Guides, Galvanized System     1 L.S.
    BM-Aluminum Stoplogs - Catwalk Components     1 L.S.
    BM-Removal of Existing Structures     1 L.S.
    BM-Floating Silt Fence     1 L.S.
    BM-Cofferdam/Dewatering     1 L.S.
    BM-Seeding and Mulching     0.5 Acres
    BW-Mobilization     1 L.S.
    BW-Site Preparation     1 L.S.
    BW-Excavation     1,189 C.Y.
    BW-Revetment, Class II Riprap     30 C.Y.
    BW-Revetment, Class III Riprap     36 C.Y.
    BW-IA Class III Aggregate     84 C.Y.
    BW-Bedding, 3/4" - 1 1/4" Cr. Stone     84 C.Y.
    BW-Surfacing, Class "A" Roadstone     72 C.Y.
    BW-RCB, 6' X 4' Twin     90 L.F.
    BW-RCB Weir Section, Twin 6' X 4'     6 L.F.
    BW-RCB Sloped End Section, Twin 6' X 4'     6 L.F.
    BW-3'-2" Precast Dropped End Wall     1 L.S.
    BW-Curb, Precast, 12" X 12"     1 L.S.
    BW-Cast In Place Concrete     0.5 C.Y.
    BW-Stoplog Guides, Galvanized System     1 L.S.
    BW-Aluminum Stoplogs - Cleaning Rake     1 L.S.
    BW-Horizontal Fish Fingers     1 L.S.
    BW-Catwalk Components     1 L.S.
    BW-Aluminum Fish Fingers/Winch     1 L.S.
    BW-Removal of Existing Structures     1 L.S.
    BW-Soil Erosion & Pollution Control     1 L.S.
    BW-Traffic Control     1 L.S.
    BW-Seeding & Mulching     0.5 Acres
    LI-Mobilization     1 L.S.
    LI-Site Preparation     1 L.S.
    LI-Embankment Construction     367 C.Y.
    LI-Revetment, Class II Riprap     96 C.Y.
    LI-Revetment, Class III Riprap     154 C.Y.
    LI-IA Class III Aggregate     30 C.Y.
    LI-Bedding, 3/4" - 1 1/4" Cr. Stone     30 C.Y.
    LI-RCB, Single 9' X 5'     18 L.F.
    LI-RCB, Single 9' X 5' (Modified)     6 L.F.
    LI-RCB Sloped End Section, Single 9' X 5'     10 L.F.
    LI-3'-2" Precast Dropped End Wall     1 L.S.
    LI-Curb, Precast, 12" X 12"     1 L.S.
    LI-Cast In Place Concrete     17 C.Y.
    LI-Sheet Pile - Materials     1,921 S.F.
    LI-Sheet Pile - Installation     1,921 S.F.
    LI-Pile Cap, Guides, Channels, Angles, etc.     1 L.S.
    LI-Aluminum Fish Screens & Rake     1 L.S.
    LI- Stoplog & Catwalk Components     1 L.S.
    LI-Aluminum Stoplogs     1 L.S.
    LI-Floating Silt Fence     1 L.S.
    LI-Cofferdam/Dewatering     1 L.S.
    LI-Access Road Resurfacing     260 C.Y.
    LI-Removal of Existing Structures     1 L.S.
    LI-Seeding & Mulching     0.5 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 11-01-30-01                9/9/2010                Small Project Letting
ESTES WRP WMA
WETLAND RESTORATION & DESIGN
Proposal Guarantee: $0
Completion Date: 11/12/2010

   This project is designed to add additional wetland elements to Estes Tract of the Hales Slough Wetland Complex in Dickinson County. Work under this project includes excavations, earthfill (dike construction), tile breaks, tile installation (multiple sizes), a water control structure, a toewall structure, and seeding.

Contact:
Jeff Felts
515-250-3712
[email protected]




WINNESHIEK -- PROJECT # 09-03-96-04                9/9/2010                Small Project Letting
BLUFFTON FIR STAND
CANOE ACCESS ROAD REPAIR
Proposal Guarantee:
Completion Date: 11/19/2010

   Project consists of bank stabilization using revetment, bank reshaping, & erosion control. Remove concrete slabs from river & drive, break slabs & use for revetment, furnish & place Class D revetment, furnish & place earth fill, and seed all disturbed areas.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




BLACK HAWK -- PROJECT # 09-03-07-13                9/16/2010                Small Project Letting
GEORGE WYTH STATE PARK
NEW FLUSH TOILET PAD & UTILITIES
Proposal Guarantee:
Completion Date: 10/29/2010

   Work consists of constructing a pad for a prefabricated latrine by others, placing below floor piping, installing water & sewer lines, and seeding of disturbed areas.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




MARION -- PROJECT # 11-05-63-02                9/16/2010                Small Project Letting
ELK ROCK STATE PARK
DOCK / WALKWAY INSTALLATION
Proposal Guarantee:
Completion Date: 12/15/2010

   This project consists of construction of a concrete median between two existing concrete boat ramps, construction of an aluminum-framed wedge-style dock, and installation of riprap, grouted into place. Construction must be performed between September 30 and December 15 when Red Rock Lake is lowered 10' below normal pool.

Contact:
Jason Kruse
(515) 250-3707
[email protected]




APPANOOSE -- PROJECT # 08-05-04-18                9/23/2010                Small Project Letting
HONEY CREEK DESTINATION PARK
BOAT DOCKS AND SLIPS-REDESIGN
Proposal Guarantee: $0
Completion Date: 4/1/2011

   Negotiated contract

Contact:
Jason Kruse
(515) 250-3707
[email protected]




CLAYTON -- PROJECT # 10-03-22-01                9/23/2010                Small Project Letting
GUTTENBERG HATCHERY FISHING WALKWAY
WALKWAY REPAIR
Proposal Guarantee: $0
Completion Date: 10/29/2010

   Placing revetment behind sidewalk curb, grouting same in and creating fishing landings.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




DELAWARE -- PROJECT # 11-03-28-02                9/23/2010                Small Project Letting
MANCHESTER FISH HATCHERY
ROOFING PROJECT
Proposal Guarantee:
Completion Date: 11/24/2010

   Project consists of placing metal roof systems on feed storage, hachery shop, & oil storage buildings.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




MUSCATINE -- PROJECT # 09-06-70-10                10/7/2010                Small Project Letting
FAIRPORT FISH HATCHERY
FLOOD EROSION REPAIR
Proposal Guarantee:
Completion Date: 11/27/2010

   Repair bank erosion along Mississippi River at Fairport State Fish Hatchery near Muscatine. Work Items include: 1 LUMP SUM of Bank Shaping 645 SQ YD of Engineering Fabric 486 TON of Iowa DOT Class E Revetment

Contact:
David Heer
(515) 250-3719
[email protected]




O'BRIEN -- PROJECT # 11-01-71-01                10/7/2010                Small Project Letting
AUSTIN & KILTS BUILDINGS
ASBESTOS EVALUATION - 2 SITES
Proposal Guarantee: $0
Completion Date: 12/3/2010

   The scope of this project involves the removal of siding and roofing materials that have been found to contain asbestos. The project involves two separate buildings, one in Dickinson County and one in O'Brien County in northwest Iowa.

Contact:
Jeff Felts
515-250-3712
[email protected]




VAN BUREN -- PROJECT # 10-06-89-04                10/7/2010                Small Project Letting
LAKE SUGEMA
LAKE SUGEMA FEMA SHORELINE WORK
Proposal Guarantee:
Completion Date: 11/27/2010

   Repair of erosion of shoreline and jetties at Lake Sugema, 5 miles SW of Keosauqua. Work items include: __ Class 10 Excavation, 94 CU YD __ Engineering Fabric, 804 SQ YD __ Iowa DOT Class E Revetment, 554 TON __ Granular Surfacing, Class A Crushed Stone, 167 TON Construction and materials shall follow Iowa DOT Standard Specifications, Series 2009.

Contact:
David Heer
(515) 250-3719
[email protected]