PROJECTS LETTING -  August , 2012

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

BOONE 12-02-08-03 Ledges State Park - Electrical Upgrades-2012-08-30   Bid Completion detail
BOONE 12-02-08-05 Ledges State Park - Sewer and Water Upgrades-2012-08-30   Bid Completion detail
LUCAS 11-05-59-06 Stephens State Forest Whitebreast Unit - Robert's Crossing -2012-08-30   Bid Completion detail
POLK 13-02-77-02 Big Creek State Park - Beach Area Demolition-2012-08-30   Bid Completion detail
BOONE 11-02-08-11 Saylorville Wildlife Unit - Headquarters Building Data Line-2012-09-06   Bid Completion detail
DICKINSON 13-01-30-07 Dugout Creek Wetland Complex - Synco Wetland RT-2012-09-06   Bid Completion detail
POTTAWATTAMIE 12-04-78-11 Lake Manawa State Park - Sediment removal & parking lot-2012-09-06   Bid Completion detail
POTTAWATTAMIE 12-04-78-14 Lake Manawa State Park - Repair retaining wall by beach-2012-09-06   Bid Completion detail
POTTAWATTAMIE 12-04-78-06 Wilson Island Recreation Area - Demolition of buildings-2012-09-06   Bid Completion detail
POTTAWATTAMIE 12-04-78-05 Wilson Island State Recreation Area - Restore riverfront area-2012-09-06   Bid Completion detail
ADAMS 13-04-02-01 Mount Ayr Fisheries Management Unit - Gate repair at Lake Icaria-2012-09-13   Bid Completion detail
CERRO GORDO 13-03-17-02 Clear Lake State Park - Shower Floor Replacement-2012-09-13   Bid Completion detail
DELAWARE 13-03-28-01 Backbone State Park - Replace barn siding and windows-2012-09-13   Bid Completion detail
SAC 13-01-81-02 Blackhawk Lake - Blackhawk Lake Concrete Weir Repair-2012-09-13   Bid Completion detail
WEBSTER 12-02-94-01 Dolliver State Park - RV Dump Station & Other Upgrades-2012-09-13   Bid Completion detail
MAHASKA 05-05-62-04 Lake Keomah State Park - Office & Service Facility (REBID)-2012-09-20   Bid Completion detail
POLK 13-02-77-03 Big Creek State Park - Beach Renovation Project-2012-09-20   Bid Completion detail
RINGGOLD 12-04-80-04 Kellerton Wildlife Area - New headquarters (REBID II)-2012-09-20   Bid Completion detail
WARREN 13-05-91-02 Lake Ahquabi - Lake Ahquabi Rip Rap Ph II-2012-09-20   Bid Completion detail
WARREN 12-05-91-01 Lake Ahquabi State Park - concession bldg replacement-2012-09-20   Bid Completion detail
WOODBURY 13-01-97-01 Luton Wildlife Management Area - Luton WMA Dike Repairs-2012-09-20   Bid Completion detail
DICKINSON 13-01-30-03 Iowa Great Lakes - Electric Fish Barrier-2012-09-25   Bid Completion detail
JACKSON 12-06-49-04 Bellevue Fisheries Station - Ramp repair/work-2012-09-27   Bid Completion detail
JACKSON 12-03-49-02 Bellevue State Park - replace roof-2012-09-27   Bid Completion detail
TAYLOR 13-04-87-02 Lake of Three Fires State Park - Shoreline Armoring-2012-09-27   Bid Completion detail




MAHASKA -- PROJECT # 05-05-62-04                9/20/2012                Large Project Letting
LAKE KEOMAH STATE PARK
OFFICE & SERVICE FACILITY (REBID)
Proposal Guarantee: $10,000
Completion Date: 5/31/2013

   This project consists of the construction of a one story, pre-engineered structural insulated panel (SIP) building with standing seam metal roofing and cement board siding, approximately 45' x 80', including three heated bays, a mechanical/electrical room, one restroom, a conference room, open office area and a storage room. The work also includes concrete and class "A" crushed stone paving, concrete paving, septic sewer, water and electrical services

ESTIMATED QUANTITIES:
    EARTHWORK & ALL UNDERGROUND UTILITIES     1 L.S.
    6" CLASS "A" CRUSHED STONE PAVING     1 L.S.
    SITE RESTORATION     1 L.S.
    CHAIN LINK FENCE & GATE     1 L.S.
    6" EXTERIOR CONCRETE APRON     1 L.S.
    CONCRETE PARKING LOT, PAVING & SIDEWALK     1 L.S.
    45'-0" X 80'-0" SIPS BUILDING W/ ALL INTERNAL COMPONENTS AND FORCED-AIR HVAC     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POLK -- PROJECT # 13-02-77-03                9/20/2012                Large Project Letting
BIG CREEK STATE PARK
BEACH RENOVATION PROJECT
Proposal Guarantee: $50,000
Completion Date: 3/31/2013

   The work consists of the beach area renovation including new shelters, new restrooms, cabanas, storage shed, kiosk, concrete flat work, utilities, grading, and incidental work as required by the Plans and the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Earthwork     1 L.S.
    Sanitary Sewer Service, Trenched, 6" PVC     340 L.F.
    Sanitary Sewer, Cleanout, 6" Diam     3 Each
    Connection to Existing Manhole     2 Each
    Water Service Pipe,2" Diam     346 L.F.
    Water Service Pipe, 1" Diam     487 L.F.
    Water Main Connection, 4" x 2"     1 Each
    Water Main Connection, 3" x 2"     2 Each
    Manhole, SW-301 (48" Diam)     1 Each
    Intake, Type SW-501, Top Only     1 Each
    Intake, Type SW-512, (24" Diam)     1 Each
    Intake, Pourous Fill Drain Pit     1 Each
    Intake, Trench Drain     2 Each
    Storm Sewer, Treanched, CMP, 12" Diam     73 L.F.
    PCC Curb & Gutter, 30"     335 L.F.
    Sidewalk, PCC 6"     4,812 S.Y.
    Sidewalk, PCC 7"     50 S.Y.
    Detectable Warnings     206 S.F.
    Driveway, PCC, Type 1, 7"     130 S.Y.
    Stormwater Pollution Prevention Plan (SWPPP)     1 L.S.
    Silt Fence, Indtallation & Removal     700 L.F.
    Construction Survey     1 L.S.
    Drinking Fountain     1 Each
    Yard Hydrant     4 Each
    Shelter, Nominal 40'x68', Romtec Iowa DNR Custom     3 Each
    Restroom, Nominal 18'x24', Romtec Iowa DNR Custom      3 Each
    Cabanas, Nominal 13'x13', Romtec Iowa DNR Custom      9 Each
    storage Building, Nominal 20'x30', As Shown on Plans     1 Each
    Kiosk, As Shown On Plans     1 Each
    Bike Racks, S.S., Huntco BR11     3 Each
    Benches, Kay Contour 6' Douglas Fir 3x4     25 Each
    Site Lighting, Kim Archetecture LED w 20' Pole     3 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




RINGGOLD -- PROJECT # 12-04-80-04                9/20/2012                Large Project Letting
KELLERTON WILDLIFE AREA
NEW HEADQUARTERS (REBID II)
Proposal Guarantee: $10,000
Completion Date: 4/30/2013

   This project consists of the construction of a one story, pre-engineered structural insulated panel building with standing seam metal roofing and metal siding, approximately 50' x 110', including three heated bays, a mechanical/electrical room, two restrooms, a conference room, open office area, 4 offices, and a storage room. The work also includes concrete and class "A" crushed stone paving, septic sewer, water and electrical services.

ESTIMATED QUANTITIES:
    EARTHWORK & ALL UTILITIES     1 L.S.
    6" CLASS "A" CRUSHED STONE PAVING     1 L.S.
    CONCRETE SIDEWALK     1 L.S.
    50'-0" X 110'-0" SIPS BUILDING     1 L.S.
    FURNACE HVAC SYSTEM     1 L.S.
    SEPTIC SYSTEM     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WARREN -- PROJECT # 13-05-91-02                9/20/2012                Large Project Letting
LAKE AHQUABI
LAKE AHQUABI RIP RAP PH II
Proposal Guarantee: $5,000
Completion Date: 3/31/2013

   This project consists of the placement of riprap revetment along portions of the lake shoreline, and incidental work as required by the Plans and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Revetment, Class "D" Riprap     4,331 Tons
    Engineering Fabric     5,773 S.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WARREN -- PROJECT # 12-05-91-01                9/20/2012                Large Project Letting
LAKE AHQUABI STATE PARK
CONCESSION BLDG REPLACEMENT
Proposal Guarantee: $10,000
Completion Date: 3/31/2013

   This project consists of the construction of a one story, pre-engineered post-frame building with a metal roof and metal siding, approximately 40' x 30', two cold storage bays, one restroom, fenced in equipment yard and beach area. The work also includes concrete and class "A" crushed stone paving, concrete paving and electrical services. Project number 12-05-91-01

ESTIMATED QUANTITIES:
    CLEARING AND GRUBBING     113.5 Units
    ON-SITE TOPSOIL     160 C.Y.
    EXCAVATION CLASS 10     320 C.Y.
    MODIFIED SUB-BASE     69 Tons
    PEA GRAVEL     20 Tons
    SAND     20 Tons
    4" PCC PAVEMENT     191.1 S.Y.
    6" PCC PAVEMENT     257.8 S.Y.
    12" CMP INCLUDING APRONS     42 L.F.
    CONVENTIONAL SEEDING (TYPE 1)     0.3 Acres
    CONVENTIONAL SEEDING (NATIVE GRASS & WLDFLWR)     0.1 Acres
    SILT FENCE     120 L.F.
    ELECTRIC SERVICE     1 Each
    SANITARY SERVICE     1 Each
    WATER LINE     1 Each
    DEMOLITION WORK     1 L.S.
    30' X 40' POST FRAME BUILDING (AS SHOWN)     1 L.S.
    FENCED EQUIPMENT YARD WITH ROCK     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 13-01-30-03                9/25/2012                Large Project Letting
IOWA GREAT LAKES
ELECTRIC FISH BARRIER
Proposal Guarantee: $25,000
Completion Date: 1/10/2013

   An electric fish barrier is to be installed near Milford, Iowa at the South end of Lower Gar Lake. The purpose of the barrier is to block upstream passage of Asian Carp into the Iowa Great Lakes. The electric barrier will consist of mild steel electrodes, a concrete weir, insulating material, piping, wiring, and a small electrical controls building. Grading and site work to be directed by the construction documents and the IDNR field engineer.

ESTIMATED QUANTITIES:
    Testing and Inspecting, supervision of earthwork for cut to fill and fill import locations     2 Day
    Field Density Testing to subbase access road , set of three samples     3 Each
    Concrete testing, aggregates, abrasion, ASTM C 131 for InsulcreteTM and control building slab     2 Each
    Concrete testing, water cement ratio curve, 3 batches for InsulcreteTM and control building slab.     1 Each
    Office Trailer, furnished, rent per month, 20' x 8', excl. hookups.     3 Each
    Modular office building, delivery, each way.     2 Each
    Field Office Expense, office equipment rental, average     3 Mo.
    Field Office Expense, office supplies, average.     3 Mo.
    Field Office Expense, telephone bill; avg. bill/month, incl. long distance     2 Mo.
    Field Office Expense, field office lights & HVAC.     3 Mo.
    Temporary access road, gravel fill, 4" gravel depth, excl surfacing     208 S.Y.
    Project signs, sign, high intensity reflectorized, buy, incl. Posts     12 S.F.
    Boundary & survey markers, crew for building layout, 2 person crew     2 Day
    Cleaning up, cleanup of job site, final by GC at end of job     10 M.S.F.
    Partial wing-wall demolition on both the north and south side of the waterway, remove concrete walls, plain concrete, 12" thick, including disposal co     144 S.F.
    C.I.P. concrete forms, slab on grade, edge, wood, 12" high, 1 use, includes erecting, bracing, stripping and cleaning     1,328 S.F.C.A.
    C.I.P. concrete forms, wing- wall, battered, job built plywood, to 8' high, 1 use, includes erecting, bracing, stripping and cleaning     600 S.F.C.A.
    Epoxy coating, for reinforcing steel, add to fabricated & delivered price for coating with epoxy     1.08 Tons
    Insulative concrete (InsulcreteTM), ready mix, normal weight, includes local aggregate, sand, Portland cement and water, delivered, including all addi     297 C.Y.
    Structural concrete, ready mix, normal weight, 4000 PSI, includes local aggregate, sand, Portland cement and water, delivered, including all additives     4 C.Y.
    Shotcrete, wet mix, fiber reinforced 3000 psi, 2" thick including delivery and installation.     5,976 S.F.
    Fiberglass Castings, square tube, 4" x 4" x 1/4" thick for electrode wire raceway to the top of newly formed wing-walls     24 L.F.
    Electrode mild steel plate, structural, for connections & stiffeners, 3/4" T, shop fabricated, uncoated including delivery and installation     466 S.F.
    Anchor bolts (Hilti Hus-h)single, 16.5mm diameter x 135mm long, installed in fresh concrete (InsulcreteTM), includes nut and washer including delivery     312 Each
    Topsoil stripping and stockpiling, topsoil, sandy loam, ideal conditions, 200 H.P. dozer     163 C.Y.
    Fine grading, slopes, gentle, finish grading.     1,471 S.Y.
    Synthetic erosion control, silt fence, polypropylene, ideal conditions, 3' high.     361 L.F.
    Synthetic erosion control, paper hydromulch.     1,471 S.Y.
    Provide sheet piling, steel, 22 psf, 15' excavation, per ton, drive, extract and salvage, including wales.     6 Tons
    Mobilization     1 Each
    Demobilization     1 Each
    Reinforcing Steel, western mill, A615, grade 60, mill base price, material and delivery     1.08 Tons
    Reinforcing Steel, average price, cut, bent and delivered, A615, grade 60, material only     1.08 Tons
    Reinforcing bars, glass fiber reinforced polymer, #5 bar, 0.258 lb./L.F., including labor and material for accessories.     23,206 L.F.
    Excavating, chain trencher, utility trench, common earth, 8" wide, 24" deep, backfill by hand, includes bed material and compaction.     300 L.F.
    Load and deliver bank run gravel for concrete barrier slab and wing-wall foundation haul 2 miles, spread with 200 H.P. dozer     930 Tons
    Borrow, material only, bank run gravel for concrete barrier slab and wing-wall foundation.     930 Tons
    Compaction, riding, vibrating roller, 2 passes, 8" lifts     585 E.C.Y.
    Supply, deliver and place 6" erosion stone minors to downstream edge of concrete slab.      92 C.Y.
    Geosynthetic soil stabilization, geotextile fabric, woven, 200 lb. tensile strength     5,257 S.Y.
    Supply, deliver and place 8" thick subbase for new access road     540 S.Y.
    Supply, deliver and erect 8' high chain link fence     217 L.F.
    Supply, deliver and erect single chain link gates     2 Each
    Supply, deliver and erect double gate entry to control building     1 Each
    Supply, deliver and install Schedule 40 conduit to barrier     846 L.F.
    Subbase material for access road, loaded at the pit, prices per ton, includes material only     215 Tons
    Borrow, delivery charge, minimum 20 tons, 1 hour round trip     215 Tons
    Supply and install control building including all fixtures and communication with the electricity and communication service providers     1 Each
    Manufacture, supply and deliver SRI fish barrier equipment     1 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BOONE -- PROJECT # 12-02-08-03                8/30/2012                Small Project Letting
LEDGES STATE PARK
ELECTRICAL UPGRADES
Proposal Guarantee: $0
Completion Date: 11/1/2012

   This project entails upgrading the host campsite from a 30 amp service to a 50 amp service, adding receptacles and conduit in the Park shop for garage door openers and misc. electrical upgrades at Ledges State Park in Boone County, Iowa.

Contact:
Don Labate
515-250-3714
[email protected]




BOONE -- PROJECT # 12-02-08-05                8/30/2012                Small Project Letting
LEDGES STATE PARK
SEWER AND WATER UPGRADES
Proposal Guarantee: $0
Completion Date: 9/28/2012

   This project entails upgrading the host campsite with sewer and water hook ups, repairing curb stops, repairing a water main leak, replacing a yard hydrant and other plumbing upgrades at Ledges State Park in Boone County, Iowa.

Contact:
Don Labate
515-250-3714
[email protected]




LUCAS -- PROJECT # 11-05-59-06                8/30/2012                Small Project Letting
STEPHENS STATE FOREST WHITEBREAST UNIT
ROBERT'S CROSSING
Proposal Guarantee: $0
Completion Date: 11/30/2012

   This project includes replacement of a ford style stream crossing.

Contact:
Jason Kruse

[email protected]




POLK -- PROJECT # 13-02-77-02                8/30/2012                Small Project Letting
BIG CREEK STATE PARK
BEACH AREA DEMOLITION
Proposal Guarantee: $0
Completion Date: 10/15/2012

   This project includes the demolition and removal of three shelters and two latrines and associated foundations and utilities, including an outside shower structure, at the beach complex at Big Creek State Park in Polk County, Iowa. All structures are constructed of timber framing with concrete masonry walls and concrete foundations.

Contact:
Don Labate
515-250-3714
[email protected]




BOONE -- PROJECT # 11-02-08-11                9/6/2012                Small Project Letting
SAYLORVILLE WILDLIFE UNIT
HEADQUARTERS BUILDING DATA LINE
Proposal Guarantee: $0
Completion Date: 10/1/2012

   Data Line tio be bored from the Research Station to the new Wildlife HQ Building at teh Saylorville Unit at Ledges State Park in Boone, IA.

Contact:
Don Labate
515-250-3714
[email protected]




DICKINSON -- PROJECT # 13-01-30-07                9/6/2012                Small Project Letting
DUGOUT CREEK WETLAND COMPLEX
SYNCO WETLAND RT
Proposal Guarantee: $0
Completion Date: 11/16/2012

   This project is designed to provide two additional wetland pool areas to the wetland area known as Synco WPA in Dickinson County. Work under this project includes excavation, earthfill, tile investigation, tile breaks, and tile installation.

Contact:
Jeff Felts

[email protected]




POTTAWATTAMIE -- PROJECT # 12-04-78-11                9/6/2012                Small Project Letting
LAKE MANAWA STATE PARK
SEDIMENT REMOVAL & PARKING LOT
Proposal Guarantee: $0
Completion Date: 11/4/2012

   Remove and dispose of the sediment in the river boat ramp parking area and place new gravel in the parking area and seed disturbed areas.

Contact:
Mark Johnson
515-250-3713
[email protected]




POTTAWATTAMIE -- PROJECT # 12-04-78-14                9/6/2012                Small Project Letting
LAKE MANAWA STATE PARK
REPAIR RETAINING WALL BY BEACH
Proposal Guarantee: $0
Completion Date: 11/4/2012

   Remove and dispose of the damaged sections of concrete seawall and replace with new and seed disturbed areas.

Contact:
Mark Johnson
515-250-3713
[email protected]




POTTAWATTAMIE -- PROJECT # 12-04-78-06                9/6/2012                Small Project Letting
WILSON ISLAND RECREATION AREA
DEMOLITION OF BUILDINGS
Proposal Guarantee: $0
Completion Date: 11/4/2012

   Remove and dispose of 5 buildings damaged by floodwaters.

Contact:
Mark Johnson
515-250-3713
[email protected]




POTTAWATTAMIE -- PROJECT # 12-04-78-05                9/6/2012                Small Project Letting
WILSON ISLAND STATE RECREATION AREA
RESTORE RIVERFRONT AREA
Proposal Guarantee: $0
Completion Date: 11/4/2012

   Remove and dispose of the sediment in the river boat ramp parking area and surrounding ares and place new gravel in the parking area and seed disturbed areas.

Contact:
Mark Johnson
515-250-3713
[email protected]




ADAMS -- PROJECT # 13-04-02-01                9/13/2012                Small Project Letting
MOUNT AYR FISHERIES MANAGEMENT UNIT
GATE REPAIR AT LAKE ICARIA
Proposal Guarantee: $0
Completion Date: 12/4/2012

   Replace the lift stem and remount the lift stem support brackets in the drawdown structure.

Contact:
Mark Johnson
515-250-3713
[email protected]




CERRO GORDO -- PROJECT # 13-03-17-02                9/13/2012                Small Project Letting
CLEAR LAKE STATE PARK
SHOWER FLOOR REPLACEMENT
Proposal Guarantee:
Completion Date: 10/12/2012

   Project consists of removing a minimum of 1/2" of existing concrete floor in 4 shower stalls, placing a concrete overlay that will slope toward drains, and paint floors with a slip resistant paint system.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




DELAWARE -- PROJECT # 13-03-28-01                9/13/2012                Small Project Letting
BACKBONE STATE PARK
REPLACE BARN SIDING AND WINDOWS
Proposal Guarantee:
Completion Date: 11/30/2012

   Project consists of placing stell siding and replacing window units on Park Office/Headquarters barn building.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




SAC -- PROJECT # 13-01-81-02                9/13/2012                Small Project Letting
BLACKHAWK LAKE
BLACKHAWK LAKE CONCRETE WEIR REPAIR
Proposal Guarantee: $0
Completion Date: 10/26/2012

   This project is designed to repair deteriorated and delaminated concrete on the outlet weir of Blackhawk Lake in Sac County. Work under this project includes removal of the existing deteriorated/delaminated concrete and replacement with the specified repair mortar.

Contact:
Jeff Felts

[email protected]




WEBSTER -- PROJECT # 12-02-94-01                9/13/2012                Small Project Letting
DOLLIVER STATE PARK
RV DUMP STATION & OTHER UPGRADES
Proposal Guarantee: $0
Completion Date: 11/15/2012

   This project entails the construction of a new RV dump station, camp pad and upgrades to the host camp site. Also included are plumbing repairs, new yard hydrants and a 50A service to the new camp site. Removal of the existing dump station and septic tank are a part of this project at Dolliver State Park in Webster County, Iowa.

Contact:
Don Labate
515-250-3714
[email protected]




WOODBURY -- PROJECT # 13-01-97-01                9/20/2012                Small Project Letting
LUTON WILDLIFE MANAGEMENT AREA
LUTON WMA DIKE REPAIRS
Proposal Guarantee: $0
Completion Date: 11/16/2012

   This project is designed to repair and improve a section of wetland dike and improve site access by repairing a ditch crossing and de-leveling some existing spoil on the Rand Tract of the Luton WMA in Woodbury County. Work under this project includes excavation (borrow), earthfill and site grading.

Contact:
Jeff Felts

[email protected]




JACKSON -- PROJECT # 12-06-49-04                9/27/2012                Small Project Letting
BELLEVUE FISHERIES STATION
RAMP REPAIR/WORK
Proposal Guarantee: $0
Completion Date: 10/15/2012

   Install approx 1600 square feet of ArmorFlex Articulating Concrete Block (ACB) 50S series, including all necessary site prep, around an existing boat ramp.

Contact:
Bruce Flippin

[email protected]




JACKSON -- PROJECT # 12-03-49-02                9/27/2012                Small Project Letting
BELLEVUE STATE PARK
REPLACE ROOF
Proposal Guarantee: $0
Completion Date: 10/26/2012

   Remove and replace shingles, flashings, ridge vent and roof sheathing. Approx 26 Square

Contact:
Bruce Flippin

[email protected]




TAYLOR -- PROJECT # 13-04-87-02                9/27/2012                Small Project Letting
LAKE OF THREE FIRES STATE PARK
SHORELINE ARMORING
Proposal Guarantee: $0
Completion Date: 11/28/2012

   Repair 950 feet of the existing shorline riprap on the 5 fishing jetties and around the beach using screened Class "D" riprap.

Contact:
Mark Johnson
515-250-3713
[email protected]