The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual. Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms, Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.
Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis.
To subscribe to this list, click here.
The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.
To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website.
You may obtain a free download from
Click on the project names below to view the one(s) which interest you.
This project consists of the construction of a one story, pre-engineered structural insulated panel (SIP) building with standing seam metal roofing and cement board siding, approximately 45' x 80', including three heated bays, a mechanical/electrical room, one restroom, a conference room, open office area and a storage room. The work also includes concrete and class "A" crushed stone paving, concrete paving, septic sewer, water and electrical services
ESTIMATED QUANTITIES:
EARTHWORK & ALL UNDERGROUND UTILITIES
1 L.S.
6" CLASS "A" CRUSHED STONE PAVING
1 L.S.
SITE RESTORATION
1 L.S.
CHAIN LINK FENCE & GATE
1 L.S.
6" EXTERIOR CONCRETE APRON
1 L.S.
CONCRETE PARKING LOT, PAVING & SIDEWALK
1 L.S.
45'-0" X 80'-0" SIPS BUILDING W/ ALL INTERNAL COMPONENTS AND FORCED-AIR HVAC
The work consists of the beach area renovation including new shelters, new restrooms, cabanas, storage shed, kiosk, concrete flat work, utilities, grading, and incidental work as required by the Plans and the DNR Construction Inspector.
ESTIMATED QUANTITIES:
Mobilization
1 L.S.
Earthwork
1 L.S.
Sanitary Sewer Service, Trenched, 6" PVC
340 L.F.
Sanitary Sewer, Cleanout, 6" Diam
3 Each
Connection to Existing Manhole
2 Each
Water Service Pipe,2" Diam
346 L.F.
Water Service Pipe, 1" Diam
487 L.F.
Water Main Connection, 4" x 2"
1 Each
Water Main Connection, 3" x 2"
2 Each
Manhole, SW-301 (48" Diam)
1 Each
Intake, Type SW-501, Top Only
1 Each
Intake, Type SW-512, (24" Diam)
1 Each
Intake, Pourous Fill Drain Pit
1 Each
Intake, Trench Drain
2 Each
Storm Sewer, Treanched, CMP, 12" Diam
73 L.F.
PCC Curb & Gutter, 30"
335 L.F.
Sidewalk, PCC 6"
4,812 S.Y.
Sidewalk, PCC 7"
50 S.Y.
Detectable Warnings
206 S.F.
Driveway, PCC, Type 1, 7"
130 S.Y.
Stormwater Pollution Prevention Plan (SWPPP)
1 L.S.
Silt Fence, Indtallation & Removal
700 L.F.
Construction Survey
1 L.S.
Drinking Fountain
1 Each
Yard Hydrant
4 Each
Shelter, Nominal 40'x68', Romtec Iowa DNR Custom
3 Each
Restroom, Nominal 18'x24', Romtec Iowa DNR Custom
3 Each
Cabanas, Nominal 13'x13', Romtec Iowa DNR Custom
9 Each
storage Building, Nominal 20'x30', As Shown on Plans
This project consists of the construction of a one story, pre-engineered structural insulated panel building with standing seam metal roofing and metal siding, approximately 50' x 110', including three heated bays, a mechanical/electrical room, two restrooms, a conference room, open office area, 4 offices, and a storage room. The work also includes concrete and class "A" crushed stone paving, septic sewer, water and electrical services.
This project consists of the placement of riprap revetment along portions of the
lake shoreline, and incidental work as required by the Plans and/or the DNR
Construction Inspector.
This project consists of the construction of a one story, pre-engineered post-frame building with a metal roof and metal siding, approximately 40' x 30', two cold storage bays, one restroom, fenced in equipment yard and beach area. The work also includes concrete and class "A" crushed stone paving, concrete paving and electrical services. Project number 12-05-91-01
This project entails the removal and replacement of a metal roof and gutters on a 4:12 sloped 30'x80' pole building at Boone Research Station in Ledges State Park in Boone County.
This project is designed to improve the existing water level control capabilities for the Eagle Lake Wildlife Area. Work under this project includes dewatering of the basin (+-3' on 80 acres), removal of the existing outlet tile, new 15" tile installation, two new tile inlets, and a new water control structure.
This project entails upgrading the host campsite from a 30 amp service to a 50 amp service, adding receptacles and conduit in the Park shop for garage door openers and misc. electrical upgrades at Ledges State Park in Boone County, Iowa.
This project entails upgrading the host campsite with sewer and water hook ups, repairing curb stops, repairing a water main leak, replacing a yard hydrant and other plumbing upgrades at Ledges State Park in Boone County, Iowa.
This project includes the demolition and removal of three shelters and two latrines and associated foundations and utilities, including an outside shower structure, at the beach complex at Big Creek State Park in Polk County, Iowa. All structures are constructed of timber framing with concrete masonry walls and concrete foundations.
This project is designed to provide two additional wetland pool areas to the wetland area known as Synco WPA in Dickinson County. Work under this project includes excavation, earthfill, tile investigation, tile breaks, and tile installation.
Remove and dispose of the sediment in the river boat ramp parking area and surrounding ares and place new gravel in the parking area and seed disturbed areas.
Project consists of removing a minimum of 1/2" of existing concrete floor in 4 shower stalls, placing a concrete overlay that will slope toward drains, and paint floors with a slip resistant paint system.
This project is designed to repair deteriorated and delaminated concrete on the outlet weir of Blackhawk Lake in Sac County. Work under this project includes removal of the existing deteriorated/delaminated concrete and replacement with the specified repair mortar.
This project entails the construction of a new RV dump station, camp pad and upgrades to the host camp site. Also included are plumbing repairs, new yard hydrants and a 50A service to the new camp site. Removal of the existing dump station and septic tank are a part of this project at Dolliver State Park in Webster County, Iowa.
This project is designed to repair and improve a section of wetland dike and improve site access by repairing a ditch crossing and de-leveling some existing spoil on the Rand Tract of the Luton WMA in Woodbury County. Work under this project includes excavation (borrow), earthfill and site grading.