PROJECTS LETTING -  August , 2012

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

CASS 12-04-15-04 Lake Anita State Park - New Shower Buildings-2012-08-16   Bid Completion detail
LUCAS 11-05-59-05 Williamson Pond WMA - Water Control Structures-2012-08-16   Bid Completion detail
MARION 11-05-63-11 Elk Rock State Park - Sewer & Lift Station Rehabilitation-2012-08-16   Bid Completion detail
SCOTT 08-06-82-04 Lost Grove Lake Access - Boat Ramp and Parking Lots-2012-08-16   Bid Completion detail
BOONE 13-02-08-02 Salylorville WMU at Boone Research Station - Replace Roof on Storage Building-2012-08-23   Bid Completion detail
KOSSUTH 12-02-55-01 Eagle Lake - install variable crest WCS-2012-08-23   Bid Completion detail
BOONE 12-02-08-03 Ledges State Park - Electrical Upgrades-2012-08-30   Bid Completion detail
BOONE 12-02-08-05 Ledges State Park - Sewer and Water Upgrades-2012-08-30   Bid Completion detail
LUCAS 11-05-59-06 Stephens State Forest Whitebreast Unit - Robert's Crossing -2012-08-30   Bid Completion detail
POLK 13-02-77-02 Big Creek State Park - Beach Area Demolition-2012-08-30   Bid Completion detail
BOONE 11-02-08-11 Saylorville Wildlife Unit - Headquarters Building Data Line-2012-09-06   Bid Completion detail
DICKINSON 13-01-30-07 Dugout Creek Wetland Complex - Synco Wetland RT-2012-09-06   Bid Completion detail
POTTAWATTAMIE 12-04-78-11 Lake Manawa State Park - Sediment removal & parking lot-2012-09-06   Bid Completion detail
POTTAWATTAMIE 12-04-78-14 Lake Manawa State Park - Repair retaining wall by beach-2012-09-06   Bid Completion detail
POTTAWATTAMIE 12-04-78-06 Wilson Island Recreation Area - Demolition of buildings-2012-09-06   Bid Completion detail
POTTAWATTAMIE 12-04-78-05 Wilson Island State Recreation Area - Restore riverfront area-2012-09-06   Bid Completion detail
ADAMS 13-04-02-01 Mount Ayr Fisheries Management Unit - Gate repair at Lake Icaria-2012-09-13   Bid Completion detail
CERRO GORDO 13-03-17-02 Clear Lake State Park - Shower Floor Replacement-2012-09-13   Bid Completion detail
DELAWARE 13-03-28-01 Backbone State Park - Replace barn siding and windows-2012-09-13   Bid Completion detail
SAC 13-01-81-02 Blackhawk Lake - Blackhawk Lake Concrete Weir Repair-2012-09-13   Bid Completion detail
WEBSTER 12-02-94-01 Dolliver State Park - RV Dump Station & Other Upgrades-2012-09-13   Bid Completion detail




CASS -- PROJECT # 12-04-15-04                8/16/2012                Large Project Letting
LAKE ANITA STATE PARK
NEW SHOWER BUILDINGS
Proposal Guarantee: $20,000
Completion Date: 4/1/2013

   Project consists of demolition of a latrine and demolition of an existing shower building, the procurement and installation of 2 precast concrete shower buildings, necessary sewer, water, and electrical utilities, concrete flatwork, site restoration and incidental items as required by the project documents and the IDNR construction inspector.

ESTIMATED QUANTITIES:
    DEMOLITION OF LATRINE     1 L.S.
    DEMOLITION OF SHOWER BUILDING     1 L.S.
    SITE WORK & BUILDINGS CONNECTIONS     1 L.S.
    PRECAST CONCRETE SHOWER BUILDING     2 Each
    CLASS "A" CRUSHED STONE     288 Tons
    SIDEWALK & PARKING, 6" CONCRETE     396 S.Y.
    DRAIN-DOWN PIT     2 Each
    2" WATER PIPE, CLASS 160 SDR 26     38 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LUCAS -- PROJECT # 11-05-59-05                8/16/2012                Large Project Letting
WILLIAMSON POND WMA
WATER CONTROL STRUCTURES
Proposal Guarantee: $5,000
Completion Date: 4/30/2013

   Project consists of the construction of sediment basins and water control structures in the vicinity of Williamsons Pond, site restoration and incidental items as required by the project documents and the IDNR construction inspector.

ESTIMATED QUANTITIES:
    Excavation, Class 13     41,840 C.Y.
    Smooth Metal Pipe,14" Diam. x 1/4"     96 L.F.
    Canopy Inlet with Trash Rack, 14" Diam.     1 Each
    Anti-seep Collar, 72" x 72" x 1/4"     4 Each
    Fence Replacement     1,088 L.F.
    Smooth Metal Pipe, 18" Diam. x 9/32"     90 L.F.
    Canopy Inlet with Trash Rack, 18" Diam.     1 Each
    Smooth Metal Pipe, 12" Diam. x 1/4"     94 L.F.
    Canopy Inlet with Trash Rack, 12" Diam.     1 Each
    Anti-seep Collar, 60" x 60" x 1/4"     2 Each
    Smooth Metal Pipe, 48" Diam. x 3/8"     65 L.F.
    Smooth Metal Pipe, 36" Diam. x 3/8"     50 L.F.
    Clearing & Grubbing     7 Acres
    5" Ag Intake     4 Each
    6" Ag Intake     4 Each
    5" Non-Perforated Tile     1,095 L.F.
    6" Non-Perforated Tile     755 L.F.
    6" Rodent Guard     7 Each
    Corrugated Metal Pipe Outlet, 6" x 20'     7 Each
    6" x 6" Tile Wye     1 Each
    Seeding, Fertilizing & Mulching     7 Acres
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SCOTT -- PROJECT # 08-06-82-04                8/16/2012                Large Project Letting
LOST GROVE LAKE ACCESS
BOAT RAMP AND PARKING LOTS
Proposal Guarantee: $5,000
Completion Date: 11/30/2012

   This project consists of constructing three granular surfaced parking lots, granular surfaced walking trails, site cleanup and incidental work as required by the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    15" Dia CMP     60 L.F.
    15" Dia CMP Aprons     12 Each
    24" Dia CMP     224 L.F.
    24" Dia CMP Aprons     12 Each
    3/8" Minus Crushed Stone     348 Tons
    Class "A" Road Stone     773 Tons
    Engineering Fabric     975 S.Y.
    Site Restoration     1 L.S.
    Class 10 Excavation     3,856 C.Y.
    Fencing     540 L.F.
    Class "D" Revetmetn     32 Tons
    2" Stone     12 Tons
    Fence Removal     2,219 L.F.
    Hullquist Site Cleanup     1 L.S.
    Engineering Fabric     224 S.Y.
    Class "D" Revetment     180 Tons
    Fine Limestone (DOT Grad. No. 8)     55 Tons
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MARION -- PROJECT # 11-05-63-11                8/16/2012                Small Project Letting
ELK ROCK STATE PARK
SEWER & LIFT STATION REHABILITATION
Proposal Guarantee: $0
Completion Date: 4/30/2013

   This project consists of rehabilitation of 1261' of sanitary sewer, lift station controls & pump, and 1195' of fencing around the lagoons.

Contact:
Jason Kruse

[email protected]




BOONE -- PROJECT # 13-02-08-02                8/23/2012                Small Project Letting
SALYLORVILLE WMU AT BOONE RESEARCH STATION
REPLACE ROOF ON STORAGE BUILDING
Proposal Guarantee: $0
Completion Date: 10/31/2012

   This project entails the removal and replacement of a metal roof and gutters on a 4:12 sloped 30'x80' pole building at Boone Research Station in Ledges State Park in Boone County.

Contact:
Don Labate
515-250-3714
[email protected]




KOSSUTH -- PROJECT # 12-02-55-01                8/23/2012                Small Project Letting
EAGLE LAKE
INSTALL VARIABLE CREST WCS
Proposal Guarantee: $0
Completion Date: 11/16/2012

   This project is designed to improve the existing water level control capabilities for the Eagle Lake Wildlife Area. Work under this project includes dewatering of the basin (+-3' on 80 acres), removal of the existing outlet tile, new 15" tile installation, two new tile inlets, and a new water control structure.

Contact:
Jeff Felts

[email protected]




BOONE -- PROJECT # 12-02-08-03                8/30/2012                Small Project Letting
LEDGES STATE PARK
ELECTRICAL UPGRADES
Proposal Guarantee: $0
Completion Date: 11/1/2012

   This project entails upgrading the host campsite from a 30 amp service to a 50 amp service, adding receptacles and conduit in the Park shop for garage door openers and misc. electrical upgrades at Ledges State Park in Boone County, Iowa.

Contact:
Don Labate
515-250-3714
[email protected]




BOONE -- PROJECT # 12-02-08-05                8/30/2012                Small Project Letting
LEDGES STATE PARK
SEWER AND WATER UPGRADES
Proposal Guarantee: $0
Completion Date: 9/28/2012

   This project entails upgrading the host campsite with sewer and water hook ups, repairing curb stops, repairing a water main leak, replacing a yard hydrant and other plumbing upgrades at Ledges State Park in Boone County, Iowa.

Contact:
Don Labate
515-250-3714
[email protected]




LUCAS -- PROJECT # 11-05-59-06                8/30/2012                Small Project Letting
STEPHENS STATE FOREST WHITEBREAST UNIT
ROBERT'S CROSSING
Proposal Guarantee: $0
Completion Date: 11/30/2012

   This project includes replacement of a ford style stream crossing.

Contact:
Jason Kruse

[email protected]




POLK -- PROJECT # 13-02-77-02                8/30/2012                Small Project Letting
BIG CREEK STATE PARK
BEACH AREA DEMOLITION
Proposal Guarantee: $0
Completion Date: 10/15/2012

   This project includes the demolition and removal of three shelters and two latrines and associated foundations and utilities, including an outside shower structure, at the beach complex at Big Creek State Park in Polk County, Iowa. All structures are constructed of timber framing with concrete masonry walls and concrete foundations.

Contact:
Don Labate
515-250-3714
[email protected]




BOONE -- PROJECT # 11-02-08-11                9/6/2012                Small Project Letting
SAYLORVILLE WILDLIFE UNIT
HEADQUARTERS BUILDING DATA LINE
Proposal Guarantee: $0
Completion Date: 10/1/2012

   Data Line tio be bored from the Research Station to the new Wildlife HQ Building at teh Saylorville Unit at Ledges State Park in Boone, IA.

Contact:
Don Labate
515-250-3714
[email protected]




DICKINSON -- PROJECT # 13-01-30-07                9/6/2012                Small Project Letting
DUGOUT CREEK WETLAND COMPLEX
SYNCO WETLAND RT
Proposal Guarantee: $0
Completion Date: 11/16/2012

   This project is designed to provide two additional wetland pool areas to the wetland area known as Synco WPA in Dickinson County. Work under this project includes excavation, earthfill, tile investigation, tile breaks, and tile installation.

Contact:
Jeff Felts

[email protected]




POTTAWATTAMIE -- PROJECT # 12-04-78-11                9/6/2012                Small Project Letting
LAKE MANAWA STATE PARK
SEDIMENT REMOVAL & PARKING LOT
Proposal Guarantee: $0
Completion Date: 11/4/2012

   Remove and dispose of the sediment in the river boat ramp parking area and place new gravel in the parking area and seed disturbed areas.

Contact:
Mark Johnson
515-250-3713
[email protected]




POTTAWATTAMIE -- PROJECT # 12-04-78-14                9/6/2012                Small Project Letting
LAKE MANAWA STATE PARK
REPAIR RETAINING WALL BY BEACH
Proposal Guarantee: $0
Completion Date: 11/4/2012

   Remove and dispose of the damaged sections of concrete seawall and replace with new and seed disturbed areas.

Contact:
Mark Johnson
515-250-3713
[email protected]




POTTAWATTAMIE -- PROJECT # 12-04-78-06                9/6/2012                Small Project Letting
WILSON ISLAND RECREATION AREA
DEMOLITION OF BUILDINGS
Proposal Guarantee: $0
Completion Date: 11/4/2012

   Remove and dispose of 5 buildings damaged by floodwaters.

Contact:
Mark Johnson
515-250-3713
[email protected]




POTTAWATTAMIE -- PROJECT # 12-04-78-05                9/6/2012                Small Project Letting
WILSON ISLAND STATE RECREATION AREA
RESTORE RIVERFRONT AREA
Proposal Guarantee: $0
Completion Date: 11/4/2012

   Remove and dispose of the sediment in the river boat ramp parking area and surrounding ares and place new gravel in the parking area and seed disturbed areas.

Contact:
Mark Johnson
515-250-3713
[email protected]




ADAMS -- PROJECT # 13-04-02-01                9/13/2012                Small Project Letting
MOUNT AYR FISHERIES MANAGEMENT UNIT
GATE REPAIR AT LAKE ICARIA
Proposal Guarantee: $0
Completion Date: 12/4/2012

   Replace the lift stem and remount the lift stem support brackets in the drawdown structure.

Contact:
Mark Johnson
515-250-3713
[email protected]




CERRO GORDO -- PROJECT # 13-03-17-02                9/13/2012                Small Project Letting
CLEAR LAKE STATE PARK
SHOWER FLOOR REPLACEMENT
Proposal Guarantee:
Completion Date: 10/12/2012

   Project consists of removing a minimum of 1/2" of existing concrete floor in 4 shower stalls, placing a concrete overlay that will slope toward drains, and paint floors with a slip resistant paint system.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




DELAWARE -- PROJECT # 13-03-28-01                9/13/2012                Small Project Letting
BACKBONE STATE PARK
REPLACE BARN SIDING AND WINDOWS
Proposal Guarantee:
Completion Date: 11/30/2012

   Project consists of placing stell siding and replacing window units on Park Office/Headquarters barn building.

Contact:
Mel Pacovsky
319-240-3553
[email protected]




SAC -- PROJECT # 13-01-81-02                9/13/2012                Small Project Letting
BLACKHAWK LAKE
BLACKHAWK LAKE CONCRETE WEIR REPAIR
Proposal Guarantee: $0
Completion Date: 10/26/2012

   This project is designed to repair deteriorated and delaminated concrete on the outlet weir of Blackhawk Lake in Sac County. Work under this project includes removal of the existing deteriorated/delaminated concrete and replacement with the specified repair mortar.

Contact:
Jeff Felts

[email protected]




WEBSTER -- PROJECT # 12-02-94-01                9/13/2012                Small Project Letting
DOLLIVER STATE PARK
RV DUMP STATION & OTHER UPGRADES
Proposal Guarantee: $0
Completion Date: 11/15/2012

   This project entails the construction of a new RV dump station, camp pad and upgrades to the host camp site. Also included are plumbing repairs, new yard hydrants and a 50A service to the new camp site. Removal of the existing dump station and septic tank are a part of this project at Dolliver State Park in Webster County, Iowa.

Contact:
Don Labate
515-250-3714
[email protected]