PROJECTS LETTING -  August , 2013

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DELAWARE 13-03-28-02 Backbone State Park - Emergency Boat Ramp Roadway Repair-2013-08-15   Bid Completion detail
HANCOCK 13-02-41-01 Pilot Knob State Park - SHOWER BUILDING, HOST CAMP SITE, WATER TREATMENT BUILDING & DUMP STATION-2013-08-15   Bid Completion detail
PALO ALTO 12-01-74-01 Lost Island Lake - Lost Island Lake Electric Fish Barrier-2013-08-15   Bid Completion detail
VAN BUREN 12-06-89-03 Lacey Keosauqua State Park - replace roof on lodge-2013-08-15   Bid Completion detail
ALLAMAKEE 14-03-03-01 Decorah Fisheries Management Unit - Waterloo Creek - Bank Stabilization-2013-08-29   Bid Completion detail
ALLAMAKEE 10-03-03-03 Nobels Island Boat Ramp - Concrete ramp Extension-2013-08-29   Bid Completion detail
DICKINSON 11-01-30-06 Spirit Lake Hatchery - Filter Pond Dredging-2013-08-29   Bid Completion detail
LUCAS 13-05-59-04 Stephens State Forest, Hidden Pond - Pond Outlet Replacement-2013-08-29   Bid Completion detail
GUTHRIE 14-04-39-03 Springbrook - shower bldg-2013-09-03   Bid Completion detail
APPANOOSE 14-05-04-02 Honey Creek Resort - Concrete Repairs, Replacements, Grinding, & Lifting-2013-09-05   Bid Completion detail
CERRO GORDO 14-03-17-01 Clear Lake Wildlife Unit - Ventura Marsh East Boat Ramp-2013-09-05   Bid Completion detail
DICKINSON 14-01-30-03 Welsh Lake WPA - DOT Wetland Mitigation - Lago Site #2 Channel (Rebid)-2013-09-12   Bid Completion detail
OSCEOLA 14-01-72-01 Rush Lake - Channel Cleaning-2013-09-12   Bid Completion detail
WINNESHIEK 13-03-96-04 Upper Iowa Wildlife Unit - Bluffton Canoe Access Parking-2013-09-12   Bid Completion detail




HANCOCK -- PROJECT # 13-02-41-01                8/15/2013                Large Project Letting
PILOT KNOB STATE PARK
SHOWER BUILDING, HOST CAMP SITE, WATER TREATMENT BUILDING & DUMP STATION
Proposal Guarantee: $20,000
Completion Date: 5/15/2014

   This project consists of the demolition of an existing shower building in the campground, installing a new shower building in the same location, installing a water treatment building, the removal of the existing dump station and constructing a new dump site in a different location, and constructing a new host campsite near the shower building. This includes installing sidewalks for access to the new building, all earthwork, supplying and installing the new structures and incidental work as required by the project documents and the IDNR Inspector at Pilot Knob State Parks in Hancock County, Iowa.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    CLEARING AND GRUBBING     1 L.S.
    SITE WORK AND UTILITY CONNECTIONS     1 L.S.
    CHEYENNE PRECAST CONCRETE SHOWER BUILDING     1 Each
    CLASS "A" CRUSHED STONE     477 Tons
    SIDEWALK, PCC, 6"     103 S.Y.
    PARKING LOT, PCC, 6"     61 S.Y.
    SIGNING     1 Each
    DRAIN-DOWN PIT     1 L.S.
    PRECAST CONCRETE PARKING WHEEL STOPS     1 Each
    EARTHWORK, CLASS 10, EXCAVATION     500 C.Y.
    EARTHWORK, CLASS 10, BORROW     460 C.Y.
    ENGINEERING FABRIC     139 S.Y.
    MACADAM STONE     31 Tons
    3/8" MINUS CRUSHED STONE     14 Tons
    PAINTED PAVEMENT MARK, WATERBORNE/SOLVENT     2.7 STA.
    CONCRETE BOLLARD     3 Each
    REMOVE EXISTING DUMP STATION     1 L.S.
    REMOVE EXISTING MANHOLES     2 Each
    REMOVE EXISTING SANITARY SEWER PIPE, 6"     39.36 L.F.
    ABANDON EXISTING SANITARY SEWER PIPE, 4"     68.53 L.F.
    MANHOLE, SW-301, 48"     3 Each
    SANITARY SEWER PIPE, 4" PVC     97.38 L.F.
    SANITARY SEWER PIPE, 6" PVC     478.15 L.F.
    WATER MAIN, 1" HDPE     361 L.F.
    WATER MAIN, 2" HDPE     165 L.F.
    SCHWEITZER UTILITY BUILDING, SMALL     1 Each
    WATER TREATMENT SYSTEM     1 L.S.
    ELECTRICAL SERVICE     228 L.F.
    ELECTRICAL CAMP PEDISTAL     1 Each
    RV TO SANITARY SEWER CONNECTION     1 Each
    YARD HYDRANT     1 Each
    INSTALL WIRE GATE AND POSTS     1 Each
    INSTALL METAL GATE     1 Each
    REMOVE GATE POSTS     2 Each
    CONCRETE PAVING, 6" C4 MIX     458 S.Y.
    DUMP STATION     1 L.S.
    CONCRETE ISLAND AT DUMP STATION     30 S.Y.
    EROSION CONTROL     584 L.F.
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.
    DROP INLET     2 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




PALO ALTO -- PROJECT # 12-01-74-01                8/15/2013                Large Project Letting
LOST ISLAND LAKE
LOST ISLAND LAKE ELECTRIC FISH BARRIER
Proposal Guarantee: $20,000
Completion Date: 12/13/2013

   This project is designed to add electric fish barrier components to the existing concrete box culvert that separates Lost Island Lake from Barrier Marsh. Work includes installation of steel electrodes inside the culvert, construction of an 8'x12' control building with associated components, installation of conduit and wire between the building and barrier, a small amount of site work, signage, and fencing.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Demobilization     1 L.S.
    Dewatering     1 L.S.
    Reinforced 6" PCC Building Slab     3.4 C.Y.
    Anchor Bolts, 5/8" dia x 8" long     25 Each
    Steel Plate, Strctural, for electrodes, 3/4" thick, shop fabricated include fastners     15 S.F.
    1/2" Steel Wire Rope, IPS, IWRC     130 L.F.
    Schedule 40 Conduit to Barrier     125 L.F.
    Fiberglass castings, square tube, 3" x 3" x 1/4" thick     24 L.F.
    Steel Sign Posts, 4lb Galvanized U-post, 10' long     6 Each
    #8 AWG 2000 Volt Locomotive Cable     780 L.F.
    Power/Communication Wiring     125 L.F.
    #8 AWG Ground Wire, copper wire, bare stranded     230 L.F.
    Tree Removal, Clear and Grub Site     1 L.S.
    Excavating, chain trencher, utility trench, 8" wide, 24" deep, backfill by hand, includes compaction     416 L.F.
    Fill, gravel fill, Compacted for Building Pad     42 Tons
    Synthetic Erosion Control, silt fence, 3' high     250 L.F.
    Fence, Chain Link Industrial, double swing gates, 8' high, 12' opening, includes excavation, posts in concrete, & hardware     1 Each
    Steel Fence Posts, 4" OD Galvanized for steel cable assembly, 10'-0" long set in concrete     10 Each
    Fence, Chain Link Industrial, galvanized steel, 6 ga wire, 2-1/2" posts @ 10' OC, 8' high, includes excavation, posts in concete     93 L.F.
    Fence, Chain Link Industrial, galvanized steel gate, 8' high, 3' opening, includes excavation, posts in concrete, & hardware     1 Each
    Supply and install control building including all fixtures     1 L.S.
    Manufacture, Supply and deliver SRI fish barrier equipment, includes installation if not listed as a seperate bid item     1 L.S.
    Schedule 80 Conduit for power and communication wiring     190 L.F.
    Kohler 8.5RES Generator     1 L.S.
    500 gal Propane Tank     1 L.S.
    3'x5' Informational Kiosk     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




VAN BUREN -- PROJECT # 12-06-89-03                8/15/2013                Large Project Letting
LACEY KEOSAUQUA STATE PARK
REPLACE ROOF ON LODGE
Proposal Guarantee: $5,000
Completion Date: 12/31/2013

   HISTORIC CCC LODGE TO RECEIVE NEW LANDMARK TL WEATHERED WOOD SHINGLES OVER NEW ¾" SHEATHING WITH 30LB FELT AND COPPER FLASHING IN VALLEYS AND RIDGE CAP; NEW FASCIA AND SOFFIT MATERIAL TO REPLACE THE EXISTING WHICH IS ROTTING AWAY AND NEW COPPER GUTTERS AND DOWNSPOUTS.

ESTIMATED QUANTITIES:
    RESHINGLE ENTIRE ROOF WITH LANDMARK TL WEATHERED WOOD SHINGLES, 16OZ LEAD COATED COPPER DRIP EDGE, VALLEY FLASHING AND RIDGE CAPS     1 L.S.
    NEW 3/4" PLYWOOD ROOF SHEATHING OVER ENTIRE ROOF WITH 30LB FELT AND WATER & ICE SHIELD 24 INCHES FROM EAVES, VALLEYS AND RIDGES     1 L.S.
    NEW 6" COPPER HALF-ROUND GUTTERS AND ROUND DOWNSPOUTS, TO EXTEND 20'-0"      1 L.S.
    NEW 1X CEDAR FASCIA AROUND ENTIRE PERIMETER OF ROOF, PAINT TO MATCH EXISTING BUILDING     1 L.S.
    REMOVE EXISTING SOFFIT AND REPLACE WITH NEW FIBER CEMENT BOARD SOFFIT, PAINT TO MATCH EXISTING     1 L.S.
    NEW 16OZ LEAD COATED COPPER STEP FLASHING AND NEW COPPER CRICKETS AROUND BOTH CHIMNEY STACKS     1 L.S.
Alternate
    6" GUTTERS AND DOWNSPOUTS TO BE ALUMINUM     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




GUTHRIE -- PROJECT # 14-04-39-03                9/3/2013                Large Project Letting
SPRINGBROOK
SHOWER BLDG
Proposal Guarantee: $10,000
Completion Date: 5/1/2014

   INSTALL NEW CMU THREE SHOWER AND THREE HOLE RESTROOM TO REPLACE OLD SHOWER BUILDING INSIDE SPRINGBROOK STATE PARK.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    CLEARING AND GRUBBING     1 L.S.
    SITE WORK AND UTILITY CONNECTIONS     1 L.S.
    SHOWER BUILDING AND ALL ARCHITECTURAL COMPONENTS     1 L.S.
    CLASS "A" CRUSHED STONE     52 Tons
    SIDEWALK PCC 6"     142.2 S.Y.
    PARKING LOT PCC 6"     62.2 S.Y.
    SIGNING     1 Each
    PRECAST CONCRETE PARKING WHEEL STOPS     2 Each
    EROSION CONTROL     245 L.F.
    CONSTRUCTION STAKING     1 L.S.
    ELECTRICAL SERVICE     1 L.S.
    LIFT STATION CONTROL PANEL INSTALLATION     1 Each
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DELAWARE -- PROJECT # 13-03-28-02                8/15/2013                Small Project Letting
BACKBONE STATE PARK
EMERGENCY BOAT RAMP ROADWAY REPAIR
Proposal Guarantee: $0
Completion Date: 9/20/2013

   Project consists of providing 900 CY off-site fill to be placed in the roadway embankment, furnishing & placing 680 Ton Class D revetment, replacing 840 SF 6" PC concrete shoulder, and removal of trees & debris as per plan & site DNR Engineer/Inspector. Plans & Specs may be obtained by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




ALLAMAKEE -- PROJECT # 14-03-03-01                8/29/2013                Small Project Letting
DECORAH FISHERIES MANAGEMENT UNIT
WATERLOO CREEK - BANK STABILIZATION
Proposal Guarantee: $0
Completion Date: 9/30/2013

   Project consists of stabilizing eroding streambanks at 8 locations totaling approx. 1960 LF. Work consists of bank shaping, hauling excess soil material to disposal site, placement of revetment on slopes, and cover crop seeding. Plans & Specs may be obtained by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




ALLAMAKEE -- PROJECT # 10-03-03-03                8/29/2013                Small Project Letting
NOBELS ISLAND BOAT RAMP
CONCRETE RAMP EXTENSION
Proposal Guarantee: $0
Completion Date: 10/31/2013

   Project consists of grading slope approximately 12' out from the end of the ramps, placing a subbase of clean 2" crushed stone , furnishing & placing "Armorflex" articulating concrete block revetment system or equal, with a top dressing of clean 2" crushed stone, and removing & replacing the docks. Plan & Specs may be ordered by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




DICKINSON -- PROJECT # 11-01-30-06                8/29/2013                Small Project Letting
SPIRIT LAKE HATCHERY
FILTER POND DREDGING
Proposal Guarantee: $0
Completion Date: 11/1/2013

   This project is designed to remove approximately 2' of sediment (1,600CY) from the filter pond at the Spirit Lake Hatchery Complex. The required removal method will be Hydraulic Dredging with the spoil material pumped into Geotube storage bags.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




LUCAS -- PROJECT # 13-05-59-04                8/29/2013                Small Project Letting
STEPHENS STATE FOREST, HIDDEN POND
POND OUTLET REPLACEMENT
Proposal Guarantee: $0
Completion Date: 10/31/2013

   This project consists of replacement of a 12" CMP pond outlet pipe with 12" SMP and other related work. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




APPANOOSE -- PROJECT # 14-05-04-02                9/5/2013                Small Project Letting
HONEY CREEK RESORT
CONCRETE REPAIRS, REPLACEMENTS, GRINDING, & LIFTING
Proposal Guarantee: $0
Completion Date: 11/30/2013

   This project consists of replacing, grinding, and lifting concrete slabs that have broken, settled, or heaved. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




CERRO GORDO -- PROJECT # 14-03-17-01                9/5/2013                Small Project Letting
CLEAR LAKE WILDLIFE UNIT
VENTURA MARSH EAST BOAT RAMP
Proposal Guarantee: $0
Completion Date: 9/17/2013

   Project consists of placing 6" PCC Paving over existing gravel boat ramp on the east end of the Ventura Marsh WMA. Project needs to be completed by Sept. 17,2013. Plans & Specs may be obtained by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




DICKINSON -- PROJECT # 14-01-30-03                9/12/2013                Small Project Letting
WELSH LAKE WPA
DOT WETLAND MITIGATION - LAGO SITE #2 CHANNEL (REBID)
Proposal Guarantee: $0
Completion Date: 11/27/2013

   This is a rebid of a project that is designed to serve as a water outlet area for a DOT mitigation project in the Welsh Lake wildlife area. Work under this project includes excavation of 1,139 ft of channel, 290 ft of 8" tile installation, tile breaks, and erosion control measures.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




OSCEOLA -- PROJECT # 14-01-72-01                9/12/2013                Small Project Letting
RUSH LAKE
CHANNEL CLEANING
Proposal Guarantee: $0
Completion Date: 1/31/2014

   This project is designed to improve depth and width of two existing channels in Rush Lake. Work under this project includes excavation of 2,420 ft of outlet channel, and 400 ft of boat ramp channel. The channels will have a 10' wide bottom and 2:1 side slopes. The total amount of excavation is approximately 1,950 CY.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




WINNESHIEK -- PROJECT # 13-03-96-04                9/12/2013                Small Project Letting
UPPER IOWA WILDLIFE UNIT
BLUFFTON CANOE ACCESS PARKING
Proposal Guarantee: $0
Completion Date: 11/1/2013

   Project consists of developing a surfaced parking area, access roadway and canoe launch lane. The area will have to be cleared of small trees. The entrance road will be reshaped with on-site barrow material and placement of large rock for traffic control. Disturbed areas will be seeded. Plans & Specs may be obtained by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov