PROJECTS LETTING -  August , 2013

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DES MOINES 12-06-29-04 Geode State Park - Beach Sewage Treatment Solution-2013-08-01   Bid Completion detail
SHELBY 12-04-83-05 Prairie Rose State Park - Dredge Spoil Containment Site-2013-08-01   Bid Completion detail
TAMA 13-05-86-01 Union Grove State Park - Cabin #2-2013-08-01   Bid Completion detail
TAMA 13-05-86-01 Union Grove State Park - Cabin #2 - Bonding Company Contract-2013-08-01   Bid Completion detail
WASHINGTON 10-06-92-14 Lake Darling State Park - Dredging, Shoreline Armoring and PCC Paving-2013-08-01   Bid Completion detail
WEBSTER 13-02-94-01 Brushy Creek SRA - 2-1BDRM - Year RD Cabins-2013-08-01   Bid Completion detail
DELAWARE 13-03-28-02 Backbone State Park - Emergency Boat Ramp Roadway Repair-2013-08-15   Bid Completion detail
HANCOCK 13-02-41-01 Pilot Knob State Park - SHOWER BUILDING, HOST CAMP SITE, WATER TREATMENT BUILDING & DUMP STATION-2013-08-15   Bid Completion detail
PALO ALTO 12-01-74-01 Lost Island Lake - Lost Island Lake Electric Fish Barrier-2013-08-15   Bid Completion detail
VAN BUREN 12-06-89-03 Lacey Keosauqua State Park - replace roof on lodge-2013-08-15   Bid Completion detail
ALLAMAKEE 14-03-03-01 Decorah Fisheries Management Unit - Waterloo Creek - Bank Stabilization-2013-08-29   Bid Completion detail
ALLAMAKEE 10-03-03-03 Nobels Island Boat Ramp - Concrete ramp Extension-2013-08-29   Bid Completion detail
DICKINSON 11-01-30-06 Spirit Lake Hatchery - Filter Pond Dredging-2013-08-29   Bid Completion detail
LUCAS 13-05-59-04 Stephens State Forest, Hidden Pond - Pond Outlet Replacement-2013-08-29   Bid Completion detail




SHELBY -- PROJECT # 12-04-83-05                8/1/2013                Large Project Letting
PRAIRIE ROSE STATE PARK
DREDGE SPOIL CONTAINMENT SITE
Proposal Guarantee: $20,000
Completion Date: 5/30/2014

   This project consists of a compacted earthfill dredge spoil containment site and incidental work as required by the Plans and the DNR Engineer.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Excavation, On Site Borrow     239,431 C.Y.
    Pollution Control, Silt Fence     3,500 L.F.
    Field Fence, Type 47     4,200 L.F.
    Construction Survey     1 L.S.
    Pipe, 30" dia. CMP     180 L.F.
    Apron, Metal, 30" Dia. RF-5     1 Each
    Revetment, Class D     383 Tons
    Coarse Drainfill     23 Tons
    Fine Drainfill     40.5 Tons
    Seeding, Fertilizing and Mulching     12 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




TAMA -- PROJECT # 13-05-86-01                8/1/2013                Large Project Letting
UNION GROVE STATE PARK
CABIN #2
Proposal Guarantee: $10,000
Completion Date: 5/1/2014

   INSTALL ONE NEW DESIGN GUIDE CABIN AT THE PARK. EXISTING INFRASTRUCTURE AND UTILITIES ARE ALREADY IN PLACE FROM PREVIOUS DEVELOPMENT. THESE CABINS WILL HAVE ONE BEDROOM, KITCHEN AND LIVING ROOM AREA, ONE ADA COMPLIANT RESTROOM AND MECHANICAL ROOM TOTALLING 500 SF. IT WILL ALSO HAVE AN EXTERIOR DECK ON THE BACKSIDE OF THE CABIN.

ESTIMATED QUANTITIES:
    CLEARING AND GRUBBING     1 L.S.
    GRADING     1 L.S.
    SEEDING, FERTILIZING AND MULCHING     1 L.S.
    8" FILTER SOCK     210 L.F.
    GRANULAR BASE     28 Tons
    5" REINFORCED PCC SIDEWALK PAVEMENT     32.3 S.Y.
    6" REINFORCED PCC PARKING PAVEMENT     134 S.Y.
    4" SANITARY SEWER SERVICE     220 L.F.
    4" SANITARY SEWER SERVICE WYE     1 Each
    SANITARY SEWER SERVICE CLEANOUTS     3 Each
    1" PE WATER SERVICE     55 L.F.
    1" TAP SADDLES     1 Each
    WATER SERVICE CURB STOP     1 Each
    12" CMP     20 L.F.
    12" CMP FES     2 Each
    ELECTRICAL SERVICE     1 L.S.
    PRECAST CONCRETE PARKING WHEEL STOPS     3 Each
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.
    CABIN AND ALL ASSOCIATED ITEMS (ARCHITECTURAL, MECHANICAL AND ELECTRICAL)     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WASHINGTON -- PROJECT # 10-06-92-14                8/1/2013                Large Project Letting
LAKE DARLING STATE PARK
DREDGING, SHORELINE ARMORING AND PCC PAVING
Proposal Guarantee: $200,000
Completion Date: 9/30/2014

   This project consists of removing the existing HMA and PCC pavement, grading the main boat ramp arae, constructing a sheet pile marina and boat slip, two PCC boat ramps, a PCC fishing trail, two fishing jetties, shoreline armoring, lake dredging and incidental work as required by the DNR District Engineer.

ESTIMATED QUANTITIES:
    Class 10 Excavation     57,927 C.Y.
    6" Perforated PVC     309 L.F.
    12" RCP     365 L.F.
    12" RCP Apron     1 Each
    24" RCP     1,005 L.F.
    24" RCP Apron     24 Each
    30" RCP     161 L.F.
    30" RCP Apron     2 Each
    30" Joint Block     2 Each
    36" RCP     155 L.F.
    36" RCP Apron     2 Each
    36" Joint Block     2 Each
    48" RCP     100 L.F.
    48" RCP Apron     1 Each
    48" Riser     1 Each
    SW-511 Intake     1 Each
    SW-512 Intake     3 Each
    18" CMP     63 L.F.
    18" CMP Apron     6 Each
    24" CMP     45 L.F.
    24" CMP Apron     2 Each
    OSR-390     1 Each
    5" PCC     6,588 S.Y.
    7" PCC     51,259 S.Y.
    Pavement Removal     48,016 S.Y.
    Modified Subbase     10,633 C.Y.
    Shoulders     1,257.37 STA.
    Seeding and Fertilizing     30 Acres
    Subdrain     36,737 L.F.
    24" Joint Block     4 Each
    Shelter and Swing Demo     1 L.S.
    Light Pole and Base     8 Each
    Transformer Base     1 Each
    Pavement Striping     58.78 STA.
    Electrical Service - Main Boat Ramp     1 L.S.
    Electrical Service - Lodge Parking     1 L.S.
    Subdrain Outlet     165 Each
    6" PCC     1,900 S.Y.
    Dump Station, Complete     1 L.S.
    Connect to Utilities     1 L.S.
    Class "A" Crushed Stone     3,003 Tons
    Class "D" Revetment     19,183 Tons
    Engineering Fabric     24,284 S.Y.
    Concrete, Structural (6")     1,303 S.Y.
    Precast Concrete Pit Latrine     2 Each
    Handicap Parking Sign     7 Each
    Pit Latrine Demo     1 L.S.
    Sheet Piling - Install Only     3,800 S.F.
    Bridge Planks     735 L.F.
    Beach Sand     4,560 Tons
    3/8" Minus Granular Surfacing     179 Tons
    Lift Station Modifications     1 L.S.
    Clearing and Grubbing     28.5 Acres
    Sediment Removal     158,118 C.Y.
    4" PVC Watermain     1,700 L.F.
    3" HDPE WW Forcemain     1,700 L.F.
    Silt Fence     5,500 L.F.
    Access Route     1 L.S.
    Soil Matrix     280 C.Y.
    Porous Backfill     181 Tons
    Native Prairie Seeding     0.5 Acres
    Bumpout     10 Each
    40'x65' Picnic Shelter     1 L.S.
    Benches     8 Each
    Fishing Pier     1 L.S.
    2" Rock     16 Tons
    Stripping, Salvaging and Spreading Topsoil     49,046 C.Y.
    Stabilizing Crop Seeding and Fertilizing     28.5 Acres
    Mulching     58.5 Acres
    CPM Schedule     1 L.S.
    Mobilization     1 L.S.
    Incentive Payments     0 Day
    Disincentive Payments     0 Day

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WEBSTER -- PROJECT # 13-02-94-01                8/1/2013                Large Project Letting
BRUSHY CREEK SRA
2-1BDRM - YEAR RD CABINS
Proposal Guarantee: $15,000
Completion Date: 5/1/2014

   INSTALL TWO NEW DESIGN GUIDE CABINS AT THE PARK. EXISTING INFRASTRUCTURE AND UTILITIES ARE ALREADY IN PLACE FROM PREVIOUS DEVELOPMENT. THESE CABINS WILL HAVE ONE BEDROOM, KITCHEN AND LIVING ROOM AREA, ONE ADA COMPLIANT RESTROOM AND MECHANICAL ROOM TOTALLING 500 SF. IT WILL ALSO HAVE AN EXTERIOR DECK ON THE BACKSIDE OF THE CABIN.

ESTIMATED QUANTITIES:
    CLEARING AND GRUBBING     1 L.S.
    GRADING     1 L.S.
    SEEDING, FERTILIZING AND MULCHING     1 L.S.
    8" FILTER SOCK     185 L.F.
    GRANULAR BASE     35 Tons
    5" REINFORCED PCC SIDEWALK PAVEMENT     69 S.Y.
    6" REINFORCED PCC PARKING PAVEMENT     138 S.Y.
    4" SANITARY SEWER SERVICE     72 L.F.
    4" SANITARY SEWER SERVICE WYE     1 Each
    SANITARY SEWER SERVICE CLEANOUTS     2 Each
    1" PE WATER SERVICE     55 L.F.
    1" TAP SADDLES     2 Each
    WATER SERVICE CURB STOP     2 Each
    ELECTRICAL SERVICE     1 L.S.
    PRECAST CONCRETE PARKING WHEEL STOPS     6 Each
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.
    CABIN AND ALL ASSOCIATED ITEMS (ARCHITECTURAL, MECHANICAL AND ELECTRICAL)     2 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HANCOCK -- PROJECT # 13-02-41-01                8/15/2013                Large Project Letting
PILOT KNOB STATE PARK
SHOWER BUILDING, HOST CAMP SITE, WATER TREATMENT BUILDING & DUMP STATION
Proposal Guarantee: $20,000
Completion Date: 5/15/2014

   This project consists of the demolition of an existing shower building in the campground, installing a new shower building in the same location, installing a water treatment building, the removal of the existing dump station and constructing a new dump site in a different location, and constructing a new host campsite near the shower building. This includes installing sidewalks for access to the new building, all earthwork, supplying and installing the new structures and incidental work as required by the project documents and the IDNR Inspector at Pilot Knob State Parks in Hancock County, Iowa.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    CLEARING AND GRUBBING     1 L.S.
    SITE WORK AND UTILITY CONNECTIONS     1 L.S.
    CHEYENNE PRECAST CONCRETE SHOWER BUILDING     1 Each
    CLASS "A" CRUSHED STONE     477 Tons
    SIDEWALK, PCC, 6"     103 S.Y.
    PARKING LOT, PCC, 6"     61 S.Y.
    SIGNING     1 Each
    DRAIN-DOWN PIT     1 L.S.
    PRECAST CONCRETE PARKING WHEEL STOPS     1 Each
    EARTHWORK, CLASS 10, EXCAVATION     500 C.Y.
    EARTHWORK, CLASS 10, BORROW     460 C.Y.
    ENGINEERING FABRIC     139 S.Y.
    MACADAM STONE     31 Tons
    3/8" MINUS CRUSHED STONE     14 Tons
    PAINTED PAVEMENT MARK, WATERBORNE/SOLVENT     2.7 STA.
    CONCRETE BOLLARD     3 Each
    REMOVE EXISTING DUMP STATION     1 L.S.
    REMOVE EXISTING MANHOLES     2 Each
    REMOVE EXISTING SANITARY SEWER PIPE, 6"     39.36 L.F.
    ABANDON EXISTING SANITARY SEWER PIPE, 4"     68.53 L.F.
    MANHOLE, SW-301, 48"     3 Each
    SANITARY SEWER PIPE, 4" PVC     97.38 L.F.
    SANITARY SEWER PIPE, 6" PVC     478.15 L.F.
    WATER MAIN, 1" HDPE     361 L.F.
    WATER MAIN, 2" HDPE     165 L.F.
    SCHWEITZER UTILITY BUILDING, SMALL     1 Each
    WATER TREATMENT SYSTEM     1 L.S.
    ELECTRICAL SERVICE     228 L.F.
    ELECTRICAL CAMP PEDISTAL     1 Each
    RV TO SANITARY SEWER CONNECTION     1 Each
    YARD HYDRANT     1 Each
    INSTALL WIRE GATE AND POSTS     1 Each
    INSTALL METAL GATE     1 Each
    REMOVE GATE POSTS     2 Each
    CONCRETE PAVING, 6" C4 MIX     458 S.Y.
    DUMP STATION     1 L.S.
    CONCRETE ISLAND AT DUMP STATION     30 S.Y.
    EROSION CONTROL     584 L.F.
    CONSTRUCTION STAKING     1 L.S.
    MOBILIZATION     1 L.S.
    DROP INLET     2 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




PALO ALTO -- PROJECT # 12-01-74-01                8/15/2013                Large Project Letting
LOST ISLAND LAKE
LOST ISLAND LAKE ELECTRIC FISH BARRIER
Proposal Guarantee: $20,000
Completion Date: 12/13/2013

   This project is designed to add electric fish barrier components to the existing concrete box culvert that separates Lost Island Lake from Barrier Marsh. Work includes installation of steel electrodes inside the culvert, construction of an 8'x12' control building with associated components, installation of conduit and wire between the building and barrier, a small amount of site work, signage, and fencing.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Demobilization     1 L.S.
    Dewatering     1 L.S.
    Reinforced 6" PCC Building Slab     3.4 C.Y.
    Anchor Bolts, 5/8" dia x 8" long     25 Each
    Steel Plate, Strctural, for electrodes, 3/4" thick, shop fabricated include fastners     15 S.F.
    1/2" Steel Wire Rope, IPS, IWRC     130 L.F.
    Schedule 40 Conduit to Barrier     125 L.F.
    Fiberglass castings, square tube, 3" x 3" x 1/4" thick     24 L.F.
    Steel Sign Posts, 4lb Galvanized U-post, 10' long     6 Each
    #8 AWG 2000 Volt Locomotive Cable     780 L.F.
    Power/Communication Wiring     125 L.F.
    #8 AWG Ground Wire, copper wire, bare stranded     230 L.F.
    Tree Removal, Clear and Grub Site     1 L.S.
    Excavating, chain trencher, utility trench, 8" wide, 24" deep, backfill by hand, includes compaction     416 L.F.
    Fill, gravel fill, Compacted for Building Pad     42 Tons
    Synthetic Erosion Control, silt fence, 3' high     250 L.F.
    Fence, Chain Link Industrial, double swing gates, 8' high, 12' opening, includes excavation, posts in concrete, & hardware     1 Each
    Steel Fence Posts, 4" OD Galvanized for steel cable assembly, 10'-0" long set in concrete     10 Each
    Fence, Chain Link Industrial, galvanized steel, 6 ga wire, 2-1/2" posts @ 10' OC, 8' high, includes excavation, posts in concete     93 L.F.
    Fence, Chain Link Industrial, galvanized steel gate, 8' high, 3' opening, includes excavation, posts in concrete, & hardware     1 Each
    Supply and install control building including all fixtures     1 L.S.
    Manufacture, Supply and deliver SRI fish barrier equipment, includes installation if not listed as a seperate bid item     1 L.S.
    Schedule 80 Conduit for power and communication wiring     190 L.F.
    Kohler 8.5RES Generator     1 L.S.
    500 gal Propane Tank     1 L.S.
    3'x5' Informational Kiosk     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




VAN BUREN -- PROJECT # 12-06-89-03                8/15/2013                Large Project Letting
LACEY KEOSAUQUA STATE PARK
REPLACE ROOF ON LODGE
Proposal Guarantee: $5,000
Completion Date: 12/31/2013

   HISTORIC CCC LODGE TO RECEIVE NEW LANDMARK TL WEATHERED WOOD SHINGLES OVER NEW ¾" SHEATHING WITH 30LB FELT AND COPPER FLASHING IN VALLEYS AND RIDGE CAP; NEW FASCIA AND SOFFIT MATERIAL TO REPLACE THE EXISTING WHICH IS ROTTING AWAY AND NEW COPPER GUTTERS AND DOWNSPOUTS.

ESTIMATED QUANTITIES:
    RESHINGLE ENTIRE ROOF WITH LANDMARK TL WEATHERED WOOD SHINGLES, 16OZ LEAD COATED COPPER DRIP EDGE, VALLEY FLASHING AND RIDGE CAPS     1 L.S.
    NEW 3/4" PLYWOOD ROOF SHEATHING OVER ENTIRE ROOF WITH 30LB FELT AND WATER & ICE SHIELD 24 INCHES FROM EAVES, VALLEYS AND RIDGES     1 L.S.
    NEW 6" COPPER HALF-ROUND GUTTERS AND ROUND DOWNSPOUTS, TO EXTEND 20'-0"      1 L.S.
    NEW 1X CEDAR FASCIA AROUND ENTIRE PERIMETER OF ROOF, PAINT TO MATCH EXISTING BUILDING     1 L.S.
    REMOVE EXISTING SOFFIT AND REPLACE WITH NEW FIBER CEMENT BOARD SOFFIT, PAINT TO MATCH EXISTING     1 L.S.
    NEW 16OZ LEAD COATED COPPER STEP FLASHING AND NEW COPPER CRICKETS AROUND BOTH CHIMNEY STACKS     1 L.S.
Alternate
    6" GUTTERS AND DOWNSPOUTS TO BE ALUMINUM     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DES MOINES -- PROJECT # 12-06-29-04                8/1/2013                Small Project Letting
GEODE STATE PARK
BEACH SEWAGE TREATMENT SOLUTION
Proposal Guarantee:
Completion Date: 9/30/2013

   The project involves replacing pumps in an existing Lift Station, replacing the existing sewer lateral with a new 6 inch latral and directional boring approx. 3500 ft. of 2" HDPE Forcemain and connecting it to an existing manhole.

Contact:
Heath Delzell
(515) 979-0104
heath.delzell@dnr.iowa.gov




DELAWARE -- PROJECT # 13-03-28-02                8/15/2013                Small Project Letting
BACKBONE STATE PARK
EMERGENCY BOAT RAMP ROADWAY REPAIR
Proposal Guarantee: $0
Completion Date: 9/20/2013

   Project consists of providing 900 CY off-site fill to be placed in the roadway embankment, furnishing & placing 680 Ton Class D revetment, replacing 840 SF 6" PC concrete shoulder, and removal of trees & debris as per plan & site DNR Engineer/Inspector. Plans & Specs may be obtained by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




ALLAMAKEE -- PROJECT # 14-03-03-01                8/29/2013                Small Project Letting
DECORAH FISHERIES MANAGEMENT UNIT
WATERLOO CREEK - BANK STABILIZATION
Proposal Guarantee: $0
Completion Date: 9/30/2013

   Project consists of stabilizing eroding streambanks at 8 locations totaling approx. 1960 LF. Work consists of bank shaping, hauling excess soil material to disposal site, placement of revetment on slopes, and cover crop seeding. Plans & Specs may be obtained by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




ALLAMAKEE -- PROJECT # 10-03-03-03                8/29/2013                Small Project Letting
NOBELS ISLAND BOAT RAMP
CONCRETE RAMP EXTENSION
Proposal Guarantee: $0
Completion Date: 10/31/2013

   Project consists of grading slope approximately 12' out from the end of the ramps, placing a subbase of clean 2" crushed stone , furnishing & placing "Armorflex" articulating concrete block revetment system or equal, with a top dressing of clean 2" crushed stone, and removing & replacing the docks. Plan & Specs may be ordered by email.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




DICKINSON -- PROJECT # 11-01-30-06                8/29/2013                Small Project Letting
SPIRIT LAKE HATCHERY
FILTER POND DREDGING
Proposal Guarantee: $0
Completion Date: 11/1/2013

   This project is designed to remove approximately 2' of sediment (1,600CY) from the filter pond at the Spirit Lake Hatchery Complex. The required removal method will be Hydraulic Dredging with the spoil material pumped into Geotube storage bags.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




LUCAS -- PROJECT # 13-05-59-04                8/29/2013                Small Project Letting
STEPHENS STATE FOREST, HIDDEN POND
POND OUTLET REPLACEMENT
Proposal Guarantee: $0
Completion Date: 10/31/2013

   This project consists of replacement of a 12" CMP pond outlet pipe with 12" SMP and other related work. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov