The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual. Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms, Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.
Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis.
To subscribe to this list, click here.
The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.
To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website.
You may obtain a free download from 


Plans can be ordered by following this link: http://bit.ly/IADNRPlans 
|
|
APPANOOSE -- PROJECT # 10-05-04-06 7/29/2010 Small Project Letting
|
HONEY CREEK RESORT
|
| DAY USE AREA MODERN RESTROOM |
Proposal Guarantee: $2,500
|
Completion Date: 10/15/2010
|
| | This project consists of the installation of utilities for a modern restroom, including sewer, water, and electric.
|
Contact: Jason Kruse (515) 250-3707 [email protected]
|
|
PLYMOUTH -- PROJECT # 10-01-75-02 7/29/2010 Small Project Letting
|
STONE STATE PARK
|
| TWO PIT VAULTS CAMPGROUND |
Proposal Guarantee: $0
|
Completion Date: 9/3/2010
|
| | The scope of this project includes the installation of fill dirt around a new pit toilet structure, installation of handicap accessible sidewalk, and the abandonment of a pit under an existing restroom.
|
Contact: Jeff Felts 515-250-3712 [email protected]
|
|
ADAIR -- PROJECT # 11-04-01-02 8/5/2010 Small Project Letting
|
MEADOW LAKE FISH AND WILDLIFE AREA
|
| WEST SEDIMENT CONTROL STRUCTURE |
Proposal Guarantee:
|
Completion Date: 11/10/2010
|
| | This pond has 9,507 CY of earth fill in place with a 6" diameter smooth metal pipe outlet.
|
Contact: Mark Johnson 515-250-3713 [email protected]
|
|
APPANOOSE -- PROJECT # 10-05-04-02 8/5/2010 Small Project Letting
|
HONEY CREEK RESORT STATE PARK
|
| ACTIVITY CENTER FOUNDATION |
Proposal Guarantee:
|
Completion Date: 9/30/2010
|
| | This project consists of the construction of a footing and basement designed to accept the ISU interlock Solar building, and any incidental work as required by plans and or by DNR construction Inspector.
|
Contact: Jason Kruse (515) 250-3707 [email protected]
|
|
MONONA -- PROJECT # 10-01-67-04 8/5/2010 Small Project Letting
|
LEWIS AND CLARK STATE PARK
|
| PIT TOILET DEMOLITION |
Proposal Guarantee: $0
|
Completion Date: 11/12/2010
|
| | The scope of this project includes the complete removal of three pit toilet structures located in Lewis & Clark State Park. Work will include the demolition and removal of the structures, earthfill, and seeding.
|
Contact: Jeff Felts 515-250-3712 [email protected]
|
|
WASHINGTON -- PROJECT # 10-06-92-11 8/5/2010 Small Project Letting
|
LAKE DARLING STATE PARK
|
| ROAD CULVERT REPAIR |
Proposal Guarantee:
|
Completion Date: 9/3/2010
|
| | The project is in Lake Darling State Park at an eroded culvert crossing under a park road. Repair includes repair of a twin concrete pipe culvert with a concrete box inlet, and rebuilding the eroded road embankment.
Work items include Temporary Diversion of Stream (lump sum), Remove and Reinstall 54" Concrete Pipe Culvert and Aprons (148 lin ft), Macadam Stone (50 ton), Class A Crushed Stone (150 ton), Structural Concrete (9.0 cu yd), Removal of Asphalt Pavement (294 sq yd), Seed-Fertilize-Mulch (lump sum), Bentonite for Liner (650 lb), Class 20 Excavation (580 cu yd)
|
Contact: David Heer (515) 250-3719 [email protected]
|
|
BENTON -- PROJECT # 10-06-06-01 8/19/2010 Small Project Letting
|
DUDGEON LAKE WILDLIFE AREA
|
| ANDERSON MARSH DIKE REPAIR |
Proposal Guarantee:
|
Completion Date:
|
| | Earthwork and seeding
|
Contact: Heath Delzell (515) 979-0104 [email protected]
|
|
CERRO GORDO -- PROJECT # 10-03-17-06 8/19/2010 Small Project Letting
|
CLEAR LAKE STATE PARK
|
| PIT VAULT |
Proposal Guarantee:
|
Completion Date: 9/10/2010
|
| | Remove & dispose pit vault latrine
|
Contact: Mel Pacovsky 319-240-3553 [email protected]
|
|
DELAWARE -- PROJECT # 10-03-28-01 8/19/2010 Small Project Letting
|
BACKBONE STATE PARK
|
| PIT VAULT REPLACEMENT |
Proposal Guarantee:
|
Completion Date: 9/10/2010
|
| | Remove & dispose pit vault latrine
|
Contact: Mel Pacovsky 319-240-3553 [email protected]
|
|
HARRISON -- PROJECT # 11-04-43-01 8/19/2010 Small Project Letting
|
LOESS HILLS STATE FOREST
|
| MOVE EXISTING STORAGE BUILDINGS |
Proposal Guarantee:
|
Completion Date: 11/10/2010
|
| | Dismantle, move and reassemble a 40x80 metal shed and a 30x55 metal shed to a new location about 2 miles total. Place a compacted 6" rock base in the buildings and concrete floor in portions of the buildings after moving.
|
Contact: Mark Johnson 515-250-3713 [email protected]
|
|
MUSCATINE -- PROJECT # 08-06-70-05 8/19/2010 Small Project Letting
|
WILDCAT DEN STATE PARK
|
| NEW PARKING AND UTILITIES |
Proposal Guarantee: $5,000
|
Completion Date: 12/15/2010
|
| | This project consists of clearing and grubbing, installation of two Advantex wastewater treatment systems, installing new water treatment system, replacing PVC waterline, electrical connections, grading and surfacing new crushed stone parking lot, laying PCC side walk and seeding and incidental work as required by the Plans and/or the DNR Construction Inspector.
|
Contact: David Heer (515) 250-3719 [email protected]
|
|
BLACK HAWK -- PROJECT # 09-03-07-11 8/26/2010 Small Project Letting
|
GEORGE WYTH STATE PARK
|
| REPLACE PITVAULT (2) AND ADD NEW FLUSH TOILET |
Proposal Guarantee:
|
Completion Date: 10/29/2010
|
| | This project consists of beach reconstruction, pavement removal, PCC Paving of roadway and sidewalks, water and sewer system inspections and a new buried electric service line to the site.
|
Contact: Mel Pacovsky 319-240-3553 [email protected]
|