PROJECTS LETTING -  July , 2017

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

BOONE 16-02-08-04 Ledges State Park - River Access/Parking, DSM River-2017-07-20   Bid Completion detail
CLAYTON 17-03-22-02 Big Spring Hatchery - Replace main water inlet pipe-2017-07-20   Bid Completion detail
DES MOINES 17-06-29-01 Odessa Wildlife Unit - Chemical storage shed-2017-07-20   Bid Completion detail
JONES 16-06-53-03 Central Park Lake - Boat Ramp, Fishing Access, and Beach Construction-2017-07-20   Bid Completion detail
JONES 16-06-53-03 Central Park Lake - Boat Ramp, Fishing Access, and Beach Construction-2017-07-20   Bid Completion detail
JONES 16-06-53-03 Central Park Lake - Boat Ramp, Fishing Access, and Beach Construction -Supplemental Contract-2017-07-20   Bid Completion detail
STORY 16-02-85-02 Hickory Grove Lake - In-Lake and Watershed Improvement-2017-07-20   Bid Completion detail
STORY 17-02-85-03 State Forest Nursery - Storage Building-2017-07-20   Bid Completion detail
STORY 18-02-85-01 State Forest Nursery - Tiling of Nursery Beds-2017-07-27   Bid Completion detail
VAN BUREN 15-06-89-05 Lake Sugema Wildlife Management Area - Tug Forks Boat Ramp Replacement (TSB Contract)-2017-07-28   Bid Completion detail
APPANOOSE 17-05-04-10 Honey Creek Resort - Dock Bumpers - Vertical-2017-08-03   Bid Completion detail
ADAIR 17-04-01-01 Other - Meadow Lake Jetty Repair-2017-08-10   Bid Completion detail
APPANOOSE 18-05-04-03 Sedan Bottoms - Drake Area, Stoplog Structure-2017-08-10   Bid Completion detail
HARRISON 17-04-43-01 Loess Hills State Forest - Tuff Shed Cabins-2017-08-10   Bid Completion detail
WASHINGTON 18-06-92-01 Lake Darling State Park - Pedestrian Bridge Abutments and Approaches-2017-08-10   Bid Completion detail
CERRO GORDO 16-03-17-05 Clear Lake Wildlife Unit - Union Hills WPA-2017-08-17   Bid Completion detail
DICKINSON 15-01-30-06 Other - E. Okoboji Beach DMA Shoreline-2017-08-17   Bid Completion detail
EMMET 17-01-32-01 12 Mile Lake - 12 Mile Lake Boat Ramp & Parking Area-2017-08-17   Bid Completion detail
LOUISA 17-06-58-01 Odessa Wildlife Unit - Boat Ramp Replacement-2017-08-17   Bid Completion detail




BOONE -- PROJECT # 16-02-08-04                7/20/2017                Large Project Letting
LEDGES STATE PARK
RIVER ACCESS/PARKING, DSM RIVER
Proposal Guarantee: $10,000
Completion Date: 5/30/2018

   THIS PROJECT CONSISTS OF INSTALLING A PORTLAND CEMENT CONCRETE BOAT RAMP, RIGGING LANE AND PARKING AREA AT LEDGES STATE PARK IN BOONE COUNTY, IOWA AND INCLUDES GRADING, INSTALLATION OF CULVERT, CONCRETE ACCESS ROAD WITH PARKING AREA AND BOAT RAMP ONTO THE DES MOINES RIVER (3,088 SY OF PCC PAVEMENT).

ESTIMATED QUANTITIES:
    CLEARING AND GRUBBING     1 L.S.
    GRADING     1 L.S.
    FULL DEPTH SAW CUT     75 L.F.
    12-INCH RCP CLASS III     40 L.F.
    12-INCH RCP CLASS III FES W/APRON GUARDS     2 Each
    SUBGRADE PREPARATION     3,370 S.Y.
    GRANULAR SUBBASE     1,010 Tons
    6-INCH NON-REINFORCED PCC PAVEMENT     1,960 S.Y.
    6-INCH REINFORCED PCC PAVEMENT     1,128 S.Y.
    6-INCH STANDARD PCC CURB     20 L.F.
    CLASS 'D' RIPRAP     605 Tons
    MACADAM STONE     22 Tons
    CLASS 'A' CRUSHED STONE     38 Tons
    GROOVED REINFORCED PCC BOAT RAMP     106.7 S.Y.
    8-INCH FILTER SOCK     135 L.F.
    PARKING SPACE STRIPING, HANDICAP MARKINGS & HC SIGN     1 L.S.
    SEEDING, FERTILIZING AND MULCHING     1 L.S.
    NPDES GENERAL PERMIT #2 & SWPPP     1 L.S.
    CONSTRUCTION SURVEY STAKING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CLAYTON -- PROJECT # 17-03-22-02                7/20/2017                Large Project Letting
BIG SPRING HATCHERY
REPLACE MAIN WATER INLET PIPE
Proposal Guarantee: $7,000
Completion Date: 11/30/2017

   The existing CMP pipe will be dug out and replaced with 30 inch dia. smooth PVC pipe. All of the canal gates in the raceways will be replaced with new gates. The water control structure will be retrofitted with new slide gates to improve flexibility.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    30 INCH DIA. C 905-DR 26 PVC PIPE     700 L.F.
    24 INCH DIA. C 905-DR 26 PVC PIPE     163 L.F.
    8 INCH DIA. C 900-DR 26 PVC CONNECTION PIPE     240 L.F.
    30 INCH C-20 WATERMAN CANAL GATE WITH STAINLESS STEEL GUIDE RAILS & STEM     3 Each
    24 INCH C-20 WATERMAN CANAL GATE WITH STAINLESS STEEL GUIDE RAILS & STEM     1 Each
    8 INCH C-20 WATERMAN CANAL GATE WITH STAINLESS STEEL GUIDE RAILS & STEM     24 Each
    CONNECTING 30 INCH PIPE TO SPRING HEADWALL     1 L.S.
    CONNECTING 30 INCH PIPE TO MANHOLE     4 Each
    CONNECTING 24 INCH PIPE TO MANHOLE     1 Each
    CONNECTING 8 INCH PIPE TO RACEWAYS     24 Each
    FULL DEPTH SAW CUT     650 L.F.
    PAVEMENT REMOVAL     510 S.Y.
    6 INCH OF CLASS "A" CRUSHED STONE     164 Tons
    2 WEEK OF PUMP RENTAL & OPERATIONAL COST     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DES MOINES -- PROJECT # 17-06-29-01                7/20/2017                Large Project Letting
ODESSA WILDLIFE UNIT
CHEMICAL STORAGE SHED
Proposal Guarantee: $1,500
Completion Date: 12/31/2017

   Odessa WMA receives a 275 gallon donation of glyphosate (Roundup). This large donation is delivered in a container called a "tote" which is large and needs a proper storage containment building. This new storage building will have a 500 gallon containment vault beneath the floor in the event that the tote leaks. The building will have an overhead door, walk-through door and lighting. This building will be heated and be constructed of structural insulated panels.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    ELECTRICAL & LIGHTING     1 L.S.
    FINISHES, ROOFING, DOORS & HARDWARE     1 L.S.
    ATTIC SPRAY FOAM INSULATION     1 L.S.
    UNDERGROUND WELL TANK     1 Each
    CONCRETE FLATWORK AND FOOTINGS     1 L.S.
    ELECTRIC HEATER     1 Each
    MOBILIZATION     1 L.S.
    GRADING AND RESTORATION     1 L.S.
Alternate
    2X6 STUD WALL WITH SPRAY FOAM INSULATION     1 L.S.
Alternate
    STRUCTURAL INSULATED PANEL WALL     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JONES -- PROJECT # 16-06-53-03                7/20/2017                Large Project Letting
CENTRAL PARK LAKE
BOAT RAMP, FISHING ACCESS, AND BEACH CONSTRUCTION
Proposal Guarantee: $40,000
Completion Date: 9/30/2018

   This project consists of removing and replacing the boat ramp parking lot, renovating the beach area, constructing a new fishing access parking lot, and constructing a steel fishing pier.

ESTIMATED QUANTITIES:
    1" Curb Stop     1 Each
    18" Dual Wall HDPE     40 L.F.
    24" CMP     206 L.F.
    24" CMP Apron     3 Each
    36" CMP     140 L.F.
    36" CMP Apron     2 Each
    5" PCC     521 S.Y.
    6' Tree     4 Each
    6" PCC     2,564 S.Y.
    6" PCC Curb     201 L.F.
    6" Perf. Tile     446 L.F.
    Beach Sand     3,360 Tons
    Bench, Backless     1 Each
    Bench, Standard     2 Each
    Bioswale     1 Each
    Class 10 Excavation     4,608 C.Y.
    Control Structure     1 Each
    Drain Down Pit     1 Each
    Drinking Fountain     1 Each
    Electrical, Boat Ramp     1 L.S.
    Electrical, Fishing Access     1 L.S.
    Fishing Bumpout     4 Each
    Fishing Pier     1 L.S.
    Granular Shoulders     101 Tons
    Grill     1 Each
    Handicap Sign     3 Each
    HMA Patch     220 Tons
    Inline Drain     4 Each
    Jug Filler     1 Each
    Kiosk, Install Only     1 Each
    Light, Install And Foundation Only     1 Each
    Light, Complete     3 Each
    Mobilization     1 L.S.
    Mulch Sock     1,299 L.F.
    Native Grass     0.22 Acres
    Pavement Removal     1,967 S.Y.
    Pavement Sawcut     65 L.F.
    Pavement Striping     1,273 L.F.
    Retaining Wall     90 L.F.
    Seeding, Fertilizing, Mulching     1.5 Acres
    Shelter, Complete     2 Each
    Special Backfill     2,403 Tons
    Stairs, 5-step     3 Each
    Stairs, 6-step     1 Each
    Stairs, Fishing Access     1 Each
    Structural Concrete (Boat Ramp)     172 S.Y.
    Subdrain Outlet     2 Each
    SW-501 Manhole     1 Each
    SW-603 Intake     1 Each
    Tree Clearing, As Necessary     1 L.S.
    Trench Drain     34 L.F.
    Construction Staking     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




STORY -- PROJECT # 16-02-85-02                7/20/2017                Large Project Letting
HICKORY GROVE LAKE
IN-LAKE AND WATERSHED IMPROVEMENT
Proposal Guarantee: $5,000
Completion Date: 3/30/2018

   This Project consist of constructing a series of Revetment Rock Silt Dikes, 746 Linear Feet of Bank Stabilization (armoring) 737 Linear Feet of Trail and Drainage Tile repairs

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Class `E' Revetment     1,300 Tons
    Macadam Stone     160 Tons
    Engineering Fabric     2,311 S.Y.
    Class `A' Crushed Stone     163 Tons
    3/8 Inch Minus Granular Surfacing     127 Tons
    Dike Repair     1 L.S.
    Intake Structure Complete     2 Each
    12" Dual Wall PE Tubing     80 L.F.
    6" Corr. Non Perf PE Tubing     200 L.F.
    36" Dia CMP 16GA     12 L.F.
    Seeding,Fertilizing & Mulch     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




STORY -- PROJECT # 17-02-85-03                7/20/2017                Large Project Letting
STATE FOREST NURSERY
STORAGE BUILDING
Proposal Guarantee: $10,000
Completion Date: 12/31/2017

   This project consists of a new storage facility for the State Forest Nursery which will provide storage for the large equipment forestry uses at this location. The proposed storage building will have two (2) 12'-0" and one (1) 20'-0" overhead doors, LED lighting and electrical power. Contractor shall rework entire site electrical, remove existing power pole and meters, run new electrical down to pad mounted transformer and then to a distribution panel and out to the buildings at the complex.

ESTIMATED QUANTITIES:
    GRADING     1 L.S.
    SEEDING, FERTILIZING AND MULCHING     1 L.S.
    SITE ELECTRICAL (DISTRIBUTION PANEL, METERS & SERVICE LINES)     1 L.S.
    STORAGE BUILDING (ALL COMPONENTS)     1 L.S.
    RESTROOM REMODEL     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




STORY -- PROJECT # 18-02-85-01                7/27/2017                Small Project Letting
STATE FOREST NURSERY
TILING OF NURSERY BEDS
Proposal Guarantee: $0
Completion Date: 8/18/2017

   This project entails the installation of approximately 8,000' of 4" drain tile (perforated), 500' of 6" drain tile (perforated or solid as needed) and approx. 20 new junctions connecting the 4" to 6" tile all at the State Forest Nursery in Ames, IA.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




VAN BUREN -- PROJECT # 15-06-89-05                7/28/2017                Small Project Letting
LAKE SUGEMA WILDLIFE MANAGEMENT AREA
TUG FORKS BOAT RAMP REPLACEMENT (TSB CONTRACT)
Proposal Guarantee: $0
Completion Date: 10/20/2017

   This project is to replace approximately 34 SY of PCC boat ramp at Tug Forks within the Lake Sugema Wildlife Management Area, Van Buren County, Iowa.

Contact:
Michael Dufoe

Michael.dufoe@dnr.iowa.gov




APPANOOSE -- PROJECT # 17-05-04-10                8/3/2017                Small Project Letting
HONEY CREEK RESORT
DOCK BUMPERS - VERTICAL
Proposal Guarantee: $0
Completion Date: 11/22/2017

   This project consists of adding vertical vinyl bumper pieces to the dock system at Honey Creek Resort. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




ADAIR -- PROJECT # 17-04-01-01                8/10/2017                Small Project Letting
OTHER
MEADOW LAKE JETTY REPAIR
Proposal Guarantee: $0
Completion Date: 10/27/2017

   Repair Fishing Jetties - Meadow Lake, Adair County, Iowa. Contractor to clear all trees and brush form the fishing jetties then purchase and install Class "E" riprap on the sides of the two jetties and Class "A" crushed stone surfacing on the top of both jetties. West Jetty: -180 tons Class "E" Riprap -45 tons Class "A" Surfacing East Jetty: -180 tons Class "E" Riprap -30 tons Class "A" Surfacing *Clearing and Grubbing required on both jetties

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




APPANOOSE -- PROJECT # 18-05-04-03                8/10/2017                Small Project Letting
SEDAN BOTTOMS
DRAKE AREA, STOPLOG STRUCTURE
Proposal Guarantee: $0
Completion Date: 10/31/2017

   This project consists of installing a stoplog structure (Wisconsin tube). Project is at the Drake area of Sedan Bottoms Wildlife Management Area. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




HARRISON -- PROJECT # 17-04-43-01                8/10/2017                Small Project Letting
LOESS HILLS STATE FOREST
TUFF SHED CABINS
Proposal Guarantee: $0
Completion Date: 9/29/2017

   Loess Hills State Forest - Tuff Shed Cabins, Harrison County, Iowa. Contractor to purchase and install two (2) new Tuff Shed Pro Ranch Weekender (10x16) cabins on existing gravel pads prepared by Forestry staff. Each Tuff Shed Pro Ranch Weekender (10x16) shall have the following items provided by Tuff Shed: -Paint entire interior and exterior -3'-0" 6 panel steel entry door -3'-0"x3'-0" insulated vinyl windows -Insulation in all walls, ceiling and floor -7/16" interior sheating walls and ceiling -10'-0"x4'-0" end wall porch overhang with pressure treated deck and posts -one generator provided by Tuff Shed for construction

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




WASHINGTON -- PROJECT # 18-06-92-01                8/10/2017                Small Project Letting
LAKE DARLING STATE PARK
PEDESTRIAN BRIDGE ABUTMENTS AND APPROACHES
Proposal Guarantee:
Completion Date: 10/12/2017

   This project will construct cast-in-place PCC bridge abutments, install a pre-fabricated pedestrian bridge (140' long by 10' wide by other), build granular approaches and place Class E revetment at the silt dam within Lake Darling State Park.

Contact:
Michael Dufoe

Michael.dufoe@dnr.iowa.gov




CERRO GORDO -- PROJECT # 16-03-17-05                8/17/2017                Small Project Letting
CLEAR LAKE WILDLIFE UNIT
UNION HILLS WPA
Proposal Guarantee: $0
Completion Date: 11/17/2017

   The project consists of constructing two earthen dikes (425 CY), furnishing and installing two concrete water control structures, installing 10" dia. PE tile (1280 LF), and seeding disturbed areas on the Union Hills WMA, Cerro Gordo Co. Iowa. Proposal & Plan may be obtained by emailing name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




DICKINSON -- PROJECT # 15-01-30-06                8/17/2017                Small Project Letting
OTHER
E. OKOBOJI BEACH DMA SHORELINE
Proposal Guarantee: $0
Completion Date: 5/25/2018

   This project is designed to repair and slow the rate of erosion along a 650' stretch of East Okoboji Lake shoreline in an area commonly known as "East Okoboji Beach" in Dickinson County, Iowa. Work includes installation of 100% natural coir logs along the cut bank areas followed by grading and backfill to re-establish the natural shoreline and backslope grading. Following grading, a 25' buffer of short grass prairie will be seeded and mulched to act as a buffer and natural erosion deterrent. Also included in the contract is establishment of erosion stone dock approaches to aid in the installation and removal of the local docks while preventing erosion

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




EMMET -- PROJECT # 17-01-32-01                8/17/2017                Small Project Letting
12 MILE LAKE
12 MILE LAKE BOAT RAMP & PARKING AREA
Proposal Guarantee: $0
Completion Date: 11/30/2017

   This project is designed to construct a rock surface access, boat ramp, and parking area for 12 Mile Lake in Emmet County. Work includes clearing/grubbing/tree removal, earthwork, rock surfacing (Macadam & Class "A" material), and a small amount of culvert/pipe work.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




LOUISA -- PROJECT # 17-06-58-01                8/17/2017                Small Project Letting
ODESSA WILDLIFE UNIT
BOAT RAMP REPLACEMENT
Proposal Guarantee: $0
Completion Date: 10/27/2017

   Project includes removing and disposing of an existing 45'x10' PCC boat ramp and replacing it with a 45' x 12' reinforced PCC boat ramp on a granular subbase. Includes minor grading and placement of road stone in parking lot.

Contact:
Michael Dufoe

Michael.dufoe@dnr.iowa.gov