PROJECTS LETTING -  July , 2022

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

BLACK HAWK 22-03-07-02 George Wyth State Park - Cedar Valley Trail 1.3 miles Reconstruction-2022-07-19   Bid Completion detail
SHELBY 21-04-83-01 Prairie Rose State Park - Spoil Site Decommissioning-2022-07-21   Bid Completion detail
UNION 22-04-88-06 Green Valley State Park - Campground Fishing Pier-2022-07-21   Bid Completion detail
WARREN 21-05-91-02 Lake Ahquabi - Road Reconstruction Project-2022-07-21   Bid Completion detail
WARREN 21-05-91-01 Lake Ahquabi State Park - Office Addition-2022-07-21   Bid Completion detail
WASHINGTON 22-06-92-01 Lake Darling State Park - 2022 PCC Trail-2022-07-21   Bid Completion detail
DELAWARE 22-03-28-03 Backbone State Park - Building Foundation & Floor Rebid-2022-07-28   Bid Completion detail
WOODBURY 21-01-97-01 Brown's Lake WMA - Brown's Lake Access Road Maintenance-2022-07-28   Bid Completion detail
LYON 22-01-60-01 Big Sioux River WMA - Access Road Maintenance-2022-08-11   Bid Completion detail
ALLAMAKEE 21-03-03-02 Heytman's Landing - Maintenance Channel Dredging-2022-08-18   Bid Completion detail
APPANOOSE 22-05-04-05 Rathbun WMA - Road Maintenance-2022-08-18   Bid Completion detail
DICKINSON 23-01-30-02 Trickle Slough WMA - Dike Construction-2022-08-18   Bid Completion detail
LOUISA 21-06-58-03 Odessa WMA - Access Road Maintenance-2022-08-18   Bid Completion detail
MONONA 21-01-67-01 Lewis and Clark State Park - Visitor Center Repairs-2022-08-18   Bid Completion detail
PALO ALTO 18-01-74-02 Virgin Lake - Rock Fish Barrier & Parking Lot-2022-08-18   Bid Completion detail




BLACK HAWK -- PROJECT # 22-03-07-02                7/19/2022                Large Project Letting
GEORGE WYTH STATE PARK
CEDAR VALLEY TRAIL 1.3 MILES RECONSTRUCTION
Proposal Guarantee: $37,500
Completion Date: 9/15/2023

   Reconstruct approximately 1.3 miles of multi-use trail.

ESTIMATED QUANTITIES:
    Special Backfill     2,718 Tons
    Excavation, Class 10 Waste     1,939 C.Y.
    Aprons, Metal, 18 In. Dia.     2 Each
    Culvert, Corrugated Metal Entrance Pipe 18" Dia.     37 L.F.
    Removal of Recreational Trail     6,276 S.Y.
    Recreational Trail, Portland Cement Concrete, 5 In.     7,845 S.Y.
    Construction Survey     1 L.S.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.
    Perimeter and Slope Sediment Control Device, 9 In. Dia.     14,120 L.F.
    Mobilizations, Erosion Control     2 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SHELBY -- PROJECT # 21-04-83-01                7/21/2022                Large Project Letting
PRAIRIE ROSE STATE PARK
SPOIL SITE DECOMMISSIONING
Proposal Guarantee: $25,000
Completion Date: 5/31/2023

   This project consists of decommissioning a dredge spoil site by removing the perimeter fence, excavation of material from the basin and dike to create a 5:1 slope on the east side of the site, seeding all disturbed areas, and incidental work as directed by DNR Field Engineer.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Fence Removal     3,288 L.F.
    Excavation, Class 10 Borrow     58,823 C.Y.
    Outlet Riser Modification     1 L.S.
    Reclaim Revetment, Class D     977 C.Y.
    Site Restoration     12 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




UNION -- PROJECT # 22-04-88-06                7/21/2022                Large Project Letting
GREEN VALLEY STATE PARK
CAMPGROUND FISHING PIER
Proposal Guarantee: $12,500
Completion Date: 4/30/2023

   This project consists of constructing an ADA accessible fishing pier near the campground at Green Valley State Park.

ESTIMATED QUANTITIES:
    Demolition     1 L.S.
    Fishing Pier, Boardwalk, Abutment Complete     1 L.S.
    Site Restoration     1 L.S.
    Sidewalk, 6" PCC     52 S.Y.
    Parking Lot Pavement, 7" PCC     36 S.Y.
    Modified Subbase     107 S.Y.
    Signing     1 Each
    Precast Concrete Parking Wheel Stops     1 Each
    Painted Pavement Mark, High-Build Waterborne     1 L.S.
    Detectable Warning Panel     20 S.F.
    Filter Sock, 8"     100 L.F.
    Revetment, Class E     568 Tons
    Traffic Control     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WARREN -- PROJECT # 21-05-91-02                7/21/2022                Large Project Letting
LAKE AHQUABI
ROAD RECONSTRUCTION PROJECT
Proposal Guarantee: $150,000
Completion Date: 5/30/2023

   This project consists of removal of the existing asphalt roads and removal of trees and vegetation that are in conflict within the work zone, grading the project site, installing new portland cement concrete roads and parking areas for the existing boat ramp and beach areas, storm sewer and intakes, pedestrian walkway connection and seeding and mulching all disturbed areas located at Lake Ahquabi State Park in Warren County, Iowa.

ESTIMATED QUANTITIES:
    Demolition     1 L.S.
    Clearing and Grubbing     1 L.S.
    Tree Clearing     1 L.S.
    Full Depth Saw Cut     89 L.F.
    HMA Pavement Removal     23,046 S.Y.
    PCC Removal     214 S.Y.
    Grading     1 L.S.
    12-inch Filter Sock     2,225 L.F.
    Type SW-401 Circular Storm MH W/SW-602 Type E Casting     1 Each
    Type SW-503 Single Grate Intake W/MH & SW-603 Type 'R & E' Castings     1 Each
    Type SW-506 Double Grate Intake W/MH & SW-603 Type 'R & E' Castings     4 Each
    Type SW-512 Circular Area Intake W/SW-604 Type 3A Casting     1 Each
    Type SW-512 Circular Area Intake W/SW-604 Type 3B Casting     1 Each
    Type SW-512 Circular Area Intake W/SW-604 Type 5 Casting     1 Each
    Type SW-513 Open Sided Area Intake W/SW-602 Type G Casting     4 Each
    6-inch Slotted PVC Subdrain     323 L.F.
    Subdrain Cleanout Type A-2     6 Each
    12-inch RCP Class III     436 L.F.
    15-inch RCP Class III     185 L.F.
    18-inch RCP Class III     122 L.F.
    24-inch RCP Class III     344 L.F.
    30-inch RCP Class III     91 L.F.
    36-inch RCP Class III     339 L.F.
    12-inch RCP Class III FES     7 Each
    18-inch RCP Class III FES W/Footing & Apron Guard     2 Each
    24-inch RCP Class III FES W/Footing & Apron Guard     2 Each
    36-inch RCP Class III FES W/Footing & Apron Guard     7 Each
    Flexstorm #62LCBFX Inlet Filter (Or Approved Equal)     18 Each
    Flexstorm #62MRDFX Inlet Filter (Or Approved Equal)     4 Each
    Flexstorm #62LRDFX Inlet Filter (Or Approved Equal)     2 Each
    3/8" Minus Pea Gravel     40 Tons
    Class 'D' Riprap     125 Tons
    Special Backfill/Granular Base     8,718 Tons
    6-inch Non-Reinforced PCC     4,930 S.Y.
    7-inch Non-Reinforced PCC     22,002 S.Y.
    6-Inch Standard Curb and 2-Inch Drop Curb     701 L.F.
    Granular Base-Sidewalks     53.1 Tons
    5-inch Non-Reinforced PCC Sidewalks     262.6 S.Y.
    Class 'A' Crushed Stone     25 Tons
    Traffic Control     1 L.S.
    Seeding, Fertilizing and Mulching     3.5 Acres
    Street Signage     1 L.S.
    Handicap Parking Signage     1 L.S.
    Street Pavement Markings     1 L.S.
    Parking Space Pavement Striping, Handicap Parking Cross Hatch Markings     1 L.S.
    6' Concrete Parking Wheel Stops     4 Each
    Concrete Bollards     2 Each
    Construction Survey Staking and As-Built Survey     1 Each
    NPDES General Permit #2 & SWPPP     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WARREN -- PROJECT # 21-05-91-01                7/21/2022                Large Project Letting
LAKE AHQUABI STATE PARK
OFFICE ADDITION
Proposal Guarantee: $37,500
Completion Date: 5/31/2023

   Lake Ahquabi State Park is undergoing an extensive renovation of the entire Park and this project will install an office addition to the existing cold storage building in the office complex. This project will connect the existing building to the addition and re-side the entire storage building to make it look like the new office addition and follow the State Parks Design Guide. The project will also demolish the existing CCC office and house on site in a phased process.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Phase 1 Demolition (Office & Site Work)     1 L.S.
    Phase 2 Demolition (Park House)     1 L.S.
    Storage Building Finishes     1 L.S.
    Office Addition and all Associated Items     1 L.S.
    Site Electrical Service     1 L.S.
    1" Water Service Line     1 L.S.
    6" SDR 23.5 Sanitary Sewer Pipe     145 L.F.
    Sanitary Cleanouts     3 Each
    Concrete Parking and Sidewalks     130 S.Y.
    Parking Wheel Stops and ADA Accessories     1 L.S.
    Class "A" Rock     100 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WASHINGTON -- PROJECT # 22-06-92-01                7/21/2022                Large Project Letting
LAKE DARLING STATE PARK
2022 PCC TRAIL
Proposal Guarantee: $0
Completion Date: 5/26/2023

   No website comments. Trail bid by Friends Group.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clearing and Grubbing     1 L.S.
    Unclassified Fill (Borrow)     360 C.Y.
    Filter Sock     1,000 L.F.
    Culvert, 18" RCP     54 L.F.
    Flared End Section, 18" RCP     4 Each
    Storm Sewer, 12" ADS     24 L.F.
    Nyloplast Intake, 12" with Beehive     1 Each
    Granular Subbase     500 Tons
    PCC Trail, 5" Depth Reinforced     1,754 S.Y.
    Parking Lot Pavement, 6" Depth     300 S.Y.
    Truncated Domes     20 S.F.
    Parking Lot Striping     1 L.S.
    Bumper Blocks (Concrete Pre-Cast)     8 Each
    A.D.A. Signs with Metal Posts     2 Each
    Topsoil, Remove, Store and Respread     300 C.Y.
    Seeding and Fertilizing     0.5 Acres

See Plans & Specs for Notice to Bidders

Drawings and Specs are not available in electronic format for this project

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




ALLAMAKEE -- PROJECT # 21-03-03-02                8/18/2022                Large Project Letting
HEYTMAN'S LANDING
MAINTENANCE CHANNEL DREDGING
Proposal Guarantee: $6,250
Completion Date: 8/31/2023

   This project consists of maintenance dredging of Heytman's Landing boater access channel from the boat ramp into the Mississippi river and incidental work as directed by DNR Field Engineer.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Sediment Removal and Dewater     1,500 C.Y.
    Sediment Disposal     1,500 C.Y.
    Stump-Rootball Removal     2 Each
    Railroad Requirements     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 22-05-04-05                8/18/2022                Large Project Letting
RATHBUN WMA
ROAD MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 12/31/2022

   This project consists of granular roadway maintenance - small tree/brush clearing, ditch cleaning/shaping, blading/shaping, spreading new aggregate, placing revetment/erosion stone, the replacement of 2 culverts and seeding/fertilizing.

ESTIMATED QUANTITIES:
    2101 - CLEARING     3.7 Acres
    2125 - DITCH CLEANING/RESHAPING     29.5 STA.
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING     57.6 STA.
    2312 - GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE     1,216 Tons
    2312 - GRANULAR SURFACING ON ROAD, CRUSHED STONE - 2-INCH     125 Tons
    2416 - APRON, CONC, 18"     4 Each
    2416 - CULV, CONC RDWY PIPE, 18"     32 L.F.
    2507 - ENGINEERING FABRIC     250 S.Y.
    2507 - REVETMENT, CLASS E     80 Tons
    2507 - EROSION STONE     64 Tons
    2518 - SAFETY CLOSURE     4 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.
    2601 - SEED+FERTILIZE (RURAL)     1 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LOUISA -- PROJECT # 21-06-58-03                8/18/2022                Large Project Letting
ODESSA WMA
ACCESS ROAD MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 10/31/2023

   This projects consists of granular roadway maintenance - blading/shaping, spreading new rock and the replacement of 5 culverts; 24-inch, 30-inch and 36-inch. All new culverts are RCP. Completion date is October 31st, 2023. There is currently a project in place to repair the Odessa levees which will have significant truck traffic. The Contractor shall not start work until after the levee work is completed, anticipated to be September 30, 2022. No work may occur between October 28, 2022 and March 14, 2023 due to hunting seasons. Due to fluctuating river and lake levees there may be sitting water in culverts. These are typically dry from August to October. If the contractor chooses to replace the culverts during high water levels, de-watering shall be required and incidental to the culvert installation.

ESTIMATED QUANTITIES:
    2101 - CLEARING     1 L.S.
    2102 - SPECIAL BACKFILL     128 Tons
    2125 - RESHAPING DITCHES     23 STA.
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING     95.4 STA.
    2312 - GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE     2,225 Tons
    2416 - APRON, CONC, 24"     2 Each
    2416 - APRON, CONC, 30"     4 Each
    2416 - APRON, CONC, 36"     4 Each
    2416 - CULV, CONC RDWY PIPE, 24"     32 L.F.
    2416 - CULV, CONC RDWY PIPE, 30"     64 L.F.
    2416 - CULV, CONC RDWY PIPE, 36"     48 L.F.
    2507 - ENGINEERING FABRIC     450 S.Y.
    2507 - REVETMENT, CLASS E     15 Tons
    2507 - EROSION STONE     100 Tons
    2518 - SAFETY CLOSURE     1 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MONONA -- PROJECT # 21-01-67-01                8/18/2022                Large Project Letting
LEWIS AND CLARK STATE PARK
VISITOR CENTER REPAIRS
Proposal Guarantee: $6,250
Completion Date: 12/30/2022

   Lewis and Clark State Park has a Visitor Center built in 2009 and the half-log siding is in poor condition and many areas were not properly flashed or installed correctly. This project will replace all of the siding and repair many of the concrete areas around the building as well as replace stone, a window, and other minor repairs.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Demolition and Cleaning     1 L.S.
    Glass Replacement     1 Each
    Window Tinting     1 L.S.
    Retaining Wall Stain and Sealer     450 S.F.
    Building Wrap, Flashing, and Siding     1 L.S.
    Stone Repair, Painting, and Caulking     1 L.S.
    Concrete Stoops (8x24) and Dowels     1 L.S.
    Concrete Sidewalks with Dowels     27 S.Y.
    Sheathing Replacement     320 S.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DELAWARE -- PROJECT # 22-03-28-03                7/28/2022                Small Project Letting
BACKBONE STATE PARK
BUILDING FOUNDATION & FLOOR REBID
Proposal Guarantee: $0
Completion Date: 9/30/2022

   Contractor furnish and place crushed stone base, construct insulated foundation, and install infloor heating system as per plan.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




WOODBURY -- PROJECT # 21-01-97-01                7/28/2022                Small Project Letting
BROWN'S LAKE WMA
BROWN'S LAKE ACCESS ROAD MAINTENANCE
Proposal Guarantee: $0
Completion Date: 10/31/2022

   This project is designed to repair surface drainage issues and add granular surfacing to a section of roadway at the Brown's Lake Wildlife Management Area (WMA). Work under this project includes blading and shaping of the existing granular roadways to establish positive drainage and then installation of Class "A" stone surfacing.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




LYON -- PROJECT # 22-01-60-01                8/11/2022                Small Project Letting
BIG SIOUX RIVER WMA
ACCESS ROAD MAINTENANCE
Proposal Guarantee: $0
Completion Date: 11/11/2022

   This project is designed to repair surface drainage issues and add granular surfacing to a section of roadway at the Big Sioux River Wildlife Management Area (WMA) in Lyon, County. Work under this project includes blading and shaping of the existing granular roadway to establish positive drainage, ditch cleaning/shaping, installation of Class "A" stone surfacing, and disturbed area seeding. Engineers estimate is $18,000.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




DICKINSON -- PROJECT # 23-01-30-02                8/18/2022                Small Project Letting
TRICKLE SLOUGH WMA
DIKE CONSTRUCTION
Proposal Guarantee: $0
Completion Date: 11/25/2022

   This project is designed to restore a wetland area located within the Trickle Slough WMA in Dickinson County, Iowa. Work under this project includes embankment (dike construction), excavation (tile outlet), tile investigation, tile breaks, tile installation, and a water control structure with associated piping. The engineers estimate for this project is $50,000

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




PALO ALTO -- PROJECT # 18-01-74-02                8/18/2022                Small Project Letting
VIRGIN LAKE
ROCK FISH BARRIER & PARKING LOT
Proposal Guarantee: $0
Completion Date: 11/25/2022

   This project is designed to add rock fish barrier protection to a drainage and construct a granular parking lot for the boat ramp on the east side of Virgin Lake, Palo Alto County, IA. Work under this project includes the supply/installation of fieldstone rip rap, earthen grading, granular surface supply/installation, a CMP culvert, erosion control, and seeding.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov