PROJECTS LETTING -  July , 2015

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

ALLAMAKEE 15-03-03-08 Guttenburg (pools 9-11) Fisheries Management Unit - Noble's Isand Restroom Replacement-2015-07-09   Bid Completion detail
CHICKASAW 15-03-19-01 Geerts WMA - Wetland Restoration-2015-07-09   Bid Completion detail
STORY 16-02-85-01 State Forest Nursery - Tiling of Nursery Beds-2015-07-09   Bid Completion detail
WASHINGTON 16-06-92-02 Lake Darling State Park - Sanitary Sewer Plug Repair-2015-07-10   Bid Completion detail
CLAY 15-01-21-01 Little Sioux Wildlife Area - Repair Low Water Crossing-2015-07-16   Bid Completion detail
DAVIS 15-05-26-01 Lake Wapello - campground electric upgrade-2015-07-23   Bid Completion detail
GUTHRIE 15-04-39-02 Springbrook - Bridge, Road & Culvert Project-2015-07-23   Bid Completion detail
HARDIN 15-02-42-03 Pine Lake - Storage Building-2015-07-23   Bid Completion detail
MAHASKA 13-05-62-02 Hawthorn WMA - Sediment Ponds-2015-07-23   Bid Completion detail
SAC 13-01-81-05 Black Hawk Lake State Park - Dredge Containment Site-2015-07-23   Bid Completion detail
TAMA 14-05-86-01 Union Grove State Park - Dredge Containment Site-2015-07-23   Bid Completion detail
VAN BUREN 14-06-89-02 Sugema Wildlife Unit - FEMA Repair Fox River WMA-2015-07-23   Bid Completion detail
WAYNE 15-05-93-02 Bobwhite State Park - Crack Seal-2015-07-30   Bid Completion detail




WASHINGTON -- PROJECT # 16-06-92-02                7/10/2015                Large Project Letting
LAKE DARLING STATE PARK
SANITARY SEWER PLUG REPAIR
Proposal Guarantee: $0
Completion Date: 7/19/2015

   This project is an emergency repair to fix a plugged sanitary sewer line. Work includes removal of an 8"x8"x8" sanitary sewer ductile iron tee with an approximate 6' deep manhole and pour a standard PCC fillet. Removal of the top of an 8"x8"x8" ductile iron tee within an approximate 14' deep manhole (by confined entry). Includes all necessary traffic control and confined entry requirements. The State will provide all necessary jetting, videoing, and pumping of sanitary sewer by a separate contractor.

ESTIMATED QUANTITIES:
    Sanitary Sewer Repair     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DAVIS -- PROJECT # 15-05-26-01                7/23/2015                Large Project Letting
LAKE WAPELLO
CAMPGROUND ELECTRIC UPGRADE
Proposal Guarantee: $20,000
Completion Date: 5/21/2016

   This project consists of the removal of the existing campground camp pads and electrical, and installing new gravel camp pads, electrical services, water services, sanitary sewer services, and seeding/fertilizing/mulching all disturbed areas located at Lake Wapello State Park in Davis County, Iowa, site restoration and incidental items as required by the project documents and the IDNR construction inspector.

ESTIMATED QUANTITIES:
    Clearing and Grubbing      1 L.S.
    Demolition     1 L.S.
    Full Depth Saw Cut     324 L.F.
    HMA/Pavement Removal     380 S.Y.
    Grading     1 L.S.
    8" Filter Sock     579 L.F.
    Class ‘D’ Riprap     25 Tons
    Granular Base     59 Tons
    6-inch Non-Reinforced ACC     187 S.Y.
    Type SW-301 48" Diameter Sanitary Manhole W/Type ‘B Casting     3 Each
    Type SW-303 48" Diameter Sanitary Manhole W/Type ‘B Casting     1 Each
    6-inch Sanitary Sewer (PVC SDR 23.5)     645 L.F.
    4-inch Sanitary Sewer Service (PVC SDR 23.5)     428 L.F.
    RV Sanitary Sewer Cleanout Connection     15 Each
    3x3x2 Tapping Tee and Valve     3 Each
    3x3x1 Tapping Tee and Valve     2 Each
    2x2x2 HDPE Tee     13 Each
    1x1x1 HDPE Tee     2 Each
    1 " Service Taps (on Existing 3" PVC Main, Verify)     7 Each
    2x1 HDPE Reducers     16 Each
    Woodford Model S-3 Sanitary Yard Hydrants     27 Each
    2-inch HDPE Pipe     951 L.F.
    1-inch HDPE Pipe     1,421 L.F.
    Disinfection     1 L.S.
    18-inch Arch RCP Class III     84 L.F.
    18-inch Arch RCP Class III FES W/Trash Guard and Footing     6 Each
    Engineering Fabric     6,124 S.Y.
    Macadam Stone     1,493 Tons
    3/8" Minus Crushed Limestone     643 Tons
    Traffic Control     1 L.S.
    Seeding, Fertilizing and Mulching     3 Acres
    Electrical Improvements     1 L.S.
    Sanitary Disposal Station Improvements     1 L.S.
    Construction Survey Staking     1 L.S.
    NPDES General Permit #2 & SWPPP     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




GUTHRIE -- PROJECT # 15-04-39-02                7/23/2015                Large Project Letting
SPRINGBROOK
BRIDGE, ROAD & CULVERT PROJECT
Proposal Guarantee: $30,000
Completion Date: 5/21/2016

   This project contains three site locations of construction. The first site is a roadway overlay project and includes the removal of the existing intakes and culverts, saw cutting and removing part of the existing asphalt park road and the construction of a new storm sewer system, overlaying and extending the existing asphalt roadway for a distance of roughly 1,861 lineal feet, requiring tree clearing, grading, storm sewer construction, pavement construction and seeding/fertilizing/mulching all disturbed areas. The second site is for a bridge replacement and requires the removal of an existing four celled 9'x5' box culvert and the construction of a new structural concrete bridge. The third site consists of culvert replacement and requires the removal of four 15" diameter metal culverts and the installation of a twin 10'x5'x32' reinforced concrete box culvert. All three sites are located at Springbrook State Park in Guthrie County, Iowa.

ESTIMATED QUANTITIES:
    Removal of Existing Structures     1 L.S.
    Clearing and Grubbing     1 L.S.
    Full Depth Saw Cut     3,704 L.F.
    HMA Pavement Removal     1,055 S.Y.
    12-inch RCP Class III     1,204 L.F.
    15-inch RCP Class III     435 L.F.
    18-inch RCP Class III     60 L.F.
    SW-501 Single Grate Intake w/SW-603 Type ‘R’ Casting     10 Each
    SW-512 Circular Area Intake (24" Riser) w/SW-604 Type ‘3B’ Casting     1 Each
    SW-512 Circular Area Intake (18" Riser) w/SW-604 Type ‘3B’ Casting     4 Each
    SW-513 4’X4’ Open Sided Intake w/SW-602 Type ‘G’ Casting     1 Each
    Special Backfill     409 Tons
    Granular Shoulder     126 Tons
    Surface Preparation     3,303 S.Y.
    PCC Pavement Placement     4,539 S.Y.
    Iowa DOT Class ‘C’ Concrete     1,011 C.Y.
    36-inch #4 Epoxy Coated Reinforcing Bar     714 Each
    Finish Grading     1 L.S.
    Seeding, Fertilizing and Mulching     1 L.S.
    8-inch Filter Sock     100 L.F.
    Traffic Control     1 L.S.
    Construction Survey Staking     1 L.S.
    Mobilization     1 L.S.
    Excavation, Class 10, Channel     444 C.Y.
    Removal of Existing Structures     1 L.S.
    Excavation, Class 20     73 C.Y.
    Structural Concrete (Bridge)     152.2 C.Y.
    Reinforcing Steel     102 LB.
    Reinforcing Steel, Epoxy Coated     38,439 LB.
    Reinforcing Steel, Stainless Steel     1,834 LB.
    Concrete Open Railing, TL-4     162 L.F.
    Piles, Steel, HP 10 X 42     790 L.F.
    Concrete Encasement of Steel H-Piles, HP 10X42 (PIOL Type 3)     146.3 L.F.
    Engineering Fabric     399.5 S.Y.
    Revetment, Class ‘E’     361.9 Tons
    Mobilization     1 L.S.
    Clearing and Grubbing     3.3 Units
    Special Backfill     94 Tons
    Embankment-in-Place     62 C.Y.
    Excavation, Class 10, Roadway and Borrow     107 C.Y.
    Excavation, Class 12, Boulders or Rock Fragments     10 C.Y.
    Topsoil, Strip, Salvage and Spread     173 C.Y.
    Granular Shoulders, Type A     63.4 Tons
    Shoulder Construction, Earth     3.7 STA.
    Bridge Approach, Two Lane     267 S.Y.
    Standard or Slip Form Portland Cement Concrete Pavement, Class C, Class 2, Durability, 7 in     249.5 S.Y.
    Removal of Pavement     620 S.Y.
    Safety Closure     3 Each
    Field Laboratory     1 Each
    Remove and Reinstall Sign as Per Plan     4 Each
    Construction Survey     1 L.S.
    Traffic Control     1 L.S.
    Silt Fence     290 L.F.
    Silt Fence for Ditch Checks     120 L.F.
    Removal of Silt Fence or Silt Fence for Ditch Checks     410 L.F.
    Maintenance of Silt Fence or Silt Fence for Ditch Check     40 L.F.
    Floating Silt Curtain (Hanging)     200 L.F.
    Maintenance of Floating Silt Curtain     100 L.F.
    Perimeter and Slope Sediment Control Device, 12 in Dia     200 L.F.
    Perimeter and Slope Sediment Control Device, 20 in Dia     200 L.F.
    Removal of Perimeter and Slope Sediment Control Device     400 L.F.
    Mobilizations, Erosion Control     1 Each
    Mobilizations, Emergency Erosion Control     1 Each
    Excavation, Class 10, Channel     217 C.Y.
    Granular Material for Blanket and Subdrain     59.3 C.Y.
    Subgrade Stabilization Material, Polymer Grid     191.6 S.Y.
    Removal of Existing Structures     1 L.S.
    Excavation, Class 20     489 C.Y.
    Structural Concrete (RCB Culvert)     142 C.Y.
    Reinforcing Steel, Epoxy Coated     19,376 LB.
    Reinforcing Steel, Stainless Steel     1,510 LB.
    Concrete Open Railing, TL-4     74.8 L.F.
    Engineering Fabric     440 S.Y.
    Revetment, Class ‘E’     334.3 Tons
    Mobilization     1 L.S.
    Clearing and Grubbing     4.1 Units
    Special Backfill     26 Tons
    Excavation, Class 10, Roadway and Borrow     277 C.Y.
    Excavation, Class 12, Boulders or Rock Fragments     15 C.Y.
    Topsoil, Strip, Salvage and Spread     102 C.Y.
    Granular Shoulders, Type A     26 Tons
    Shoulder Construction, Earth     2.9 STA.
    Bridge Approach, Two Lane     405.8 S.Y.
    Standard or Slip Form Portland Cement Concrete Pavement, Class C, Class 2, Durability, 7 in     71.4 S.Y.
    Erosion Stone     25 Tons
    Removal of Pavement     424.6 S.Y.
    Safety Closure     3 Each
    Field Laboratory     1 Each
    Remove and Reinstall Sign as Per Plan     1 Each
    Object Marker, Type 3     4 Each
    Construction Survey     1 L.S.
    Traffic Control     1 L.S.
    Silt Fence     260 L.F.
    Silt Fence for Ditch Checks     180 L.F.
    Removal of Silt Fence or Silt Fence for Ditch Checks     440 L.F.
    Maintenance of Silt Fence or Silt Fence for Ditch Check     45 L.F.
    Floating Silt Curtain (Hanging)     200 L.F.
    Maintenance of Floating Silt Curtain     100 L.F.
    Perimeter and Slope Sediment Control Device, 12 in Dia     410 L.F.
    Perimeter and Slope Sediment Control Device, 20 in Dia     200 L.F.
    Removal of Perimeter and Slope Sediment Control Device     610 L.F.
    Mobilizations, Erosion Control     1 Each
    Mobilizations, Emergency Erosion Control     1 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HARDIN -- PROJECT # 15-02-42-03                7/23/2015                Large Project Letting
PINE LAKE
STORAGE BUILDING
Proposal Guarantee: $5,000
Completion Date: 4/29/2016

   Pine Lake State Park currently does not have a storage garage. This storage garage will allow the staff at Pine Lake SP to store their boats and other large equipment in a covered area as well as have a place for staff to work. There will be a 6'-0" storage loft to allow more storage in areas that are otherwise unused. The new proposed storage building will have 12'-0" overhead doors, allowing all equipment to be placed inside, lighting, better access to power and easier access to storage materials

ESTIMATED QUANTITIES:
    CLEARING AND GRUBBING     1 L.S.
    GRADING     1 L.S.
    SEEDING, FERTILIZING AND MULCHING     1 L.S.
    8" FILTER SOCK     230 L.F.
    DRAINING PIPE     1 L.S.
    CLASS "A" CRUSHED STONE     20 Tons
    FENCING RECONSTRUCTION     1 L.S.
    ELECTRICAL     1 L.S.
    NEW STORAGE BUILDING     1 L.S.
    MOBILIZATION     1 L.S.
    CONSTRUCTION STAKING     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MAHASKA -- PROJECT # 13-05-62-02                7/23/2015                Large Project Letting
HAWTHORN WMA
SEDIMENT PONDS
Proposal Guarantee: $20,000
Completion Date: 8/15/2016

   This project consists of constructing three sediment retention ponds and seven dry ponds.

ESTIMATED QUANTITIES:
Main Ponds 
    Mobilization     1 L.S.
    Earthfill - Embankment     58,750 C.Y.
    Earthfill - Core Trence     2,908 C.Y.
    Clearing and Grubbing     25.8 Acres
    Seeding     6.5 Acres
    Fine Drainfill     161 Tons
    Riprap     10 Tons
    21" Trash Rack     1 Each
    48" Trash Rack     1 Each
    66" Trash Rack      1 Each
    21" CMP     109 L.F.
    36" CMP     114 L.F.
    48" CMP     200 L.F.
    48" Riser     1 Each
    66" Riser     1 Each
    72" x 72" Antiseep      3 Each
    96" x 96" Antiseep     2 Each
    Cattle Barrier     100 L.F.
Ferguson BMP 
    Mobilization     1 L.S.
    Earthfill - Embankment     13,622 C.Y.
    Earthfill - Core Trence     3,545 C.Y.
    Clearing and Grubbing     7 Acres
    Seeding     7 Acres
    18" Trash Rack     7 Each
    4" CMP     118 L.F.
    6" CMP     207 L.F.
    8" CMP     193 L.F.
    12" CMP     105 L.F.
    14" CMP     91 L.F.
    18" Riser     6 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SAC -- PROJECT # 13-01-81-05                7/23/2015                Large Project Letting
BLACK HAWK LAKE STATE PARK
DREDGE CONTAINMENT SITE
Proposal Guarantee: $30,000
Completion Date: 3/31/2016

   This project consists of restoring the existing dredge spoil containment site. The water control structure is to be replaced, the embankment is to be repaired, and sediment is to be removed and spread on an upland site.

ESTIMATED QUANTITIES:
 
    Mobilization     1 L.S.
    Clearing and Grubbing     14 Acres
    Earthfill - Embankment     50,216 C.Y.
    Excavation - Waste     242,784 C.Y.
    Topsoiling     4,100 C.Y.
    Fine Drainfill     344 Tons
    48" CMP     160 L.F.
    48" Apron, Metal     1 Each
    Silt Fence     3,450 L.F.
    Seed, Fertilize, Mulch     30 Acres
    Class D Revetment     10 Tons
    Field Fence     8,000 L.F.
    Field Entrance     2 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




TAMA -- PROJECT # 14-05-86-01                7/23/2015                Large Project Letting
UNION GROVE STATE PARK
DREDGE CONTAINMENT SITE
Proposal Guarantee: $10,000
Completion Date: 3/31/2016

   This project consists of restoring the existing dredge spoil containment site. The water control structure will be replaced and two embankments are to be constructed.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clearing and Grubbing     4.1 Acres
    Earthfill - Embankment     35,814 C.Y.
    Earthfill - Core Trench     3,837 C.Y.
    Topsoiling     2,440 C.Y.
    Fine Drainfill     76 Tons
    30" SMP     98 L.F.
    Class D Revetment     12 Tons
    Seeding, Fertilizing, Mulching     8 Acres
    Silt Fence     1,403 L.F.
    Fence Removal     344 L.F.
    Field Fence     2,135 L.F.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




ALLAMAKEE -- PROJECT # 15-03-03-08                7/9/2015                Small Project Letting
GUTTENBURG (POOLS 9-11) FISHERIES MANAGEMENT UNIT
NOBLE'S ISAND RESTROOM REPLACEMENT
Proposal Guarantee: $0
Completion Date: 10/9/2015

   Project consists of removal & disposal of existing pit latrine and associated sidewalk and install a new precast concrete pit vault latrine and new PCC sidewalk at Noble's Island Boat Ramp Area, Allamakee Co., IA. Plans may be requested by emailing melvin.pacovsky@dnr.iowa.gov your company address & phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




CHICKASAW -- PROJECT # 15-03-19-01                7/9/2015                Small Project Letting
GEERTS WMA
WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 10/30/2015

   Project consists of excavation of low areas to enhance wetlands, installation of a small water control structure, and plug existing oxbows, on Geerts WMA, Chickasaw Co.,IA. Plans maybe requested by emailing your company address & phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




STORY -- PROJECT # 16-02-85-01                7/9/2015                Small Project Letting
STATE FOREST NURSERY
TILING OF NURSERY BEDS
Proposal Guarantee: $0
Completion Date: 8/15/2015

   This project entails the installation of approximately 15,000' of 4" drain tile (perforated), 1,000' of 6" drain tile (perforated or solid as needed) and approx. 50 new junctions connecting the 4" to 6" tile all at the State Forest Nursery in Ames, IA.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




CLAY -- PROJECT # 15-01-21-01                7/16/2015                Small Project Letting
LITTLE SIOUX WILDLIFE AREA
REPAIR LOW WATER CROSSING
Proposal Guarantee: $0
Completion Date: 9/4/2015

   This project is designed to repair a low water crossing that was damaged in a flood event. The scope of work involves removing the granular material from the existing crossing and installing new granular material with the proper cross section and gradation. The work is located within the Little Sioux Wildlife Area just north of Gillett Grove, in Clay County, Iowa.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




VAN BUREN -- PROJECT # 14-06-89-02                7/23/2015                Small Project Letting
SUGEMA WILDLIFE UNIT
FEMA REPAIR FOX RIVER WMA
Proposal Guarantee:
Completion Date: 9/30/2015

   Project consists of embankment and spillway erosion repair including placement of compacted earth fill in the flood damaged wetland dike areas of the Fox River area of the Sugema Wildlife Unit, Van Buren County, Iowa.

Contact:
Michael Dufoe

Michael.dufoe@dnr.iowa.gov




WAYNE -- PROJECT # 15-05-93-02                7/30/2015                Small Project Letting
BOBWHITE STATE PARK
CRACK SEAL
Proposal Guarantee: $0
Completion Date: 9/30/2015

   This project consists of cleaning and sealing all cracks in all HMA roadways within Bobwhite State Park.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov