PROJECTS LETTING -  July , 2023

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DICKINSON 23-01-30-05 Spirit Lake Fish Hatchery - ADA Lift and Door-2023-07-20   Bid Completion detail
HARRISON 23-04-43-01 Little Sioux Delta Access - Parking Lot Expansion-2023-07-20   Bid Completion detail
JACKSON 24-06-49-01 Maquoketa Caves State Park - Lagoon Liner Replacement-2023-07-20   Bid Completion detail
JACKSON 24-06-49-01 Maquoketa Caves State Park - Lagoon Liner Replacement-2023-07-20   Bid Completion detail
SCOTT 23-06-82-01 DLS Shooting Range - Range Renovation Phase I-2023-07-20   Bid Completion detail
UNION 19-04-88-02 Three Mile Lake - Restoration Phase 2-2023-07-20   Bid Completion detail
UNION 19-04-88-02 Three Mile Lake - Restoration Phase 2-2023-07-20   Bid Completion detail




HARRISON -- PROJECT # 23-04-43-01                7/20/2023                Large Project Letting
LITTLE SIOUX DELTA ACCESS
PARKING LOT EXPANSION
Proposal Guarantee: $6,250
Completion Date: 3/24/2024

   This project consists of constructing a granular surfaced parking lot and access drive, and the paving of two concrete ADA parking spaces.

ESTIMATED QUANTITIES:
    Grading     1 L.S.
    Macadam     963 Tons
    1" Crushed Road Stone     652 Tons
    CMP, 24"     73 L.F.
    Site Restoration     1 L.S.
    6" PCC, Reinforced     159 S.Y.
    Special Backfill     63 Tons
    Pavement Striping     156 L.F.
    Signs, ADA Parking     2 Each
    Clearing and Grubbing     1 L.S.
    Traffic Control     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




JACKSON -- PROJECT # 24-06-49-01                7/20/2023                Large Project Letting
MAQUOKETA CAVES STATE PARK
LAGOON LINER REPLACEMENT
Proposal Guarantee: $12,500
Completion Date: 4/30/2024

   This project consists of biosolids removal and replacement of the existing synthetic liner with a new liner for both lagoons. The project also includes boundary fence replacement.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Bio Solids Removal     360,000 GAL.
    Removal & Disposal of Old Liner     1 L.S.
    New Liner & Installation     48,000 S.F.
Alternate Bid 
Alternate
    Remove & Replace Existing Fence with 8' High Chain Link Fence     1,300 L.F.
Alternate
    12' Wide Fence Gate     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SCOTT -- PROJECT # 23-06-82-01                7/20/2023                Large Project Letting
DLS SHOOTING RANGE
RANGE RENOVATION PHASE I
Proposal Guarantee: $100,000
Completion Date: 6/14/2024

   The DLS Shooting Range has been around since the 1960s as a private trap and skeet club. This facility was donated to the State a few years ago and upgrades to turn the facility into a pistol and rifle range have been in the plans ever since. This phase I range renovation shall remove all existing, non-functioning buildings on the site and clear the ground of all skeet and trap facilities. The range upgrade will build new backstops, sidewall, shooting structures, and a storage garage. Two existing storage buildings shall remain on site and protected in place as this facility is upgraded.

ESTIMATED QUANTITIES:
 
    Demolition     1 L.S.
    Clearing and Grubbing     1 L.S.
    Grading     1 L.S.
    8" Filter Sock     185 L.F.
    Seeding, Fertilizing and Mulching     5 Acres
    Class A Crushed Stone     1,865.4 Tons
    Type 1, Class A Subdrain with Perforated SDR 35 Pipe     714 L.F.
    12" RCP Class III     351 L.F.
    SW-512 Circular Area Intake w/Type SW-604 Type 4A Casting     7 Each
    Black PVC Coated Chain Link Fencing     1,030 L.F.
    Black PVC Coated Chain Link Fencing 12' Swing Gate     4 Each
    Black PVC Coated Chain Link Fencing 28' Double Swing Gate     1 Each
    6" Reinforced PCC Pavement     91.2 S.Y.
    5" Reinforced PCC Pavement     944.6 S.Y.
    Precast Concrete Parking Wheel Stops     3 Each
    Parking Space Cross Hatch Paint Striping     1 L.S.
    Handicap Signage     1 L.S.
    Existing Storage Building Siding Repair     1 L.S.
    Storage Building and Concrete     1 L.S.
    LE Range Baffles     1 L.S.
    100 Yard Shooting Structure and Baffles     1 L.S.
    30 Yard Shooting Structure and Baffles     1 L.S.
    Concrete Range Sidewalls     875 L.F.
    Backstops Eyebrows     280 L.F.
    LE Range Pole and Flood Lights     1 L.S.
    Electrical Service and Distribution     1 L.S.
    NPDES General Permit #2     1 L.S.
    Construction Staking     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




UNION -- PROJECT # 19-04-88-02                7/20/2023                Large Project Letting
THREE MILE LAKE
RESTORATION PHASE 2
Proposal Guarantee: $200,000
Completion Date: 3/15/2025

   This project consists of shoreline armoring, in-lake fish habitat placement, extending fishing jetties, removing deposited sediment from an existing sediment pond, constructing two earth-embankment sediment ponds, raising the existing in-lake silt dike, and stream mitigation work.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    CLEARING AND GRUBBING     1 L.S.
    EROSION CONTROL (SWPPP)     1 L.S.
    SURVEY AND STAKING     1 L.S.
    GENERAL SEEDING - GRASS SEED MIX     5.3 Acres
    BMP 1 - STRIP, STOCKPILE AND REPLACE 9" TOPSOIL     1,763 C.Y.
    BMP 1 - EARTH EMBANKMENT     5,412 C.Y.
    BMP 1 - 12" SMP     74 L.F.
    BMP 1 - CLASS "E" ROCK RIPRAP     13 Tons
    BMP 1 - STANDARD FLEXAMAT     16,142 S.F.
    BMP 1 - FLEXAMAT 10NW     11,021 S.F.
    BMP 1 - SEEDING - GRASS SEED MIX     0.5 Acres
    BMP 1 - SEEDING - COVER CROP     1.1 Acres
    BMP 1 - TIMBER POLE     4 Each
    BMP 2 - STRIP, STOCKPILE AND REPLACE 9" TOPSOIL     1,872 C.Y.
    BMP 2 - EARTH EMBANKMENT     5,822 C.Y.
    BMP 2 - 12" SMP     28 L.F.
    BMP 2 - FLEXAMAT 10NW     21,212 S.F.
    BMP 2 - SEEDING - GRASS SEED MIX     0.2 Acres
    BMP 2 - SEEDING - COVER CROP     1.5 Acres
    BMP 2 - TIMBER POLE     4 Each
    BMP 20 - WATER HANDLING     1 L.S.
    BMP 20 - REMOVE AND DISPOSE OF EXISTING 24" CMP     83 L.F.
    BMP 20 - STRIP, STOCKPILE AND REPLACE 9" TOPSOIL     126 C.Y.
    BMP 20 - TRENCH EXCAVATION, STOCKPILE AND BACKFILL     1,752 C.Y.
    BMP 20 - 42" SMP     82 L.F.
    BMP 20 - DREDGE     12,000 C.Y.
    BMP 20 - CLASS "B" ROCK RIPRAP     2 Tons
    BMP 20 - SEEDING - GRASS SEED MIX     0.1 Acres
    BMP 20 - TIMBER POLE     4 Each
    BMP 20 SPOILS - EARTH EMBANKMENT     1,572 C.Y.
    BMP 20 SPOILS - 12" SOLID WALL PVC & APPURTENANCES     65 L.F.
    BMP 20 SPOILS - 12" PERFORATED PVC RISER W/ SOCK     1 Each
    BMP 20 SPOILS - CLASS "E" ROCK RIPRAP     4 Tons
    BMP 20 SPOILS - SEEDING - COVER CROP     3.7 Acres
    IN-LAKE SITE DIKE - EARTH EMBANKMENT     4,863 C.Y.
    IN-LAKE SILT DIKE - OVEREXCAVATION     2,804 C.Y.
    IN-LAKE SILT DIKE - STRIP AND STOCKPILE 9" TOPSOIL     1,176.21 C.Y.
    IN-LAKE SILT DIKE - FLEXAMAT 10NW     53,101 S.F.
    IN-LAKE SILT DIKE - FLEXAMAT ANCHOR SYSTEM     1 L.S.
    IN-LAKE SILT DIKE - SEEDING - COVER CROP     1.8 Acres
    SHORELINE - STANDARD EROSION PROTECTION CLASS "E" ROCK RIPRAP     1,323 Tons
    SHORELINE - STANDARD EROSION PROTECTION EXCAVATION     928 C.Y.
    SHORELINE - SPECIAL SHORELINE PROTECTION CLASS "E" ROCK RIPRAP     10,726 Tons
    JETTY - EMBANKMENT     2,852 C.Y.
    JETTY - OVEREXCAVATION     1,049.72 C.Y.
    JETTY - LOW GRADE CLASS "D" ROCK     6,550 Tons
    JETTY - CLASS "E" ROCK RIPRAP     610 Tons
    JETTY - LIMESTONE CHIPS     24 Tons
    JETTY - EMBANKMENT     55 C.Y.
    JETTY - CLASS "E" ROCK RIPRAP     162 Tons
    JETTY - LIMESTONE CHIPS     11 Tons
    JETTY - PEA GRAVEL     23 Tons
    JETTY - EMBANKMENT     217 C.Y.
    JETTY - LOW GRADE CLASS "D" ROCK     80 Tons
    JETTY - CLASS "E" ROCK RIPRAP     190 Tons
    JETTY - LIMESTONE CHIPS     18 Tons
    JETTY - PEA GRAVEL     25 Tons
    FISH HABITAT - STANDARD ROCK REEF      4 Each
    FISH HABITAT - DOUBLE WIDE ROCK REEF     4 Each
    FISH HABITAT - ROCK FIELD     4 Each
    FISH HABITAT - ROCK PILES     5 Each
    FISH HABITAT - SPAWNING BED     30 Each
    STREAM MITIGATION - EXCAVATION (LOCAL SPOIL)     650 C.Y.
    STREAM MITIGATION - TRENCH AND BACKFILL     45 C.Y.
    STREAM MITIGATION - PLACE 9" TOPSOIL     204 C.Y.
    STREAM MITIGATION - CLASS "E" ROCK RIPRAP     201 Tons
    STREAM MITIGATION - CLASS "B" ROCK RIPRAP     220 Tons
    STREAM MITIGATION - 18"-24" DIA HARDWOOD LOGS     10 Each
    STREAM MITIGATION - LIVE STAKES     36 Each
    STREAM MITIGATION - SEEDING - FLOODPLAIN SEED MIX     3.3 Acres
    STREAM MITIGATION - SEEDING - COVER CROP     6.4 Acres
Alternate
    JETTY - EMBANKMENT     204 C.Y.
Alternate
    JETTY - LOW GRADE CLASS "D" ROCK     400 Tons
Alternate
    JETTY - CLASS "E" ROCK RIPRAP     284 Tons
Alternate
    JETTY - LIMESTONE CHIPS     21 Tons
Alternate
    JETTY - PEA GRAVEL     39 Tons
Alternate
    FISH HABITAT - STANDARD ROCK REEF      2 Each
Alternate
    FISH HABITAT - ROCK FIELD     4 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 23-01-30-05                7/20/2023                Small Project Letting
SPIRIT LAKE FISH HATCHERY
ADA LIFT AND DOOR
Proposal Guarantee: $0
Completion Date: 2/1/2024

   This project will provide improved ADA accessibility to the tank room of the Spirit Lake Fish Hatchery with a new automatic sliding door, handrail, and wheelchair lift between the two hatchery floor levels.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov