The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual. Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms, Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.
Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis.
To subscribe to this list, click here.
The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.
To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website.
You may obtain a free download from 
|
JOHNSON -- PROJECT # 10-06-52-07 6/24/2010 Small Project Letting
|
LAKE MACBRIDE CENTRAL SHOP
|
| SEPTIC LINE UPGRADE |
Proposal Guarantee:
|
Completion Date: 7/30/2010
|
| | This Project consists of the disconnection and
abandonment of the existing house sewer, construction
of new sewer from the house and connection to existing
sewer main, connection of shop sewer to proposed
sewer, demolition of existing house patio,
reconstruction of house patio after sewer line is in
place, and any incidental work as required by the plans
and/or DNR construction inspector.
Please
|
Contact: Heath Delzell (515) 979-0104 [email protected]
|
|
JOHNSON -- PROJECT # 10-06-52-01 6/24/2010 Small Project Letting
|
LAKE MACBRIDE STATE PARK
|
| CXT PAD AND PLUMBING |
Proposal Guarantee:
|
Completion Date: 8/31/2010
|
| | This project consists of preparing an 18" thick crushed rock pad for a Precast CXT Building, stub out plumbing underneath CXT Building and connecting utilities after building placement.
|
Contact: Heath Delzell (515) 979-0104 [email protected]
|
|
MUSCATINE -- PROJECT # 09-06-70-11 6/24/2010 Small Project Letting
|
WILDCAT DEN STATE PARK
|
| FOUNDATIONS FOR CXT BUILDINGS |
Proposal Guarantee:
|
Completion Date: 8/31/2010
|
| | This project consists of preparing two 18" thick crushed rock pads for Precast CXT Buildings, stub out plumbing underneath CXT Buildings and connecting utilities after building placement, and tree removal.
|
Contact: David Heer (515) 250-3719 [email protected]
|
|
DAVIS -- PROJECT # 10-05-26-02 7/1/2010 Small Project Letting
|
LAKE WAPELLO STATE PARK
|
| ROOF REPLACEMENT, REPAIR LODGE |
Proposal Guarantee:
|
Completion Date: 9/15/2010
|
| | This project consists of the replacement of the roof on the lodge at Lake Wapello State Park.
|
Contact: Jason Kruse (515) 250-3707 [email protected]
|
|
KOSSUTH -- PROJECT # 10-01-55-02 7/1/2010 Small Project Letting
|
SENECA WMA-STRUECKER TRACT
|
| INSTALL WATER CONTROL STRUCTURE |
Proposal Guarantee: $0
|
Completion Date: 9/3/2010
|
| | This project involves improvements to an existing water control structure. Work under this project includes a connection to the existing structure, installation of PE and CMP piping, and installation of a new water control structure and inlet pipe.
|
Contact: Jeff Felts 515-250-3712 [email protected]
|
|
MONTGOMERY -- PROJECT # 10-04-69-03 7/1/2010 Small Project Letting
|
VIKING LAKE STATE PARK
|
| NEW WATERLINES FOR CAMP ALDERSG |
Proposal Guarantee:
|
Completion Date: 9/15/2010
|
| | Replace 645 feet of 2" water main, two yard hydrants and valves.
|
Contact: Mark Johnson 515-250-3713 [email protected]
|
|
MUSCATINE -- PROJECT # 08-06-70-08 7/1/2010 Small Project Letting
|
FAIRPORT FISH HATCHERY
|
| REPLACE SHOP/LAB/OTHER WINDOWS(RE-BID) |
Proposal Guarantee:
|
Completion Date: 9/1/2010
|
| | This project consists of the removal, disposal, and installation of 9 aluminum 4'x6' windows and any other specifications as per the plans or DNR construction inspector.
|
Contact: Heath Delzell (515) 979-0104 [email protected]
|
|
WEBSTER -- PROJECT # 10-02-94-05 7/1/2010 Small Project Letting
|
DOLLIVER STATE PARK
|
| REPAIR FLOOD DAMAGES |
Proposal Guarantee:
|
Completion Date:
|
| | Furnish and place Class "A" in parking roadways and Riprap creek bank and parking area... ~ 416 Ton Class "A" & ~ 170 Ton Class "D" Riprap.
|
Contact: Don Labate 515-250-3714 [email protected]
|
|
JOHNSON -- PROJECT # 10-06-52-09 7/15/2010 Small Project Letting
|
LAKE MACBRIDE STATE PARK
|
| CXT WASTEWATER SYSTEM |
Proposal Guarantee:
|
Completion Date: 11/15/2010
|
| | This project consists of demolition of an old pit latrine and sidewalk, installation of a septic system which includes two septic tanks, a duplex lift station and a lateral infiltration field, electrical connections, pouring a new 4" PCC Sidewalk, and seeding, fertilizing and mulching.
|
Contact: Heath Delzell (515) 979-0104 [email protected]
|
|
WEBSTER -- PROJECT # 10-02-94-01 7/15/2010 Small Project Letting
|
BRUSHY CREEK SRA
|
| UTILITIES FOR - CXTSHOWER BLD |
Proposal Guarantee:
|
Completion Date:
|
| | Utilities for Shower Bldg. ~480 L.F. sewer line, manhole, lift station, ~595 L.F. water line, water hydrant, earthwork, electric, utilitiy hookups to bldg., PCC sidewalk
|
Contact: Don Labate 515-250-3714 [email protected]
|
|
DICKINSON -- PROJECT # 10-01-30-10 7/22/2010 Small Project Letting
|
BLACKERT WPA JEMMERSON SLOUGH COMPLEX
|
| WETLAND RESTORATION |
Proposal Guarantee: $0
|
Completion Date: 10/15/2010
|
| | This project involves the restoration of five wetland pool areas through use of dike construction, spillway excavation, and tile bypass. Work under this project includes excavation, earthfill, tile investigation, tile breaks, and tile installation.
|
Contact: Jeff Felts 515-250-3712 [email protected]
|
|
GUTHRIE -- PROJECT # 10-04-39-02 7/22/2010 Small Project Letting
|
SPRINGBROOK STATE PARK
|
| SEPTIC TANK REPLACEMENT |
Proposal Guarantee:
|
Completion Date: 9/30/2010
|
| | Replace the septic tanks and the lateral system for the park residence and office/maintenance building.
|
Contact: Mark Johnson 515-250-3713 [email protected]
|