PROJECTS LETTING -  June , 2012

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DAVIS 12-05-26-02 Lake Wapello State Park - restore CCC entrance portal-2012-06-21   Bid Completion detail
DELAWARE 12-03-28-01 Backbone State Park - CCC Cabin Renovation-2012-06-21   Bid Completion detail
DICKINSON 12-01-30-01 Kettleson-Hogsback WMA - Grover's Lake Renovation-2012-06-21   Bid Completion detail
WINNEBAGO 12-02-95-02 Rice Lake State Park - CCC Shelter Renovation-2012-06-21   Bid Completion detail
DELAWARE 12-03-28-03 Hartwick riffle, Delhi lakebed - Repair toe of riffle-2012-06-28   Bid Completion detail
LINN 12-06-57-13 Pleasant Creek State Rec Area - New Restroom Installation-2012-06-28   Bid Completion detail
DAVIS 12-05-26-02 Lake Wapello State Park - restore CCC entrance portal (2)-2012-07-05   Bid Completion detail
BOONE 12-02-08-01 Ledges State Park - Henning Shelter RR Conversion-2012-07-19   Bid Completion detail
CASS 12-04-15-02 Lake Anita State Park - 2 new shower buildings -2012-07-19   Bid Completion detail
LINN 12-06-57-04 Pleasant Creek State Rec Area - FEMA 2008 Trail Repair-2012-07-19   Bid Completion detail
PALO ALTO 11-01-74-04 Kearney State Park P&I - P&I roadwork-2012-07-19   Bid Completion detail
WEBSTER 10-02-94-02 Dolliver State Park - Pit Vault Latrine Replacement-2012-07-19   Bid Completion detail




DAVIS -- PROJECT # 12-05-26-02                6/21/2012                Large Project Letting
LAKE WAPELLO STATE PARK
RESTORE CCC ENTRANCE PORTAL
Proposal Guarantee: $5,000
Completion Date: 10/31/2012

   Demolition of existing historic monument sign (salvaging of limestone plaque). Construction of new foundation, concrete backingwall and limestone veneer (entire entry portal) as shown on the drawings. Grading of disturbed area and replanting of grasses and areas around construction zone.

ESTIMATED QUANTITIES:
    DEMOLITION AND REMOVAL OF EXISTING ENTRY PORTAL     1 L.S.
    RECONSTRUCTION OF NEW ENTRY PORTAL     1 L.S.
    GRADING AND EARTHWORK AROUND NEW PORTAL     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DELAWARE -- PROJECT # 12-03-28-01                6/21/2012                Large Project Letting
BACKBONE STATE PARK
CCC CABIN RENOVATION
Proposal Guarantee: $30,000
Completion Date: 2/28/2013

   Iowa DNR has decided to renovate eight (8) CCC cabins located in Backbone State Park. The cabin structures are in excellent condition while the exterior and interior finishes (renovation in 1997) are worn and in need of replacement. These cabins will be taken off the current insufficient foundations, placed on a continuous foundation wall and have a stained concrete floor. They will also be raised on their foundations to allow water to pass by without detrimental effects. All interior and exterior finishes shall be replaced as shown in the drawings.

ESTIMATED QUANTITIES:
    Clear & Grub     79 Units
    Excavation, Class 10, Roadway and Borrow     790 C.Y.
    Rock Excavation     100 C.Y.
    Topsoil, Strip, Salvage & Spread     677 C.Y.
    Mulch, Bonded Fiber Matrix     0.8 Acres
    Seed and Fertilize (rural)     0.8 Acres
    Silt Fence     1,512 L.F.
    Granular Subbase Material     290 Tons
    Sidewalk, PCC, 5"     599 S.Y.
    Portland Cement Concrete Pavement, 6"     452 S.Y.
    Sawcut Existing Asphalt Pavement Edge     187 L.F.
    Removal of Sidewalk     456 S.Y.
    Remove Underground Concrete Support Piers     96 Each
    Water Service Line, 1" PVC     346 L.F.
    Curb Stop and Valve Box     8 Each
    PVC Sanitary Sewer Lateral Pipe, 4"     439 L.F.
    Sanitary Sewer Cleanout     7 Each
    Mobilization     1 L.S.
    Painted Pavement Mark, Waterbourne / Solvent     1 L.S.
    ADA Parking Sign     2 Each
    Tire Stop     12 Each
    Removal / Selective Demolition of Eight (8) Cabins     1 L.S.
    Complete Renovation of Eight (8) Cabins     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 12-01-30-01                6/21/2012                Large Project Letting
KETTLESON-HOGSBACK WMA
GROVER'S LAKE RENOVATION
Proposal Guarantee: $5,000
Completion Date: 11/30/2012

   This project is designed to replace the existing tile drawdown system at Grover's Lake. The new system will involve a box culvert with stop logs, fish barriers and a catwalk. 1,350 feet of inlet channel will be excavated to replace the existing tile outlet and 800 feet of existing channel cleanout will also be required under this contract.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Clearing & Grubbing     1 L.S.
    Remove Existing Intake and WCS     1 L.S.
    Excavation, Inlet Channel     3,877 C.Y.
    Excavation, Outlet Channel Cleaning     264 C.Y.
    10'x8' Precast RCB w/ Curbs     30 L.F.
    10'x8' Open Top RCB w/ Buttress Wall     6 L.F.
    10' Wide Precast RCB End Sections     30 L.F.
    Precast Cutoff Walls     2 Each
    Granular Bedding     25 Tons
    RipRap (Class E)     80 Tons
    Galvanized Steel Catwalk Components     1 L.S.
    Aluminum Stoplog/Fish Finger Guides     1 L.S.
    Aluminum Stoplogs w/ Lifting Hook     1 L.S.
    Aluminum Fish Fingers w/ Winch Assembly     1 L.S.
    Seeding & Mulching     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WINNEBAGO -- PROJECT # 12-02-95-02                6/21/2012                Large Project Letting
RICE LAKE STATE PARK
CCC SHELTER RENOVATION
Proposal Guarantee: $10,000
Completion Date: 10/31/2012

   This project consists of the restoration of the CCC shelter in Rice Lake State Park. There shall be restoration of masonry, heavy timber. Replacement of the roof, some timber replacement, concrete slab replacement and other miscellaneous items as indicated in the drawings.

ESTIMATED QUANTITIES:
    Restoration of CCC Shelter     1 L.S.
    Selective Demolition and removal of existing CCC structure     1 L.S.
    CXT Cascadian Pit-vault and all related items     1 L.S.
    CRUSHED ROCK FOR PATHING     13 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BOONE -- PROJECT # 12-02-08-01                7/19/2012                Large Project Letting
LEDGES STATE PARK
HENNING SHELTER RR CONVERSION
Proposal Guarantee: $5,000
Completion Date: 11/30/2012

   This project encompass demolition of an existing pit toilet building, construction of a new Romtec restroom building, installation of a septic tank, construction of a sand filter for the wastewater treatment for the restroom and site restoration.

ESTIMATED QUANTITIES:
    Demolish and Dispose off Existing Pit Toilet Building including Access Path     1 L.S.
    Construction of a New Romtec Restroom Building Including Site Grading, Foundation, Electrical, Water and Sewer Hookups     1 L.S.
    Hand Dryer, Bobrick B-700, 220 V -Installed     2 Each
    4 inch PCC Sidewalk     48 S.Y.
    Drain Down Pit     1 Each
    2 inch PVC CL 160 Water Service to Drain Pit     30 L.F.
    4 inch PVC SDR 35 Sewer Line Connecting Septic Tank, Sand Filter and Discharge Pipe     100 L.F.
    1000 Gallon Two Compartment Precast Septic Tank Including Effluent Filter -Installed     1 L.S.
    A 10 ft. X 10ft. in ground Sand Filter with Distribution Box & Piping     1 L.S.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CASS -- PROJECT # 12-04-15-02                7/19/2012                Large Project Letting
LAKE ANITA STATE PARK
2 NEW SHOWER BUILDINGS
Proposal Guarantee: $20,000
Completion Date: 4/1/2013

   Project consists of demolition of a latrine and demolition of an existing shower building, the procurement and installation of 2 precast concrete shower buildings, necessary sewer, water, and electrical utilities, concrete flatwork, site restoration and incidental items as required by the project documents and the IDNR construction inspector.

ESTIMATED QUANTITIES:
    Demolition of Latrine     1 L.S.
    Demolition of Shower Building     1 L.S.
    Site Work & Building Connections     1 L.S.
    Class "A" Crushed Stone     210 Tons
    Sidewalk, 6" Concrete     147 S.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




PALO ALTO -- PROJECT # 11-01-74-04                7/19/2012                Large Project Letting
KEARNEY STATE PARK P&I
P&I ROADWORK
Proposal Guarantee: $7,500
Completion Date: 11/15/2012

    This project consists of PCC paving of the existing park roadways and incidental work as required by the plalns and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Excavation, Class 10, Waste     863 C.Y.
    Special Backfill     1,950 Tons
    Shoulder Construction, Earth     11.11 STA.
    Standard or Slip Form PCC Pavement, Class C,Class 2 Durability, 7 Inch      4,014 S.Y.
    Curb & Gutter, PCC     296 L.F.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.
    Site Restoration     1 L.S.
    Tree Removal     2 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WEBSTER -- PROJECT # 10-02-94-02                7/19/2012                Large Project Letting
DOLLIVER STATE PARK
PIT VAULT LATRINE REPLACEMENT
Proposal Guarantee: $5,000
Completion Date: 12/31/2012

   Dolliver's CCC Cabins and campground area need a year-round facility. Romtec's Dual Sierra pit latrine will do that while blending in with the surrounding architecture. Also in this contract will be the installation of mini-split systems in both cabins. This project will mimic a CCC style structure with large timber beams and a stone water-table around the entire structure.

ESTIMATED QUANTITIES:
    ROMTEC ASPEN PIONEER (IOWA PARKS CUSTOM) AND ALL ITEMS SHOWN ON DRAWINGS RELATED TO THE LATRINE     1 L.S.
    SPLIT SYSTEMS & INSTALLATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DELAWARE -- PROJECT # 12-03-28-03                6/28/2012                Small Project Letting
HARTWICK RIFFLE, DELHI LAKEBED
REPAIR TOE OF RIFFLE
Proposal Guarantee: $0
Completion Date: 8/3/2012

   Project consists of reshaping and furnishing & placing 640 ton of revetment Class 'E' riprap on existing riffle toe

Contact:
Mel Pacovsky
319-240-3553
[email protected]




LINN -- PROJECT # 12-06-57-13                6/28/2012                Small Project Letting
PLEASANT CREEK STATE REC AREA
NEW RESTROOM INSTALLATION
Proposal Guarantee:
Completion Date: 11/15/2012

   Procure and install precast flushing toilet with all utility connections resulting in a complete, operating system in the Pleasant Creek SRA in Linn County, Iowa.

Contact:
Bruce Flippin

[email protected]




LINN -- PROJECT # 12-06-57-04                7/19/2012                Small Project Letting
PLEASANT CREEK STATE REC AREA
FEMA 2008 TRAIL REPAIR
Proposal Guarantee: $0
Completion Date: 7/31/2012

   This project consists of repair/restoration of waterbars on the multiuse trail, and incidental work as directed by the DNR Engineer.

Contact:
Bruce Flippin

[email protected]